ML19312D809

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-13, Cracking in Feedwater Sys Piping. Required Insps Will Be Conducted After Hot Functional Testing,But Prior to Fuel Loading
ML19312D809
Person / Time
Site: Farley 
Issue date: 04/14/1980
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-13, NUDOCS 8005050159
Download: ML19312D809 (1)


Text

Airbima Pow:r Company 600 North 18th Street Post Offica Box 2641 "p ' p' f Tsliphoni 205 323-5341 50 /59

Birmingh:m. Alib:ms 35291 80050

. n.

F. L. CLAYTON, JR.

Senior Vice President Alabama Power Ite soutten +M:tnc system

' / i^ 17 Pl: : I3 April 14, 1980 Docket No. 50-364 Mr. J. P. O'Rielly U. S. Nuclear Regulatory Commission Region II Suite 3100 101 Marietta Street, N. W.

Atlanta, CA 30303 Re: IE Bulletin 79 Cracking in Feedwater System Piping Gentlemen:

Alabama Power Company submits the following information in response to your letter concerning this subject on Joseph M. Farley Nuclear Plant, Unit 2, dated March 20, 1980.

Inspections required by IE Bulletin 79-13, Items 1 and 2 will be conducted on Unit 2 af ter hot functional testing, but prior to fuel loading.

The Farley Unit 1 operating procedures on Condensate and Feedwater Systems and Auxiliary Feedwater System were reviewed and found adequate. Unit 2 procedures are similar to Unit 1.

If you have any questions, please advise.

Yours very truly,

f. Claytonj; Jr.

Ub F.

FLCJr/TNE:aw cc:

Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. M. D. Hunt R

f h

p

  • t

(

.. - _ -..,.. ~ _ _ _ _ _ _

"mCTAL q l

-., -