O UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

SACRAMENTO MUNICIPAL UTILITY

)

Docket No. 50-312 (SP)

DISTRICT

)

)

(Rancho Seco Nuclear Generating

)

Station)

NRC STAFF'S PROPOSED TRANSCRIPT CORRECTIONS Date Page Line Change 2/28/80 377 25 Delete "or more".

378 8

Delete "first".

378 20

" code" to " cold".

394 2

" densely" to " density".

398 25 "online" to "offline".

401 17 Should read "in order not to repeat the" 401 25

" instrumental" to " instrumentation".

403 3

" selected" to " elected".

406 1

" innovated" to " integrated" 412 15

" accident" to " action".

415 9

" receded" to " reseated".

416 4

" cool count" to "cooldown".

416 7

" recede it" to " reseat".

416 9

"aeroban" to " error band".

8006030l%

. T Date Page Line Change 424 19 "celanoid" to " solenoid".

425 19 "words" to " water".

428 18, 20 "some" to " sump".

428 22

" pull" to " full".

430 9

Add before beginning of sentence "The Witness:"

461 9

Add "the Energy Commission" between " keep" and "as".

3/3/80 480 22 "B&W" to "PWR" 495 17 Insert "fo. you" between "now" and "to".

499 16 Add " bleed" at end of line.

500 4

Add " safety" between "a" and " system".

504 23, 24

" insidious" to 507 2,4,7

" pore" to "PORV".

512 25

" brick" to " break".

516 13

" fleeting" to " leading".

516 23 "penilized" to " analyzed".

522 7

"Mr. Black" to "Dr. Cole".

526 3

Add "AFW valves" between " closed" and " problems".

527 19 Add " borated" between "the" and " water".

528 22 Add "not" between "is" and "an".

532 8

"wouldn't" to "would".

3/3/80 564 14

" tax" to " tank" b65 21 "run" to " rod"

. Date Page Line Change 607 23 "23,55" to "2355" 614 12-13 Should be revised by licensee.

615 12 Insert:

"on how many" between " depending" and "more" 615 15 "than" to "then" 615 20 "than" to "then" 616 13

" pressure" to " temperature" (change at first

" pressure")

616 23

" sort" to " store" 617 2

Should be revised by licensee.

617 11-12 Should be revised by Licensee.

617 14

" fuel" to " flow" 620 5

" drawer" to " throttle" 624 4

" lead" to " leave"; delete "into" 1

636 8

" Cony" to "0conee" i

650 12 "where" to "were" 650 14

" meaningful and" to " meaningful?" And" 650 15

" document functional" to " document.

" Functional" 650 16

" refused to review" to "were used to reduce" 650 17

" allowed" to " allow" 650 18 Insert:

" after sentence.

3/4/80 660 6

" Bottle Font" to "Bellefonte" 667 24 Should read:

" conversations were conducted in the presence of other persons."

4

Date Page Line Change 3/4/80 679 1

Delete line 1 679 11 "or" to "for an" 680 18

" advance" to " abeyance" 682 19 Add:

"were considered" after " cabinets" 686 19

" Board" to " Order" 705 6-12 Delete lines 6-12 709 Change page "709" to "710" 710 Change page "710" to "709" 713 17

" offering a cotributor" to "often a contributor"

/16 3

" pause" to "cause" 735 1

" noting" to "noding" 744 12

" office" to " orifice" 746 8

" core" to "PORV" 751 2

delete:

"that the" 760 2

"and turning" to "from" 766 1

"snyc" to "si.k" 768 4

" sync" to " sink" 772 12

" interrupt" to " interpret" 780 14 Insert:

"not" between "would" and " empty" 793 14

" reaction" to " fraction" 794 2

" reaction" to " fraction" 806 15

" pumping" to " bumping" 806 21

" core" to "PORV"

Date Page Line Change 813 6

"two" to " voids" 827 1

"matira" to " natural" 3/5/80 835 6

"ICS 95%" to "ICS. The 95%"

836 23 Delete:

"rather" 842 8

" hear" to " head:

847 17

" tube" to "two" 855 12 "Mr. Lewis" to "Mr. Baxter" 858 4

"in your cooling" to "to cool your" 862 17

" trip to pumps" to " trip the pumps" 869 13

" force close" to " forced" 870 19 Delete:

"not" 871 4

"in the" to "than" 1

i 873 10 "reflighting" to "reflooding" 883 15 Sentence should be proceeded by a "Q."

