Advises That Insp of Containment Bldg Reveals That All safety-related & nonsafety-related Electrical Equipment Does Have Positive Anchorage.Response Action to IE Info Notice 80-21 & Drawings Encl
ML19312E598
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 05/30/1980
From: Linder F
DAIRYLAND POWER COOPERATIVE
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
IEIN-80-21, NUDOCS 8006050363
Download: ML19312E598 (16)


Text

{{#Wiki_filter:. c' D DA/RYLAND h COOPERAT/VE PO BOX 817 2615 EAST AV SOUTH

  • LA CROSSE. WISCONSIN 54601 (608) 788 4 000 May 30, 1980 In reply, please refer to LAC-6960 DOCKET NO. 50-409 Office c of Nuclear Reactor Regulation ATTN:

Mr. Darrell G. Eisenhut, Acting Director Operating Reactors Branch #2 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR) PROVISIONAL OPERATING LICENSE NO. DPR-45 SEISMIC DESIGN EVALUATION FOR ANCHORAGE AND SUPPORT OF SAFETY RELATED ELECTRICAL EQUIPMENT

REFERENCE:

(1) NRC Letter, Eisenhut to Linder, dated January 1, 1980

Dear Mr. Eisenhut:

We have inspected all safety related and non-safety related electrical equipment to determine that positive anchorage exists (load carrying mechanism other than friction). The following list of electrical equipment within the Containment Building was inspected and we have determined that positive anchorage does exist: (1) In Core Flux Drive System: Bolted and welded to steel grouted in floor. (2) Reactor Building Motor Control Center lA: Bolted and welded to steel grouted in floor. (3) Control Rod Drive Gas Readout Panel: Bolted to floor. (4) Shield Cooling Pumps: Bolted and grouted in floor. (5) Portable Hoist: Bolted and welded, has rail stops. (6) Control Rod Drive Mechanism: Bolted to pressure vessel. l [ 8006050 DO {

1 Mr. Darrell G. Eisenhut, Acting Director LAC-6960 Operating Reactors Branch #2 May 30, 1980 (7) Seal Injection Pump Motors: Bolted and grouted in floor. (8) Air Conditioner Units lA and 1B: Bolted to floor. (9) Emergency Core Cooling Pumps lA and 1B: Bolted to frame grouted in floor. (10) Motor Control Center IC, 1B: Bolted and welded to steel grouted in floor.- (11) Fuel Storage Well Pump 1A and 1B: Bolted to frame grouted in floor. The following list of e_ cctrical equipment within the Turbine Building and inspected and we have determined that positive anchorage does exist: '(1) 480-Volt lA and 1B Switchgear: Bolted to steel grouted in 1 floor. (2) 1A and 1B Gwitchgear Transformers: Welded to steel grouted in floor. (3) Unit Auxiliary Transformer: Bolted to steel grouted in floor. (4) Resistor Bank: Bolted to floor anchors. (5) Demineralizer Panel: Welded to steel grouted in floor. (6) Laundry Equipment Transformer: Bolted to floor anchors. (7) Turbine Building Motor Control Center 1B, 1C, 1D, lE: Bolted and welded to steel grouted in floor. (8) Laundry Equipment: Bolted to floor anchors. (9) Auxiliary Building Transformer: Bolted to wall steel supports to "I" beam. (10) All Auxiliary Miscellaneous Motors: Bolted to steel grouted in floor. (11) Generator Switchgear: Bolted to steel grouted in floor. i

