ML19312D350
| ML19312D350 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/22/1980 |
| From: | Trimble D ARKANSAS POWER & LIGHT CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| IEB-79-01, IEB-79-1, NUDOCS 8003240251 | |
| Download: ML19312D350 (2) | |
Text
4 ; %.,.j bec to DAC:ADM:
CENTRAL FILES
~
PDR:HQ LPDR mC ~
NSIC ARKANSAS POWER & LIGHT COMP *NY States PCST OFFICE BCX 551 UTTLE ROCK. ARKANSAS 72203 (501)3714C00 February 22, 1960
'1-020-22 2-020-14 Mr. K. V. Seyfrit, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region.IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
Subject:
Arkansas Nuclear One-Units 1 and 2 Docket No. 50-313 & 50-368 License No. DPR-51 & NPF-6 IE Bulletin 79-OlB-Environmental Qualification of Class lE Equipment (File:
1510,2-1510)
Gentlemen:
This letter is to inform you of the status of our efforts in response to the subject bulletin. We are presently developing our response to iteme 1, 2 and 3 of this bulletin.
However, due to the extensive effort re-quired by tnis bulletin and our concurrent efforts on other NRC. required items, we will be unable to complete all actions required by IE Bulletin 79-01B (items 1, 2 and 3) within the 45 days specified in the bulletin.
Following is our projected schedule of completion:
.i.
Items 1, 2 and 3 for three systems on each unit will be com-pleted and submitted to you by March 3 as required by item 7A of the bulletin.
(There arc approximately 15 systems per unit within the scope of the bulletin.)
2.
Items 1, 2 and 3 for all remaining systems will be completed by March 31, 1980.
During the interim period, between March 3 and 28,'results will be submitted on a system by system basis as they are completed.
Items-4 and 5 of the bulletin are required to be complete within 90 days of receipt of_ the bulletin. We plan to begin work on these items as soon as possible. Although completion of items 1, 2 -and 3 are a prerequisite to item 4, we will begin work on item 4 on a system by system basis as the -
- results of the prerequisite items are complete.
At this time, we do not have sufficient information-to develop a schedule of completion for items 4 & 5.
However,'in our estimation all action required for these items can-
.not be completed within the 90 days allowed.
8003240 z
Ch I sp Mr.'; X. V. Seyfrit.'
~
- February-22, 1980
- I!will keep you informed of.any significant developments and provide an estimated completion date for items 4 and 5 as 'soon as possible.
. Very truly yours,
M e "74 David C. Trimble Manager, Licensing
~ DCT:DRH:nak' cc: JW.D. Johnson U.~S. Nuclear Regulatory
. Commission P.O. Box 2090 Russellville, Arkansas 72801 f
4 s
y b
r.'
n',
1 4r
(
4
, -