884 15 Insert "I" between "Do" and " understand" 885 10, 15, 18 "INE'.' to I&E" 885 11 "it is" to "the" 887 4

"Dr. Estasi" to "Dr. Rosztoczy" 887 15 "Mr. Lewis" to "Mr. Baxter" 888 12 "INE" to "I&E" 888 18 "INE both in" to "I&E Bulletin" 966 9

" gate" to " tank"

~

\\

971 20

" load" to " mode" l

. Date Page Line Change 975 23

" assumption" to " question" 980 25

" commercial" to " combustion" 9u 1

" engineering of" to " Engineering and" 994 19 Should read:

" Operating plant data has shown that 40" 995 3

" injection" to " intention" 996 7

"models" to " nozzles" 3/6/80 1017 6

"areoband" to " error band" 1025 16 "101" to "10" 1059 13 Should read:

" statement: To" 1103 13 "concerning a" to "considering the" 1107 2

"couldn't" to "could" 1109 9

Delete:

"is required" 1115 25

" circ" to " zirconium" 1130 21

" event" to " vents" 1135 4

" flat" to " flap" 1135 18, 22 "aeroband: to " error band" 1136 1, 2 "aeroband" to " error band" 1145 21

" cost" to " course" 1165 2

"I am" to "The panel is" 1167 4

"textback" to " Tech Spec" 1173 13 "no" to "not" 1179 6

" incurred and" to " encouraged" 1179 16 "intermeate 'at" to " intermediate"

. Date Page Line Change 1181 3

Add:

"but it has been accorded a relatively low priority."

1182 18 "ethicacy" to " efficacy '

1183 9

"Mr. Gammel" to "Mr. Gammill" 1187 6

" instant" to " incident" 1188 13

" falling" to "following an" 1188 15

" avoiding" to " voiding and" 1190 3

"823" to "8/23/79" 1191 21

" plants" to " plans" 1192 7

"5054 F" to "10 CFR 50.54(f)"

1195 13 Delete "no" 1195 14 Should read:

"which contribute to unacceptable levels of" 1201 5

Should read: "whether it was Westinghouse or Combustion Engineering" 1201 18

" instrumentations" to " implications" 1202 13

" text back" to " Tech Spec" 1206 8

" condensate" to "ccmpensate" i

April 8, 1980 Page Line Correction 1212 25 After " CEC's Exhibit" add "No. 4."

1212 25 Under "In Evidence" enter "1352."

1214 6

Change " question he" to " questioning."

1224 11 Change "fiay 17" to "May 7."

1224 18 Change "Madimo" to "Mattimoe" (and repeated elsewhere).

1228 15 Change "with" to "of."

1229 1

Change "overpooling and underpooling" to " overcooling and undercooling."

1229 13 Should read "Yes, I am."

1230 2

Change "Shan" to "Shon" (and repeated elsewhere).

1230 6

Should read "Mr. Lewis."

1232 2

Change " extinct" to "in existence."

1233 11 Add "as" between " status" and "far."

1233 19-20 This should be one paragraph and the end of the sentence should read " record, I would do that."

1235 5

Change "before" to "for."

1235 6

Change " parties" to " witnesses."

1236 19 Change " authorizing" to " authoring."

1237 4

Change "in sight" to " cite."

1237 20 Change "BMU" to "B&W" (and repeated elsewhere).

1238 6

Change " Preservations" to " Perturbations."

1238 7

Change " CEC product" to "the CEC Exhibit."

1240 2

Change " reg" to " rank "

1240 4

Change " impose" to " posed."

l

. April 8, 1980 (cont'd.)

Page Line Correction 1242 9

Change "( ertivations)" to " perturbations" (and repeated elsewhere.

1242 18 Add "and" at end of line.

1243 10 Change "actionaries" to "iction areas."

1243 11 The line should read: " auxiliary feedwater, instrumentation and control, design and operational matters,".

1243 21-22 Change "(problemistic)" to "probabilistic."

1245 4

Change "by an engineering and" to "be an engineered."

1245 11 Add "to" between " selections" and " preclude."