Mr. Darrell G. Eisenhut, Acting Director LAC-6960 Operating Reactors Branch #2 May 30, 1980 The following list of electrical equipment within the Electrical Room beneath the Control Room was inspected and we have determined that positive anchorage does exist. (1) Generator Plant Battery Rack: Floor mounted and bolted to wall. (2) Reactor Plant Battery Rack: Bolted to floor. (3) Generator Plant Battery Charger: Bolted to floor top conduit supports. (4) Reactor. Plant Battery Charger: solted to floor top coaduit supports. (5) Reactor Relay Panel: Bolted to floor. (6) 1A, 1C, Small Inverters: Bolted to wall. (7) Turbine Building Motor Control Center lA: Bolted to floor. (8) Control Room Air Conditioner: Bolted to floor. (9) Generator Plant Protective Relay Panel: Shock mounts bolted to floor, upper panel support shock mounts bolted to wall. The following list of electrical equipment within the 1B Electrical Equipment Room was inspected and we have determined that positive anchorage does exist.- (1) 480-Volt Essential Switchgear lA and 1B: Bolted to steel grouted in floor. (2) 1B Inverter: Bolted and welded to steel grouted in floor. (3) 1B Battery Charger: Bolted and welded to steel grouted in floor. (4) Electrical Switchgear: Bolted and welded to steel grouted in floor. (5) 1B Battery Rack: Bolted to floor. (6) 1B Diesel Generator Control Panel: Bolted and welded to steel grouted in floor. f

Mr. Darrell G. Eisenhut, Acting Director LAC-6960 Operating Reactors Branch #2 May 30, 1980 A vertical control panel is one continuous unit bolted section to section and floor supported. The panel is bolted to shdek mounts that are welded to steel grouted to the floor.. The upper section is back supported by bolted shock mounts to wall. The benchboard control panel is one continuous unit bolted section to section and floor supported-the panel is bolted to shock mounts that are welded to steel grouted to the floor. Other miscellaneous motor control centers located in the Crib House and the Waste Treatment Building are bolted and welded to steel grouted in the floor. Atta:hment 1 to this letter contains a copy of an internal plant memo dealing with our response action to IE Information Notice No. 80-21, " Anchorage and Support of Safety Related Electrical Equipment." This attachment includes copies of Sargent and Lundy Engineers mounting standards utilized at this plant. If you have any questions about this information, please contact us. Very truly yours, DAIRYLAND POWER COOPERATIVE A% ,d a Frank Linder, General Manager WRN: abs

Enclosure:

e. + w

ATTACHMENT 1 MAY 30, 1900 TO:' R. E. SHIMSHAK, LACBWR SUPERINTENDENT FROM: W. R. NOWICKI, LACBWR INSTRUMENT & ELECTRICAL SUPERVISOR ~

SUBJECT:

IE INFORMATION NOTICE NO. 80 ANCHORAGE AND SUPPORT O_F SAFETY-RELATED ELECTRICAL EQUIPMENT REF.: (1) NRC Letter, Eisenhut to Linder, dated January 1,

1980, Regarding Seismic Design Evaluation for Anchorage and Support of Safety Related Electrical Equipment.

(2) DPC Linder to Eisenhut, dated May 30, 1980, LAC-6960, (attached). (3) Sargent & Lundy Standards EB-122, 133, 135; EE-138, 142, 173; EF-241, 246, 248, 249; EB-686 (attached). In addition to the inspection conducted in mid May 1980, for evidence of positive anchorage of. electrical equipment, the following items listed in the NRC IE Information Notice No. 80-21 were inspected. (1) Emergency Diesel Generator lA and 1B Room Heaters consist of a metal frame bolted to anchors in concrete wall. (2) Emergency Diesel Generator Start Batteries in metal frame bolted to anchors in concrete wall and floor. (3) Emergency Diesel Water Pump Start Batteries in metal frame bolted to wall and anchors in concrete floor. (4) Cable Trays are secured by unistrut bolted to "I" beams or threaded rod secured to "I" beams or anchored to concrete. (5) Instrument Air System Dryers are bolted and grouted to the concrete floor. Upper end supported by piping. By my observation and the review of the Sargent & Lundy Standards which governed the installation of our equipment, the components at the LACBWR seem to be well anchored. WRN: abs

ATTACHMENT 1 1/2" - 2 unit Cinch anchors, & 1/2"x 1-3/4" Ilexagon head bolt. See STD-EF-163. ) l 6" e p,. Building Steel //b?/////. '// i$llIIIC$lA y ~ =. ;- ~~i j j l .t 1 1 -f = \\ sj-; Z 3"x 3"x 3/16" angle 4 7"x2"x3/16"angleO 2 2"x 2"x 3/16" angle DETAIL 122A DETAIL 122F 3/8"x 4" 7 Building / 2 z.. i ',fbar Drill for Steel l8 7 "b h 3- ~~~ 1/2" bolts. !l V,1,'

