ML19312E595
| ML19312E595 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/19/1980 |
| From: | Harold Denton, Dircks W Office of Nuclear Reactor Regulation, NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML19312E397 | List: |
| References | |
| NUDOCS 8006050359 | |
| Download: ML19312E595 (10) | |
Text
.
NRC 9 (175) 9 N R UNITED STATES C
NUCLEAR REGULATORY COMMISSION ANNOUNCEMENT NO. 26 DATE:
March 19,1980 TO:
Directors of Offices, Divisions and Regional Offices, Assistant Directors and Branch Chiefs
SUBJECT:
RE0RGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION The Office of Nuclear Reactor Regulation is being reorganized to reflect the nature of the expected workload during the next few years, to pennit the most effective implementation of recommended changes and improvements identified by the various TMI accident investigations, and to provide for the most effective and efficient utilization of available resources.
Some of the major features of the new organization are as follows.
(1) A new Division of Human Factors Safety is devoted totally to supporting the operational and people-oriented aspects of safety.
(2)
All project managers are consolidated into a Division of Project Management, thus promoting the expansion and strengthening of the authority and responsibility of the project managers.
Technical disciplines are largely cen-tralized into a Division of Engineering and Division of Systems Integration, thus eliminating diffusion of technical expertise and assuring effective interchange and application of reystrements and experience between operating plant and licensirig reviews.
(3)
It maintains, reinforces and institutionalizes a separate organizational element, a Division of Safety Technology, for the timely development of solutions to generic safety issues L
as well as other management and procedural improvements which l
NRR has evolved since the TMI accident.
(4l The organization as a whole is designed to provide an inter-disciplinary systems approach to licensing reviews, operating problems and generic issues, 90 O gof0 3
l l i The organizational structure and supervisory / management assignments at the branch chief level and above are shown on the accompanying charts.
The following eight vacant SES positions will be posted and filled competitively.
8 (1) Director, Planning & Program Analysis Staff (2) Deputy Director, Division of Human Factors Safety Chief, Licensing Projects Branch 3 Chief, Systematic Evaluation Program Branch Chief, Human Factors Engineering Branch Chief, Emergency Preparedness Branch Chief, Operating Experience Evaluation Branch
- 8) Chief, Reliability Assessment Branch We intend to implement this new organization as soon as practicable.
Functional descriptions of the components, as well as other details, are being developed and will be issued shortly as revised NRC Manual Chapter 0123.
/4 *r M S b _
Harold R. Denton, Director Office of Nuclear Reactor Regulation h:
J.)-um Ms2 ApproYe..y 'd:
William J. Dircks, Acting, EDO
Office of Nuclear Reactor Regulation Director Harold R. Denton Deputy Director Edson G. Case Planning & Program TMI Program Office Analysis Staff Pmg a$a t" Va aca Deputy Program Manager John T. Collins
_ Resource & Scheduling Branch Frank J. Miraglia, Chief
_ Management Analysis Branch Herbert N. Berkow, Chief
_ Technical Support Branch William T. Russell, Chief 1
'i Division of Project Division of Division of Systems Division of Human Division of Safety
(
Management Engineerin9 Integration Factors Safety i
Technology
)
i h
t i
4 Division of Project Management Director Darrell G. Eisenhut Deputy Director Robert A. Purple i
Assistant Director for Operating !
Assistant Director for Licensing Assistant Director for Projects Reactor Management Management
& Technology Thomas Novak Richard P. Denise Brian K. Grimes I
i
- Operating Projects Branch 1
- Licensing Projects Branch 1 Operating Projects Branch 5 Steven A. Varga, Chief B. Joe Youngblood, Chief Dennis M, Crutchfield, Chief
_0perating Projects Branch 2
_ Licensing Projects Branch 2
_ Systematic Evaluation Program Branch Thomas A. Ippolito, Chief Albert Schwencer, Chief Vacant O
~ perating Projects Branch 3 Licensing Projects Branch 3 Operating Reactors Evaluation Branch Robert A. Clark, Chief
- Vacant Gus C. Lainas, Chief Operating Projects Branch 4 Special Projects Branch
_ Emergency Preparedness Branch Robert W. Reid, Chief
- James R. Miller, Chief Frank G. Pagano, Chief (Acting) 4 I
D 5
h 4
Division of Engineering Director Richard H. Vollmer I
l g
Assistint Director for Components Assistant Director for Materials &
l Assistant Director for Environmental
& Structures-Engineering Qualifications Engineering Technology James P. Knight Vincent S. Noonan Daniel R. Muller Mechanical Engineering Branch
-Materials Engineering Branch Environmental Engineering Branch Robert J. Bosnak, Chief Stefan S. Pawlicki, Chief Ronald L. Ballard, Chief
_ Civil Engineering Branch
_ Chemical Engineering Branch
_ Siting Branch Franz P. Schauer, Chief Victor Benarnya, Chief William H. Regan, Chief Geosciences Branch Environmental Qualifications Branch Utility Finance Branch Robert E. Jackson, Chief
- Zoltan R. Rosztoczy, Chief Jerome D. Saltzman, Chief Hydrologic Engineering Branch Quality Assurance Branch George E. Lear, Chief Walter P. Haass, Chief l
i l
l i
~
i
Division of Systems Integration Director Denwood F. Ross l
I I
I Assistant Director for Assistant Director for Assistant Director for!
