Requests 791214 Rfpa Re Piping Inelastic Fracture Mechanics Analysis Be Cancelled Due to Capability of Completing Scope of Work within Existing Contract
ML19312E482
Person / Time
Issue date: 04/02/1980
From: Mattson R
Office of Nuclear Reactor Regulation
To: Dougherty D
NRC OFFICE OF ADMINISTRATION (ADM)
References
CON-NRC-03-79-116, CON-NRC-3-79-116 NUDOCS 8006040512
Download: ML19312E482 (1)


Text

-

C APR 2 1380 MEMORANDUM FOR:

Dennis J. Dougherty, Chief Technical Assistance Contracts Branch Division of Contracts FROM:

Roger J. Mattson, Director Division of Systems Safety

SUBJECT:

AUGMENTED WORK SCOPE FOR " PIPING INELASTIC FRACTURE HECHANICS ANALYSIS " NRL CONTRACT NRC-03-79-116 On December 4,1979 we requested that an additional task be added to NRL contract NRC-03-79-116. " Piping Inelastic Fracture Mechanics Analysis," and authorized an additional $7000.00 to complete this task.

In a February 27, 1980 letter E. E. Henfin to W. B. Menczer, NRL infonned the Division of Contracts that the additional task can be completed within the scope of work of the existing contract and that the contract modification is not needed. Accordingly, l

we request that the RFPA in our December 14,1979 memcrandum be cancelled.

Thank you for your assistance and attention in this matter.

Original signed bi Eernard L Greni r

/&/ Roger 5. Mattson, Director 3

Division of Systems Safety Office of Nuclear Reactor Regulation cc:

T. Sullivan W. B. Menczer B. Grenler Distrfbu((Jg.lett Central File NRR Reading File MTEB Reading File CN 14 R. J. Mattson F. Schroeder J. P. Knight S. S. Pawlicki R. M. Gamble

(

605000 0

Mt %4 o

OFFICE h SURNAMEk.. E a d ie M-Icki...J (n ght...

F eder.

.R

.0 0.

oATE >.3/21/B0

.. 3 p f'/60... 3[f-/.80,,,

,p, / /80,,,,,. g/,//,80,,,,,

,,,,,,,,,,,,,,,