==== = =\\

&9

=

==r 3

=

. \\ (_/viaueat. 3.p f \\__ / .j v..n </ ,.,- --o-y(;/ V'* '** *W / h 4G ij ,g/- "T A i DETAIL 122B DETAIL 122G The size of the horizontal llanger angle } or channel is specified in the llanger Tabulation. g.. =u"oD 6' ]t 4 -*8

  • O NOTES:

= -,$ }- f .ph

1. All Field welds to building I

steel must always be para- // / ' A 3/8"x 4" bar./ \\ Drill for 1/2" bolts. 11e1 to the web of the col-umn r beam. DETAIL 122C

2. See STD-EB-121 for Hanger Specifications.

$d_ g l sff v o ~~ ~ sFee & Mason Steel Coupling (or equivalent). Furnish with lisnger rod. 2" thread 1/2" dia. Steel rod. / p N his dimension is specified # T in the llanger Schedule. }{ ANGER DETAILS Two hexagon head nuta shall 6" thread / be furnished with each j/ llanger rod. ?o .e.t.. n wes... ..noasr i.unov ] a, ". 2. #:.. o enicano ..,.. i ca i..n. ^" DETAIL 122D DETAIL 122E STD-Ell-12 2 ~,-n

ATTACHMENT 1 Sao Nsta No.2B on STD-EB-121. l I Nb\\ db b 'I 'b \\ Building ace of Steel Masonry Field weld-see Detail 122D \\1/2" dia., rods,/ se 4 see Detail 122D. 1/2" dia., rods,---* 'see Detail 122E. Elevation "Z" s Elevation "Z" x all 1ll ' l' t I g,, ny, M e er "Y" J L

_ L i

I A* d a ' 'u - C C -a DETAIL 133A DETAIb 1333 See Note No.2B on STD-EB-121 Building Steel b\\ 1 \\ Face of Face of Masonry Field weld-- Masonry j 8 1/2" dia. rods,* 12 D* see Detail 122D. Sea Detail 122E. y 4 1/2" dia. < 1/2" dia. rod a rod-see p see Detail Detail 122E. 122D. Elev. "Z" Elevation "Z"g $ lev + "Z" jg tll l Iv "Y" J. ember til Member "Ya o . y., o o C-k" ~* $

  • A k':

DETAIL 133C DETAIL 133D DETAIL 133E l NOTES:

1. See STD-EB-121 for speci'ications.
2. For Details No. 1228 nru 122G, see STD-EB-122.
3. The size of Hessner "Y", and the elevation "Z",

the quantities, and the dimensions A,B,C,etc., are shown on the Hanger Tabulation. HANGERS

4. Sargent & Lundy's erection drawing shows the ROD VERTICALS I

location and identifying numbers of the hangers, .m. NoNa me.aserai.umo, y .ea w a E. smes,asame /

2. I M

\\ ,...... 3-8 -SL. _ _ S M DARD . 3 0 t=.$1 4 ta W STD.EB-133 l w .y., y y-- y p ,,,,._.,.,_.,-,-,e--.----p*,.,---g-,,.,.,,-e,w-- ---w---..----w-.y.--

