ML19312D853
| ML19312D853 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 05/01/1980 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | Rubenstein L Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8005050242 | |
| Download: ML19312D853 (1) | |
Text
.
8005050 2g2 400 Chestnut Street Tower Il May 1, 1980 Director of Nuclear Reactor Regulation Attention:
Mr. L. S. Rubenstein, Acting Chief Light Water Reactors Branch No. 4 Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Rubenstein:
In the Matter of the Application of
)
Dccket Nos. 50-327 Tennessee Valley Authority
)
50-328 The seismic analysis of the Waste Packaging Area (WPA) and the Condensate Demineralizer Waste Evaporator Building (CDWEB) for the Sequoyah Nuclear Plant (SNP) has been completed in accordance with commitments documented in the Safety Evaluation.'._ port for SNP units 1 and 2, Supplement No. 1, Section 2.6.3.
A copy of these draft Final Safety Analysis Report (FSAR) revisions was submitted informally to C. Stahle today, and this material will be transmitted formally on May 6, 1980. Amendment 65 will incorporate the material into the SNP FSAR.
If you have any questions, please get in touch with D. L. Lambert at FTS 854-2581.
Very truly yours, TENNESSEE VALLEY AUTHORITY lII l I ?,w <, L ',
.,, d7 L. M. Mills, Manager Nuclcar Regulation and Safety l
i hOY 36 ll0 i
-