ML19312E702

From kanterella
Jump to navigation Jump to search
Amplifies Response to IE Bulletin 80-04 Contained in ,Stating That TMI-I Containment Design Pressure Was 60 Psig.Reiterates That Containment Design Pressure Is 55 Psig. Initial Response Accurate When Assuming 55 Psig Pressure
ML19312E702
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/20/1980
From: Herbein J
METROPOLITAN EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-80-04, IEB-80-4, NUDOCS 8006090419
Download: ML19312E702 (1)


Text

TN Metropolitan Edison Co' pany m

Post Office Box 480 g

Middletown, Pennsylvania 17057 717 9444041 Writer's Direct Dial Number May 20, 1980 TLL 233 Office of Inspection and Enforcement Attn:

B. H. Grier, Director U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pa.

19406

Dear Sir:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 IE Bulletin 80-04 In our response to Bulletin 80-04 of May 9, 1980 (TLL 228), we stated that the TMI-I containment design pressure was 60 psig.

In fact, the containment design pressure for TMI-I is 55 psig.

However, the statements made in our initial response are accurate when assuming the 55 psig design pressure.

Therefore, no further revision to our previous submittal is necessary.

Sincerely, e

V J. G. Herbein Vice President TMI-I JGH:DGM: hah cc: Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C.

20555 J. T. Collins B. J. Snyder 80 0600 DN 7 Q Metrocottan Ecson Company is a Memcer of the General Pubhc Utdities System