1245 14 Delete the period after " condition" and change "The" to "the."

1246 1-Change "perscriptive" to " prescriptive" (and repeated el sewhere).

1246 4-5 Change "de-flow" to " feed-flow."

1246 12 Change "de-water trainings" to "feedwater transients."

1246 24 Change " brake" to " break" (and repeated elsewhere).

1247 2

Change "(Decony units)" to "0conee units."

1248 12 Change "taks work" to " task force."

1249 19 Change "Shan" to " Lewis."

1249 25 Change " Cony" to "0conee."

1250 1

Change "non... power" to "non-nuclear instrumentation power."

1250 12 Change "on" to "from."

1250 20 Change "(boat)" to " cold" and " pour" to " core."

(Latter c

repeated elsewhere).

1251 6

Add " reactor" between "the" and " building."

l

. April 8,1980 (cont'd.)

Pace Line Correction 1253 10 Change "inpour" to "incore" (and repeated elsewhere).

1253 20 Change " pressurized" to " pressurizer."

1255 23 Change 'Tas fast actuation)" to "SFAS actuation."

1257 15 Change " consumer" to " Consumers."

1258 14 Change " plan" to " plant."

1258 18 Change " recede" to " reseat" (twice).

1261 2

Delete " don't."

1261 -

14 Change "detransfer" to " heat transfer."

1263 3

Change "Xes" to "X's" (and repeated elsewhere).

1263 12 Change "(host)" to " post."

1265 10 Change "Those TMI's would" to "Since TMI there."

1265 25 Change "where" to "were."

1268 10 After "is" put a period and add "It does not seem."

1271 11 Change "e ission" to " admission."

m 1271 19 Change " emitted" to " admitted."

1276 25 Change " plant requisite" to " prerequisite."

1281 6

Change " nuclear" to " nucleate."

1281 7

Strike " maximum reactor cooling system pressure."

1285 11 Change " overflow" to " overfill."

1291 8

Change " uncovers" to " covers."

1299 13 Change "or" to "are."

1301 23 Change " trip. The" to " trip, the."

1302 5

Change "naurcl" to " natural."

1303 21 Change "in" to "from."

. April 8,1980 (cont'd.)

Page Line Correction 1304 14 Change " safe" to " sake."

1305 3

Change "noe" to "one."

1308 17 Change "not" to "or."

1309 14 Change "seems" to "seemed."

1310 2

Change " future" to "past."

1311 20 Change " side" to " set."

1314 4

Change " speed" to " feed."

1323 11 Add "of" between " problem" and "over."

4 1323 19 Insert " coolant" between " reactor" and " shrink."

1324 5

Change " light" to " liquid" and "to do" to "due to."

1328 2

Change "U-band" to "U-bend" (and repeated elsewhere).

1329 7

Change "the K" to " decay" (and repeated elsewhere).

1329 15 Change "had" to "in order to have".

1330 5

Change "in that" to " inlet" (and repeated elsewhere).

1333 17 Change "What" to "Where."

1335 1-2 Should read " bring down the pressure in the main."

1338 6

Change " stirring" to " storing."

1338 18 Add "Mr. Norian."

1339 1

Add "would" before "be."

1341 21 Change " field" to " feeling."

1344 11 Change "need" to " meet."

1345 5

Change "P" to " peak."

1345 11-12 Change " grade" to " break" (3 times).

1346 25 Change " craft" to "Karrasch."

I

. 4 i.

April 8,1980 (cord 'd.)

i Page Line Correction 1347 1

Change "as" to "was."

1351 9

Add " relate" between " raising" and "really."

1357 16 Change " conclude" to " preclude."

1357 17 Change " poor" to " forced" (and repeated elsewhere).

1358 16 Change "non-contentionals" to "non-condensibles."

1359 21 Should read "look first at what your availability of heat sink is, what your."

1360 11 Change " boards" to " voids" and "non-connectable" to "non-condensibles."

1361 10 Change "7905-C" to "79-05(c)" (and repeated elsewhere).

1364 16 Change " core" to "PORV."

1365 4

Change " bend" to " vent."

1366 14 Change " walk speed" to " aux feed."

1367 2

Change "(peak-clating)" to " peak cladding."

1367 4

Change "(peak-clate)" to " peak clad."