ATTACHMENT 1 SeeNoto50.2BonSTD-EB-121) i Mk my Face of Masonry ' Building Stee1 # L,1 o Field weld-see 1/2" dia. rod-sese Detail 122D. Detail 122E. 1/2" dia. rod-see See Detail 122C. Detail 122D. m I m = > Field weld-see Detail 122G. I' Elevation "z"s Elevation "Z"s U Member "Y" [ Member "Y" q, -- C ---+s( C c DETAIL 135A DETAIL 135B See Note No.2B on STD-EB-121 k A Building Steel s ,) h Face of Masonry # ) Field weld-see 1/2" dia. rod-see ' t Detail 122D. Detail 122E.- i 1/2" dia, rod-see Field weld-see ) A Detail 122D. -Detail 1220. See Detail 122C. / Elevation "Z'( Elevation "Z"s U 7 Member "Y" 3-Member "Y" i

ka-c C

C -D i ^ Building Steel

  • --Face of Masonry DETAIL 135D DETAIL 135C NOTES:
1. See STD-EB-121 for specifications.-
2. Far Details No.122A thru 122G, see STD-EB-122.
3. The size of Member "Y", and the elevation "Z",

the quantities, and the dimensions A.B.C, etc., HANGERS are shown on the Manger Tabulation. ROD VERTICALS l

4. Sargent & Lundy's erection drawing shows the location and identifying numbers of the hangers.

j . m...a w a..... ) .eemse E.1s&.. EteG8904 er....

1....El;E

===o ..so t. 3T r M#EW STD-E1-111,g '"-'"""**"m .iee+w m- -,, _

ATTACHMENT 1 ,Structurol stool, roof purlin, Conduit fitting co or supplem ntary cngle iron. nstad on construction Ccaduit (uso fIcxible drawing. Install bicnk if suitable). cover. ( Field We3d -W \\ / s NG Suitable mounting Reducer, if required. steel, plate, channel 3/4" x 3/4" flexible or bracing bar, for ballest or j fixture hanger, ball transformer, shall be provided 4 by the Electrical Contractor. hanger type. Locate and mount as required. n 3/4" heavy-wall conduit. Length determined froe Mercury lamp ballast, or trans-former, enclosed, constant wattage, mounting height. high power factor type. Mount with // s \\, High bay reflector unit, capacitors on bottom for maximum a' cooling. J 3/4" pendant type. 's / Mercury lamp phosphor coated, l/ color-improved. FIXTURg PETAIL Mount flush with bottom of roof truss or girder. S&L Lamp Ballast Approx. Fixture Size Rating Watts

  • No F 166 400 W.

400 W. 450 F 167 700 W. 700 W. 770 F 168 1000 W. 1000 W. 1100 NOTE: Wiring connections shall be made in accordance with the diagram on the nameplate. l MERCURY HIGH BAY REFLECTOR UNIT F 166 TO F 163 884WW gN ua. eu e. usa 890 8MSERS exece..e i, STANDARD ]

  • Includes ballast loss 1

STD-EE-138 a

ATTACHMENT 1 ,Safcty swivel gover ter u:o [ Cat. No. 8488 covar pinto le Sarsty swivel cov:r required only wh2n cttaching swivel cover No. 8438-R to a [ fcr use with 4" i with 4" octagon b:x. 1 octagon box. 4-11/16" equare box. ~ y y.f. Swivel cover ,f .1~ r t. m I 1/2"RigidSteel/ Conduit. ,EA M /h / - "i Frismatic glass low bay reflector /~~3 unit.1/2"pendenttype._ 4. FIGURE 1 FIGURE 2 to Ji a $ 5 o y S&L Appleton Elec.co Holophane m Fixturo Fig. Lamp Swivel Adapter For Use With Cat. ) No. No. Jize Cover Cover No. j y 615* F 175 1 100W. 8435-R 615 F 176 1 150W. 4" Octagon Box 684 F 177 2 200W. 685 F 178 2 300W. 685 F 179 2 500W. F 180 1 100W. 8438-R 8A98 615* 615 F 181 1 150W. 4-11/16" Square 684 F 182 2 200W. Box 685 F 183 2 300U. 685 F 184 2 500W.

  • Use medium base socket extension, Benjamin Cat. No. 91 N

W4 BAY

1. Mounting height of fixture is given on the REFLECTCR UNIT Construction Drawing.

F 175 TO F 184 u. ) maevee. - t cuscseo

".;;;:::!4:ll.$

=

23:3.?

