ML19312E501

From kanterella
Jump to navigation Jump to search
Forwards LERs 80-029/03L-0 & 80-030/03L-0
Date released: 11/22/2019 Download: ML19312E501


LER 80-030/03L-0:on 800501,radiation Monitor R25A (Fuel Storage Pool Area) Declared Inoperable Due to Power Loss. Caused by Blown Fuse.Connecting & Disconnecting Test Equipment Cause for Blown Fuse.Fuse Replaced
ML19312E509
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/28/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19312E509 (1)
LER 80-029/03L-0:on 800430,intermediate Range Nis Channel N-35 Declared Inoperable Due to Loss of Power.Caused by Loose Terminal Screw on 120-volt Vital Ac Panel 1A Molded Case Breaker.Wire Reconnected
ML19312E504
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/28/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19312E504 (1)
Forwards LERs 80-029/03L-0 & 80-030/03L-0
ML19312E500
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/28/1980
From: Clayton F
ALABAMA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19312E500 (1)