1369 13 Change " Rancho Seco is" to " Rancho Seco, as."

1373 22 Change "Ellison" to "Shon."

m

- April 9,1980 Page_

Line Correction 1382 14 Change " omission" to " admission."

1387 8

Change "S-fast" to "SFAS" (and repeated elsewhere).

1387 12 Change "can't" to "can."

1388 22 Cnange "kitner" to "either."

1389 8

Delete the comma between " inhibit" and "providing."

1391 19 Change " reels" to " wheels" (and repeated elsewhere).

1392 15 Add "to withstand" between " designed" and "a."

1393 9

Change "U-2" to "U-tube."

1394 14 Change "a" to "at."

1394 15 Change "went" to "due."

1396 12 Delete the comma and change " primers" to " parameters."

1397 7

Change "and start" to "on the start-up."

1397 13 Change "59" to "to."

1399 13 Change " expected" to " suspected."

1400 7

Change " tooling" to " cooling."

1401 7

Change "in that" to " inlet."

1402

~10 Change " conclusion" to " confusion."

1402 23 Change " flows" to " closed."

1404 4-8 Should read:

" Low level limits with the reactor coolant pumps operating... (that's the 30 inches I was speaking of previously) and the emergency level without the reactor coolant pumps operating."

1415 17 Change "(Berkhaven)" to "Brookhaven" (and repeated else-where.

1416 3

Change " coding" to "noding."

. April 9, 1980 (cont'd.)

Page

_Line Correction 1416 13 Change "(noting)" to "noding" (and repeated elsewhere).

1417 19 Change " flows" to " closed."

1433 4

Insert " secondary".between "the" and " side."

1433 18 Change " dragonhead" to " driving head."

1439 13 Insert " auxiliary" between "the" and "feedwater."

1442 14 Change " state" to " stayed."

1447 1

Change "date" to " data."

1447 4

Change " floor" to " flow."

1448 11 Change "pathically" to " passively."

1450 16 Change " dowser" to "and valves."

1450 17 Should read:

"t; verify that they will perform their function".

1459 9

Change " comport to" to " approached the.'.'

1460 25 Change "over" to "further."

1468 7

Change "Does" to "Through."

1468 18 Change " railed" to " failed."

l' '

19 Change " subs" to " sumps."

1468 20 Add " sumps" after " containment."

1469 10 Change "(croom)" to " cooling;';

1470 7

Change " bed" to " vent."

1471 9

Change " base" to " phase."

1476 19 Delete the period after " containment" and add " isolation."

1477 5

Change "down" to " valve."

1477 23 Change " log" to " rod."

4

. April 9,1980 (cont'd.)

Page Line Correction 1481 11 Insert " aux feed" after getting."

1481 19 Change "other" to " auxiliary."

1488-16 Change " system" to " sink."

1491 8

Change "(conasage)" to " condensate" (and repeated elsewhere).

1500 20 Change "PNID" to "P&ID."

1506 7

Change "I&A" to "I&E."

1512 12 Insert "SFAS" after "or."

1512 22 Change "what" to "whether."

1513 1

Change "S-pass" to "SFAS" (and repeated elsewhere).

1521 10 Change " low" to " control."

1524 18 Change "three fueling" to " refueling."

1534 11 Change " speed" to " feed" (and repeated elsewhere).

1534 23 Change " half-reels" to " hand wheels" (and repeated elsewhere).

1542 19 Change " poet" to " approach."

1543 2

Insert "for" after "say."

1548 23 Change " protective" to " effective."

1551 11 Change " flied" to " flagged."

1554 10 Change "stop" to " start."

1555 7

Change "AFWS" to "SFAS."

1559 9-10 Change "in design and depth" to "its design intent."

1560 19 Change "faultry" to " fault tree" (twice, and repeated elsewhere).

1561 11 Change " pop" to " top."

1561 15 Change " signal" to " single" (and repeated elsewhere).

4 April 9, 1980 (cont'd.)

i Page Line Correction 1561 20 Change "whatever" to "What are."

1561 23 Change "AFFE" to "AFW."

1565 11 Change " rules" to "world."

1565 13 Change " figure" to " failure."

4 l

i s

e 4

4 l

4 l

4 l

. April 10,1980 Page Line Correction 1570 8

Change " opt-normal" to "off-normal."