Plant Systems i
Radiation Protection Reactor Safety Paul S. Check l
William E. Kreger i
Robert Tedesco Instrumentation & Control f Accident Evaluation Branch
- Reactor Systems Branch l
Systems Branch Robert W. Houston, Chief Themis P. Speis, Chief l
R:dney M. Satterfield, Chief Power Systems Branch h Radiological Assessment Branch
- Core Performance Branch Faust Rosa, Chief Thomas D. Murphy, Chief Lester S. Rubenstein, Chief l
b Containment Systems Branch Effluent Treatment Systems Branch
- Systems Interaction Branch Walter R. Butler, Chief William P. Gammill, Chief John F. Stolz, Chief l' Auxiliary Systems Branch Olan D. Parr, Chief 0
=-
4 Division of Human Factors Safety Director Stephen S. Hanauer Deputy Director Voss A. Moore (Acting)
- Human Factors Engineering Branch Vacant
- Operator Licensing Branch j
Paul F. Collins, Chief Licensee Qualifications Branch Domenic B. Vassallo, Chief
- Procedures & Test Review Branch Dennis L. Ziemann, Chief C
4 4
e 4
0 4
~
Division of Safety Technolcgy I
Director 4
Roger J. Mattson I
Assistant Director for Generic Projects Assistant Director for Technology I
Review
{
Frank Schroeder
[
Malcolm L. Ernst
! Generic Issues Branch Karl Kniel, Chief
_ Safety Program Evaluation Branch Robert L. Baer, Chief i
- Licensing Guidance Branch l
Donald J. Skovholt, Chief
_ Operating Experience Evaluation Branch Carl H. Berlinger, Chief (Acting)
Research & Standards Coordination Branch Reliability Assessment Branch George W. Knighton, Chief m
Vacant i
4 i
e h
~
EZZ_
4j ACTION CONTROL DATES CONTROL NO i
FHOM:
COMPL DEAOLINE j f f t/m l
EII. d+ I NIM /
DATE OF DOCUMENT l
Fwnasselur Polytechnic Institute ACKNOWLEDG MENT INTERIM REPLY g f ] q f _. 3 PREPARE FOR BIGNATURE l
}
TO:
CHAIRMAN O EXECUTIVE DIRECTOR hJf.04l$$lQ4Cr d}ggrfgg FILE LOCATipN *
,r / 4' OTHER: thnt?M f
SPECI AL INSTRUCTIONS CR REMARKS D ESCRIPTION O LETTER O MEMO O REPORT O OTHER re efforts to set up a aceting to discuss tua nce.1 for fucreased trainiW) Of utility wicatives i operational perswool. And tin ss role tu: ulursities en play in the pruci CLASSIFIED DATA
'CLASSIFIC ATIONl DOCUMENT / COPY NO.
ggggQ CATEGORY NUMBER OF PAGES O NSI O RO O FRO l
POST AL REGIST RY NO.
LEGAL REVIEW O FINAL 0 Copy f
ASSIGNED TO:
DATE INFORMATION ROUTING NO LEG AL OBJECTIONS ASSIGNED TO:
DATE
[
dentOn 3 / _"6 /.10
$jfCK$
NOTIFY:
a EDO ADMIN &CORReSen Cornell f
EXT.
?.Si'J4 COMMENTS. NOTIFY:
EXT.
0 YES O NO
.lCAE NOTIFICATION RECOMMENDED:
{
DO NOT REMOVE THIS COPY EXECUTIVE DIRECTOR FOR OPERATIONS I
NRC FOAM 232 PRINCIPAL CORRESPONDENCE CONTROL O
Y
M* ]h N).
Logging Dat) 3/24/80 NRC SECRETARIAT TO*
O Commissioner Date D Exec. Dir./Oper.
O con. Counsei Cong. Liaison O soiicitor O Public Affairs O secretary inspector & Auditor O posiev Ev.iu.t4on inco,n;ng:
Dr. R. T. Lahey, Jr, Chairman From:
Rensselaer Polytechnic Institute To:
Ahearne care 3/13/80 suweet:
rea meetino with NRC staff on the oost-TMI increased trainino needs of utility executives & ODer trainina Xb Prepare reply for signature of:
M Chairman Data 1: Cer:
April 2 O Commi ioner E DO. GC, CL, SQ L, P A, S ECY, I A. PE Signature block omitted Return onginal of incoming with response O ror direct repiv-O ror appropriate action For information Rec'd 0ff. EI)9 m....pg:.h,..%
o.t..... !
.. u.
eema.,
For the Commission:
6
' Send three (3) copies of reply to Sacy Correspondence and Records Branch j
Nnc42 ACTION SLIP l
l l
1 i
,