ML19312D172

From kanterella
Jump to navigation Jump to search
Requests Extension Until 800415 to Submit Conceptual Design of Proposed Alternate Shutdown Panel Discussed in Util .Engineering Comments on Gilbert Associates Preliminary Spec Being Resolved
ML19312D172
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/18/1980
From: Herbein J
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
TLL-098, TLL-98, NUDOCS 8003210385
Download: ML19312D172 (1)


Text

.

Metropolitan Edison Company Post Cffice Box 480 M.Jdletown, Pennsylvania 17057 717 944-:041 Writer's Direct Deat Numeer March 18, 1980 TLL 098 Division of Operating Reactors Attn:

R. W. Reid, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commist 'on Washington, D.C.

20555 De.2r Sir:

Three Mile Island Nucler r Station, Unit I (TMI-1)

Operating Lice.tse No. DPR-50 Docket No. 50-289 Fire Protection Per our letter dated December 24, 1979, Met-Ed co=mitted to submit a con-ceptual' design of the proposed alternate shutdown panel. A preliminary specification was prepared by our architect-engineer, Gilbert Associates, cnd has been reviewed by our engineering staff. Upon resolution of the comments, - copy will be submitted to you to fulfill the above obligation.

Therefc,re, we are requesting an extension to submit our conceptual design until April 15, 1980.

Sincerely, J. C. Herbein Vice President Nuclear Operations JGH:DCM: hah ec:

J. T. Collins OO (p 5

do 8 0032 {0 h

.l

' WtroccLtan Ed. son Ccmcany :s a Merrter cf tre General Pt.t'c UtMes System

_