1571 10 Change " incorporate and" to " incorporating."

1573 7

Change "faltry of entry" to " fault tree or event tree."

1573 22 Insert "if" after "yet" and add a comma after " base."

1574 4

Insert "to" after " plants."

1582 17 Change "of substance" to " assessment."

1593 18 & 23 Change " Thatcher" to "Matthews."

1594 19 Change " Cole" to "Matthews."

1597 21 Change "Lanpher" to " Lewis."

1599 20 Change " Blow" to " Flow."

1605 15 Change " post dated" to "previously stated."

1610 2

Delete "Mr. Shon" and add sentence to the end of the answer which presently ends on line 1.

1612 6

Change "Baxter" to "Lanpher."

1612 13 Change "Lanpher" to "Baxter."

1620 7

Change "ECS" to "ECCS."

1628 16 Insert "at the end" following " increase."

1630 21 Insert " Branch" after "it."

1630 22 Change "10/l" to "10-1."

1631 14 Change "they" to "there" and insert "only" after "are."

1631 22 Change "Avant-3 and Fault-3" to " event tree and fault tree."

i l

1634 23 Insert "there is" after "that."

l 1642 2

Change " reactor" to "PORV."

. April 10,1980 (cont'd.)

Page Line Correction 1642 14 Change " expended" to " extended."

1646 11 Change "BIEEE" to "IEEE."

1649 3&5 Change " mode of" to " motive."

1649 14 Delete "Q" and "its."

1649 15 Delete "but."

1649 16 Change " bail" to " fail."

1650 20 Change "after" to " reactor."

1661 21 Change " dry" to " drive."

1669 21 Change " older" to " colder" (and repeated elsewhere).

1680 1C Change " atlas" to "ATWS" (and repeated elsewhere).

1682 9

Change "either" to "neither."

1685 12 Change "out" to " water."

1688 22 Change " thoughts" to " thrust."

1688 25 Insert "of" af ter " sizing."

1689 4

Change "414" to "4-14."

1689 10-11 Put quotation marks around " total" and before " trips" and after " Post-TMI".

1689 17 Change " rods" to " rise."

1689 19 Should read:

" reactor trip at 100 pounds above the PORV'.'.

1690 13 Add " relative" after " low."

1691 2

Change " disposed" to " dispersed."

1691 13 Change " rad way" to "radwaste" (and repeated elsewhere).

1691 18 Insert "or" after " relief."

1691 22 Change "except" to " accept."

, t April 10,1980 (cont'd.)

Page Line Correction 1692 1

Change " bet" to " expect."

1692 3

Insert "was not" after " discharge."

1692 12 Change " spring-like" to " spring-type."

1694 5

Change "Of" to "If" and "and" to "in."

1699 15 Insert " proposal" after "their."

1704 20 Change " unloading" to " loading."

1705 12 Change " physicians" to " positions."

1718 14 Change " bounce" to " balance."

1730 21 Change " tentativeness" to "attentativeness."

1734 23 Insert "not" after "was."

1736 3

Change "necessitant" to " reassessment."

1741 21 Change " double-lined" to " double-ended."

1743 10 Change "Norian" to "Shon."

1743 12 Change "Shon" to "Norian."

1745 21 Change " forwarding" to " forty."

1748 4 & 10 Change "arvis" to " orifice."

1749 4

Change "Novak" to "Matthews."

1749 7

Change "outside and outside" to "onsite and offsite."

1749 8

Change "the working" to "looking."

1749 11 Change first "to" to "or."

1749

.14 Change "baldaderities" to " vulnerabilities" (and repeated elsewhere).

1749 21 Change " dials" to " valves."

1750 17 Change "Novak" to "Matthews."

1761 20 Change "Matthews" to "Capra."

1762 5

Change first "to" to "of."

April 10,1980 (cont'd.)

Page Line Correction i

1762 12 Change "in" to "and" and " force" to " forces."

f 1763 11 Change second "to" to "of the."

1764 3

Change "Matthews" to "Capra."

1768 4

Change "Novak" to "Baxter."

1776 5

Change " temperature" to " intent."

1778 1

Change " soft" to " solid."

1778 2

Insert " don't" after "I."

1778 3

Change "but" to "for."

