ML19312D992

From kanterella
Jump to navigation Jump to search
Forwards Three Repts of Test of Cable Penetration Fire Stops for Pilgrim 1 Nuclear Power Generating Station, Prepared by Franklin Research Ctr
Date released: 11/22/2019 Download: ML19312D992


Test of Cable Penetration Fire Stops for Pilgrim 1 Nuclear Power Generating Station, Final Rept for 790907 Testing
ML19312E001
Person / Time
Site: Pilgrim
Issue date: 04/30/1980
From:
FRANKLIN INSTITUTE
To:
References
Download: ML19312E001 (80)
Test of Cable Penetration Fire Stops for Pilgrim 1 Nuclear Generating Station, Final Rept for 790829 Testing
ML19312D997
Person / Time
Site: Pilgrim
Issue date: 03/31/1980
From:
FRANKLIN INSTITUTE
To:
References
Download: ML19312D997 (80)
Test of Cable Penetration Fire Stops for Pilgrim 1 Nuclear Power Generating Station, for 790531 Testing
ML19312D995
Person / Time
Site: Pilgrim
Issue date: 01/31/1980
From:
FRANKLIN INSTITUTE
To:
References
Download: ML19312D995 (80)
Forwards Three Repts of Test of Cable Penetration Fire Stops for Pilgrim 1 Nuclear Power Generating Station, Prepared by Franklin Research Ctr
ML19312D991
Person / Time
Site: Pilgrim
Issue date: 05/29/1980
From: Andognini G
BOSTON EDISON CO.
To:
Office of Nuclear Reactor Regulation
References
Download: ML19312D991 (1)