%sm EDISON Docket No. 50-346
$[,"$ " #
uw License No. NPF-3 14i3 239 3233 Serial No. 599 March 17,1980 Director of Nuclear Reactor Regulation Attn:
Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washingcon, D. C.
20555
Dear Mr. Reid:
- On March 4,,1980 representatives from your organization, Florida Power Corpora-tion, Babcock & Wilcox (B&W) and all operating licensees owning B&W nuclear
. steam supply systems met in your offices to uiscuss the February 26, 1980 transient
~
at Crystal River Unit No. 3.
Toledo Edison's letter of March 12,1980 (Serial No. 596) responded to all except one of your staff's requests documented in your letter of March 6, 1980. This letter provides the remaining response to your request for Davis-Besse Nuclear Power Station Unit No. 1.
The item numoer identified in the attachment is consistent with Enclosure 3 of your letter and the attachment to Toledo Edison's March 12, 1980 letter. We are available to discuss any questions you may have on this response.
Very truly yours, ff
=1_
. RPC:TJM Attachment h
k THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OH;O 43652 8 0 00n 40 3 SS
SUBMITTAL' FOR THE DAVIS-BESSE NUCLEAR POWER STATION UNIT'l FACILITY OPERATING LICENSE NPF-3 IN RESPONSE TO A 10 CFR 5C.54 (f)
REQUEST DATED MARCH 6,1980 CONCERNING CRYSTAL RIVER UNIT NO. 3 TRANSIE.Vr OF FEBRUARY 26, 1980 This response is filed in accordance with 10 CFR 50.54(f).
This letter provides information about the relationship of the Crystal River Unit No. 3 transient of February 26, 1980 to the Davis-Besse Nuclear Power Station, Unit 1.
By 7
Vice President, Nuclear Sworn to and subscribed before me the seventeenth day of March, 1980.
e*chY
/" /
Notary Public LINDA L. CCSTELL Notary PutEc -!! ate of CNo My Commiss,on gxp.,e3 p,3, g, gggy
(;,
^
=
C' V
r ~ q ;;;
- d,
~
' Docket. No.? 50-346
~ License ~No. NPF -i Serial No.= ' 599.
March 17,1980 :
' Response to-NRC 10 CFR 50.54(f)
Request Concerning Crystal: River.-l Unit No. 3 Transient of February 26, 1980, Question 6,-Item' iia p
E f Question ' 6
~ Address 'each Crystal River proposed fix - applicable to your plant - and their proposed action.
-Response The.following corrective actions have been proposed.by Crystal River:
~ II. - CR-3 Corrective Actions During the Next Refueling Outage
~
ia.
" Install indicating 1ights on all vital bus feeds".
. Toledo Edison will provide fused indicating. lights on critical bus
~
- feeds ' for the non-nuclear instrumentation- (NNI) and integrated control
- system (ICS). The specific circuits will be determined by the expanded
~
~
- evaluation of IE Bulletin 79-27 due to be completed on April 15 ' 1980.
Installation will' then be made during an outage -of sufficient duration after the engineering 'and material is available.
en k-y
,,-r u
g r-
=.
l
^
5.
3;p,,.
p s
~
SUBMITTAL-FOR'THE
- DAVIS-BESSE NUCLEAR POWER STATION iUNIT.1;
- ' FACILITY OPERATING-LICENSE NPF-3
- IN zRESPONSE.TO A. ;10 CFR 50.54 (f).
1 REQUEST DATED MARCH-6,.1980 CONCERNING CRYSTAL ~ RIVER UNIT NO. _3.
TRANSIENT OF FEBRUARY 26, 1980
.This response is filed in accordance with '10 t
'O.54(f).
This. letter provides information about the rel '
.,n ship of the Crystal River Unit No. -3 transient of. February 26, 1980 to the Davis-Besse Nuclear Power Station, Unit 1.
By s /R. P. Crouse Vice President, Nuclear Sworn to and subscribed before me. the seventeenth day of
. March.-1980.
s/ Linda L.~'Costell.