1778 22-23 Should read: " cooling and the action is necessary to keep pressurizer level from going off scale high".

1790 21 Change " weak" to " legal."

(renumbered from 1788) 1792 8

Change " Action" to "Section."

(renumbered from 1786) l 7

April. ll,1980 Page Line Correction 1908 9

Delete "Q".

1908 17 Add "Q" at beginning.

1908 18 Add " concerned" after "become."

1921 5

Add "and" after "feedwater."

1926 12 Change "mainly" to "namely."

1933 17-18 Should read: "And have you looked at data for other PWRs for ESFAS actuations".

1938 11 Change " methods" to "are present."

1943 6

Change "is" to "if."

1947 19 Change " cold" to " coal."

1982 15 Change " turned" to " churned."

4 Date Page Line Change 4/14/70 2103 16-17 "an exes" to "a nexus" 2162 3

Delete "2193", change "2300" to "2171" 4/15/80 2169 19

" file" to " filed" l

20 "are" to "an" 21 Delete "are" 2170 6

Should read "I don't view it" 2205-2206 These pages are reversed and misnumbered 2300 9

Delete "feedwater is --- the" 2301 7, 21, 23 "tantum" to "tandum" 2302 2

" raided" to " rated" 6

Should read "that you stated that that motor" 2303 3

' rid" to " grid" 6

" load it" to " loaded" 22 Delete " local" 2304 9

" fairly" to " fair" 2305 14

" type" to " tightness" 2306 10

" valid" to " valve" 13 Strike second "DC" I

14 Strike " trip" 2309 4

" loss" to " lost" 23 Strike "be a" 2312 18

" water ban" to " boiler can" 2313 8

"not" to "was" 23

-Should read "by gravity feed"

i 1 l Date Pace Line Chance 2314 25 Add " typical" at end of line 2316 25 Should read " injection hoses" 2320 4

"What" to "want" 2321 24

" reached" to " breached" (and repeated elsewhere) 2332 13 "Mr. Lewis" to "The Witness" 2375 17 Delete "20, on Exhibit 22"?

2389 18 "is" to "was" 2391 25 Strike entire line (because it's repeated on next page) 1 2398 22-23 Strike "(in home)"

4/17/80 TABLE OF CONTENTS PAGE Under Thomas A. Greene add under

" Direct" "2782" and Under " Cross" add "2786" Add Thomas F. Meyer to the list of l

witnesses and place under " Direct" "2782" and under " Cross" "2786" Under " inserts" add the following note to " Thomas A. Green's Test. -

2783A", "NRC Staff Testimony of Thomas A. Greene on Hydrogen Recombiner was admitted at Tr. 2785, but appears following Tr. 2783."

2683 9

" citing" to " siting" (repeated elsehwere) 24 "and" to "in" 2785 10

" sided" to " sited" 16

" burnt" to " berm" 2688 5

" ruptured" to " rupture" 2690 10 Should read "page 4, the table in" 17 "BBA" to "DBA" 2741 20 "or" to "of" l

Date Page Line Change 2742 21 "some" to " sump" 21 "Radwast" to "Radwaste tanks" 21 "0x" to " Aux" 2743 24 "the" to "de "

2744 2

" camp" to " tank" 3

" bleep" to " bleed" (and repeated elsewhere) 4

" airborne" to " boron" 13 Change " valve and" to " valve in" 14

" rupture" to " ruptures" 2750 1

Change "2L4" to "2 out of 4".

2753 19 "could find in" to " defined" 2754 9

" Waste" to " rates" 2760 25 "INE" to "I & E" (and repeated elsewhere) 2761 18

" actual ones" to " Action Plans" 2762 25

" organization" should " recommendations" 2763 1

" terms of assigned" to " plant design" 17 "have change of system" to "have to change the systems" 2764 6

"begin" to " depend" 23 "radway" to "radwaste" 2765 21 Change " container" to " containment" 22 Change " piling" to " primary" 23 Change " integrates" to " generates" 24

't Change "to the classification lodging" to "the isolation logic" 25 Change " lodging and a gauge" to

" logic and engage"

Date Page Line Change 2766 1

Change " operator valve" to " motor-operated valves".

2768 11

" letter D. from Nethermore to Reed" should read "the letter from Mattimoe to Reid" 19 Change "in A-5" to "on page 5".