STo-EE-ic2

ATTACHMENT 1 f " estegonal cutlot box with Eys-belt welded to stssi, 4 or anchored to concrete. I bushed cover, Appleton Cat. No. 8402-A. //////////////////X/// ///> " Y" -Up to 2'-O" suspension. "S" hooks, top and bottom. y M Chain suspension with -3/c-#16TypeSrubber cord. Fluorescent fixture, ~ k Use "S" hooks to secure A ft;. to 8 ft. Icng.' I e M to c W. DETAIL "173A" TYPICAL FIXTURE MOUNTING Bushed wire entrance. SHORT SUSPENSION Eye-bolt welded to steel, 4" octagonal outlet box, or anchored to concrete. with bushed cover, Appleton Cat. No. 8402-A. ////////////. /// // "V" shapo double chain [" -More than 28-O" suspension suspension with "S" hooks, L 3/c-#16 Type S rubber cord top and bottom.- I p 'Use "S" hooks to secure Fluorescent fixture, -{# cord to chain. A ft. to 8 ft. long.s 0 - Bushed wire entrance. .Whero an angle iron bracket DETAIL "173B" is required, sufficient TYPICAL FIXTURE MOUNTING l over hang rust be provided LCNG SUSPENSION I g for chain attachment. \\ l I hl \\ l Double chains for long Approx. g suspension, (Detail "173S").- i g I 15~* - 20 I -Single chains for short / I PI suspension, (Datail "173A")." g,1 Chain hanger slot, or g f I ' 1/4" eye-bolt with "S" hook "S" hook g/ nuts and lockwasher. 'gSliding clamp hanger, t with 5/16" hole. O O f* f h f DETAIL "173D" DETAIL "173C" FLUORESCENT STRIP UNIT N Mounting heights are shown on the Constructicn Drawings. NOTES: I M ORESC M INDUS M

1. Fixture chain shall oe Tenso or Brown type chain No. 3,

& STRIP UNIT sherardized finish, 400 lb. tensile strength, wire l gauge.083", with link length of li". NON-EC TYPE J

2. Chain, "S" hooks, eye-bolts, anchors, and bushed wire entrances, shall be furnished by the Electrical Contr-

,,,E.9.4,,,,,,,,. anesassas calCASO ~ actor. C.:'*MM-$' srasoAno STD-Es-t73 e ,__n,

ATTACHMENT 1 Detail "A" hales cro used cnly for enchsring Datail "B" holco oro u3sd cnly when tha b:s3 in positica, in er en tha floor, and ,ths hsusing to to bs bolted to for filling the channel with grout after the ' the base, and are spaced by the channel base is anchored. These holes must not manufacturer to suit the equipment ) be used for fastening equipment or housing to to be mounted the base. They may be spaced to suit the manu-facturer, but to not more than 3'-0" l i LM:::::W~_ _~:%A~'"K__~_i'~XV Detail"A" hole \\s l Not more than 3'-0" 1-1/2" x 1/4" flat bar (see below) Channel size determined by manufacturer. i! __ _ _.... 4,... - --....k.... - -. - %,.%, t,. - 4_- =t.. +- PLAN OF CHANNEL BASE Channel size determined by manuf acturer. Grout hole shall be not less than 1-1/2" x 1/4" flat steel bar, 1-1/2" dia., but 2" dia, grout 1 welded to toes of channel, on holes are preferred when size of channel permits. center line of grout holes. f,-h f Drill 9/16" dia. hole on center line of grout hole, for 1/2" -W% 1/2" dia base anchoring bolts will ) dia. anchoring bolts. 4' be supplied by Purchaser. u SHOWING DETAIL "A" OR GROUT AND BASE ANCHORING HOLE Eolted Mounting; Welded Mounting: When it is desired to mount the J When it is desired to mount the housing by bolting, holes in the / " -T housing by welding, the holes in l i Ti I the bottom of the housing nor:nal-channel, with nuts welded to d d5--"-f ly used for bolting, may be re-the inside of the channel - N tained and used for spot welding must be provided as shown. -- The hold-down bolts shall be b \\ the housing to the channel base. furnished by the manufneturer and shipped with the channel base. Sil0 WING DETAIL "B" OR EQllI:NENT MOUNTING HOLE NOTES:

1. The base shown here-on is normally used when anti-vibration bases are not specified.

When anti-vibration mounting is used, Detail "B" taount-CHANNEL BASE FOR ing shall be modified to suit the anti-vibration mount-MOUNTING ELECTRICAL EQUIP. ing requirements. -WEB HORIZONTAL-

2. The base shall be shippnd separntely and in advance of the equipment, so that it may be installed and ready j

to mount the housing. .. tAA suoinerne APPROVS9 s. CHICASO STANDARD sv e... r STD-EF-241 -.m__-,-...-__m...-

ATTACHMENT 1 'Tha ah nnst becco mu t ba chism:d to o B: fero cny cquipmint io scuntad en tha trua cnd Icvel hsrisental plcna, whila ch:nnaio, o gr:ut censicting of. ens part being securely bolted down in place. sand and one part cement, with enough 'T This should be checked with a dependable water so that it will flow smoothly, J spirit level, applied to each channel, shall be poured thru the grout holes and between channels at front and rear, in the channels, until the inside of before the channels are grouted in place. the channels, and the area below them, are entirely filled. Channel anchor bolt. Size of channels shown on Finished floor. S&L Construction Drawings. i l Crout holes in channel. Rough slab. - nm w ~ GG%QM N:R$}% @4$fh @$ M @eg.f$ W M.GG W N.kb I ggig.v:sft weunee w. Finished floor and :. v 1/2"-2 unit I t,- -1/2"-2 unit rough sinb eleva-L-< J Cinch anchor '-,' J Cinch anchor i tions are shown on the Construction ' Trench in rough slab, when necessary, is shown on the

Drawings, Construction Drawings.

SECTION THRU FRONT AND REAR CHANNELS / 'The space between the front and rear' ' The icvel of the finished floor, channels may.be poured at the same outside of the channel bases, varies time as the channels are filled with with the requirements of the type or grout, but care must be taken that make of the housing being used. the surface of this floor inside of See the Construction Drawing for this ,the housing does not project above the finished floor elevation. level of the channel base. NOTES:

1. The equipment or housing shall be welded to the above channels with a 3/16" weld, 1" long, on 3'-0" maximum spacing, on both front and rear.
2. For detatis of the equipment and plan of the channel bases, see the Construction drawings of Sargent & Lundy, and the manufacturer.
3. In this construction, the tops of the channel bases are at the same elevation as, or below the level of, the finished floor.
4. The slot in the rough slab, shown 1" below the bottom of the bars welded to the channels, is not required when the elevation of the rough slab is lower than this dimension.

-METHOD 1-INSTALLING CHANNEL BASES FOR MOUNTING ELEC. EQUIP. -WEB HORIZONTAL- .. w.. *9 M....... sanonne a t.unov . ht.A.,,(// anosmanne w m essa... C J B - cuscAeo }

".;;,."i$$

s = =ao .6.!O too I STD-EF-246

ATTACHMENT 1 Ths 25 x2" x3/16" found:;tien angits, which tre o part of ths poured pad, shall be Isetonatrueandlevelplane. This shall be checked with a dependable spirit level, applied to each angle, and between angles at front and back, before the ) angles are concreted in place. ~ Fasten the front and rear channel bases i to the pad angles with 1" long welds F uipment to be mounted.) 4 on approx. 38-0" centers. ,l -V V i i Y-1,,7 - ~ ~.- ~ ~:=====~== = ~===:== = ~ T 7.~.~."kI $r Channel bases O f ^ 4 r; gee p.;r s..:..w.e.v...m ae..y.mvm.q.g y- .~. 4..t N.. r .'c[g .:v. _ - _. _ N-A R 4 i :... :. >. t. '.. :.*..~... :.. *...'. \\.:. %.:.. :.. ~ <. -f3'$' - foughslab\\ y. ' !.$.*.-Q0Ji/; :.T.::*/; a.; ;Ga_f. f :56R05SSY Thd![*N #~ iE#~i'*- Y '# _ ' W I "I ~ The elevations of the rough slab. The finished concrete area of finished floor, and the top of the pad between the corner the pad, are specified on the angles, shall be level with the Construction Drawings. horizontal legs of the angles. 1 1 NOTES:

