Forwards Waste Package Insp Rept 79-06A on 791126-28.No Noncompliance Noted
ML19312D342
Person / Time
Site: Hatch, Browns Ferry, North Anna, Crystal River, Robinson, Neely Research Reactor, 02700047
Issue date: 12/31/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
CAROLINA POWER & LIGHT CO., FLORIDA POWER CORP., Neely Research Reactor, ATLANTA, GA, GEORGIA POWER CO., TENNESSEE VALLEY AUTHORITY, UNION CARBIDE CORP., VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19312D343 List:
References
NUDOCS 8003240244
Download: ML19312D342 (2)


Text

.

~e-

'o

/L

.fik k

UNITED STATES

~g

[ ' 3,,, f g

NUCLEAR REGULATORY COMMISSION 4 ( i. "

s REGION li o

101 MARIETTA sT., N.W SulTE 3100 o

ATLANTA, GEORGIA 3o3o3 DEC 311979 In Reply Refer To:

RII:RAB.

15000039/79-06A See Attached List (Region II Addressees)

Gentlemen:

This refers to an unannounced inspection conducted by R. A. Brown of this office on November 26, 27, and 28, 1979. A shipment of radioactive waste shipped from your facility was inspected upon. arrival at the Chem-Nuclear Systems, Inc.,

Barnwell, South Carolina disposal site.

' Areas examined during the inspection and our findings are discussed in the enclosed inspection report.. Within these areas, the inspection consisted of a review of the shipping papers, placarding and labeling requirements, radiation j

measurements, selective contamination surveys, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the. reasons on the basis of which it is claimed that the ' information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, Y.4

. T. Sutherland, Chief Fuel Facility and Materials Safety Branch

Enclosure:

. Inspection Report.No.. 15000039/79-06A cc: See Page 2 1

8003 24 o 24/y

n ' '.

c,

~,

1.

DEC 311973 :

~

.e cc:

U.S. Department of Transportation ATTN: ~ William L.' Barrow Federal Highway. Administration.,

1720 Peachtree Road,.N.W., Suite ~200-iAtlanta,! Georgia;' ~ "

LChem-Nuclear Systems, Inc.

1 ATTN:-'I.ee Hebbard;: Site Manager P.~.0. Box 726

- Barnwell, South' Carol'ina. 29812 '

f 4

4 0

4 e

e w

m t

0 f

,'y.

4,-

c n

N O

! y y

a

- q -

t t

e

,/

! Q!', )

it

^

s

._3 4N 3,.J.',-

  1. b e

4 a

a 4

n n

e rm e e

-n-w-- N,