2769 4

Should read "2.1.4 and 2.1.6(a)"

19 "They are scheduled" should read "There are schedules" 2773 5

" vent back" sheuld read " letdown" 20 Change "S-valve" to "SFAS".

2775 15 The word " correct" ends Mr. Lewis' statement.

The remainder of that paragraph should be attributed to Mr. Lanpher.

2778 4

' Change " boarding parties" to

" Board and parties".

2781 Change " Lewis" to "Diaz".

2784 5

"50.40(G)" to "50.44(g)"

7 and 8 "rabs" to " rads" 2788 6

Change "ECS" to "RBECS".

2789 8

after " hot" add " leg" 10 Change " based" to " basis".

18 Change "as" to "with" 19 after " analysis" add " assuming" 24 Change " container" to " containment" (and repeated elsewhere) 2790 7-8 Should read " determine the leak rate, not directly, but when the pressure is over one-half the maximum calculated, they assume the design leakage."

19 Change to read: " Point one percent, a tenth of a percent."

Date Page Line Change 2791 24 Change ' loci" to LOCA" (and repeated elsewhere) 2972 6

Change to read:

" containment valve open at the start of the LOCA" 13-14 Sentence should read:

"The containment is pressurized to higher than atmospheric but less than their own design."

2793 9

Change " Quarters" to " Orders" 20 Change "conmodity" to " combined"

1 Date Page Line Change 5/6/80 2800 25

" flow" to " fuel" j

2811 4

"u-point" to " yield-point" 2841 16

" Persian" to "Hursh and" 2848 10 "of" to "or" 2853 6

"to" to "the" 2858 1

"then" to "not" 2

" relay" to " rely" 2959 21 "defidicent" to "the fission" 2864 6

"62" to "6.2" 2875 19

" low" to " blow" 2884 1

Delate "A" at beginning of sentence 1

"pmi" to "TMI" 4

"you" to "we" 2885 10

" clouding" to " cladding" 2937 8

" release" to " relief" 2945 18

" load" to " mode" i

5/7/80 31C0 21

" area" to " error" 3162 13

" indicated" to " vindicated" 5/8/70 3194 13 "has" to "doesn't have" 3198 3

" offset" to " upset" 3199 13

" paths" to " Staff" 3202 4

" designer operated" to " design or operator" 3203 24 Insert "A." before "There..."

Date Page Line Change 3205 15

" rad way" to "radwaste" 3206 18

" rad way's" to "radwaste" 3208 8

Insert " met" before "A" 3259 14 "high" to "hard" 5/9/80 3377 22

" facility" to " industry" 3379 25 Insert "no" between "there's" and " written" 3389 8

" conditions" to " positions" 5/10/80 3627 24 "Tasco" to " Castro" 1

3634 15 "Mr. Parish" to "Mr. Karrasch" 3652 1

"vice" to "versus" 3670 11 "GE" to "CE" 5/12/80 3688 15

" core" to " base" 3706 6

Should read:

"could be an effect at less" 3709 21 "Mr. Lewis" to "Mr. Ellison" 3713 19 "Mr. Lewis" to "Mr. Ellison" 3723 14 "vice" to "versus" 3732 6

"superhear" to "superheat" 3746 7

" heats incapacity" to " heat sink capacity" 3747 9

" feed sync" to " heat sink" 3754 8

" pound" to " plant" j

Date Page Line Change 3757 7

"so" to "say" 3758 6

"subjoints" to " set points" 25 Should read:

"That didn't answer your question?"

3762 2

Should read:

" initiate upon a loss" 3767 12 "Either" to "Neither" 3781 22

" pre-trial" to " pre-filed" 3802 19 Should read:

"see to ensure proper" 5/13/80 3941 8

"says" to " days" 3962 6

"AEC" to "NRC" 3963 9

" agrees" to " disagrees" 4019 21

" Witness Johnsen" to " Witness Canter" 4031 2

"AEC" to "NRC" 4043 15 "214" to "240" 4

4048 7

Delete "0/6/25" 4077 6

"all mean" to "it mean" 4124 18

" sum" to " sump" 5/14/80 4224 18 "resert" to "recirc" 4246 17

" Proponents" to " Performance"

_