1. For details of the equipenent, and the details and

-METHOD 3-location of the foundation, see the Manufacturer's and INSTALLING CHANNEL BASE Sargent & Lundy's Construction Drawings. FOR MOUNTING ELEC. EQUIP. -WEB HORIZONTAL-seaLa. 7n. SAmetMT4LUNDY j naasses M....... EMotNagne acenoveo. 48 .s. CHICAGO eus.... 7.: mavieso...L L5 foo STANDARD STD-EF-248 - - - - - - - - ~ - - - ~ ~

ATTACHMENT 1 Tha 2" x2" x3/16" fcundatien angles, which era a part of tha pour:d pad, shall be f set on a true and level plane. This shall be checked with a dependable spirit level, applied to each angle and between angles at front and back, before the angles are concreted in place. Equipment to Fasten the front and rear channel bases to the pad angles e mounted. with 1" long welds on approx. 3' 4" centers. (A 'Z4-7/' o Y -. ===, =..=:= = :.:::=.=.. =.==. s / 'I \\ ? g l Channel bases. l wl h A mW$ Finished p'.* i * ..,,,.,..,. ;..,. fi,;--. ll. W',,. , s.;. r...;.a.:'.... M* * '

  • 1 em. '

*"~'" "~ floorT '~' f s 0n. ' r.:u t..- ...e, ---- f ough slab.\\ bl. '.. Y :v YA'S7*# R < ' ? -.*... .....:,..........*.:.!'.'.'.1 u ' W S M,6. % 'J.'.'f*. S yjf.I,.'. 4'. O '* 9.0 N * # 7 9 "- j ',,"y.,*,(;1' * ',%* p.$,f,,F *W.V.2 W ' CROSS SECTION \\ The elevations of the rough slab. The finished concrete area of Finished floor, and the top of the the pad between the corner pad, are specified on the Construction angles, shall be level with the

Drawings, horizontal legs of the angles.

NOTES:

1. For details of the equipment, and the details and

-METHOD 4-location of the foundation, see the Manufacturer 8 s and INSTALLINC CHANNEL BASE Sargent & Lundy's Construction Drawings. FOR MOUNTING ELEC. EQUIP. -WEB VERTICAL-a s... :*......... sanese a waev ) enawe E g*. sweinsses apeeves.. CHICAeo h STANDARD STD-EF-249 i

ATTACHMENT 1 i e Cchio pan cccti:n2 chall be ep:csd 1/8" cpart, Cablo pan before weldies. ^ I Back-up bar k l~ 7 -Cable pan section. -} f h ! 7 l N Back-up bar. .[ t:2.t::.-::[ 686V 686V h - Cable pan section. _j h J o SECT. 686V

  1. The sides, and 2" only on top and bottom, shall be continuous butt DETAIL SHOWING METROD OF ASSEMBLING weld, equal to the strength of CABLE PANS AND RISERS IN THE FIELD.

the pan material. The remaining bottom portion of the l l joint, between the continuous welds on each side, shall be joined with 1" long welds, on l'-0" centers. NN .,l Spaca riser section 1/2" from k-the wall unicas otherwise l specified. e, U,- q f 1/2" Dia. Bolt ) l!% Spacer made from 1/2" pipe. Riser section. 1-1/2" - 2 unit Cinch anchor. DETAIL SHOWING TYPICAL METHOD OF INSTALLING RISER SECTION TO WALL l NOTES:

1. See STD-EB-603 for Cable Fan System Field Installation FIELD ASSEMBLY AND Specifications.

INSTALLATION DETAILS FOR CABLE PANS AND RISERS n e..m.9ar a.... .. ev a tumov .m anoinesne m ewscaeo . m s r.ss.... STA ND AR D 4 .sv e ne........... STD-ES-666 t ..}}