Submits Info Re Util Plans Not to Conduct Type a Leak Rate Test During First Refueling Outage.Recommends That Licensee Be Required to Perform Test
ML19312A530
Person / Time
Site: Indian Point 
Issue date: 03/15/1976
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML093630583 List:
References
NUDOCS 8111190915
Download: ML19312A530 (2)


Text

Sent FL aile to C,

-yf r i!, s/15/76 r

UNITi D 1,T I'.T l S UUCil/4 Fi f G U I c. I O f; Y Cr 7.!S 3iOT.'

RTL;eN 1 c v v;. v v i.. ; u v e t o: n 6', j !,, (; f fF

. i /:, F [ f '

'l l V s NIO

  • O 4 b ['

K. V.

Seyfrit, Chief, Reactor Technical Aosistance Branch, Olli:1!Q 1EDINi l'OIPT 2 CC:: TAT:::2.? T LEAK KATE TEST 1!:0 (TRACK T142921I])

This renorandum is forwarded for cetion.

It docun;nt s information given to you in our telepi.me convertations of March 11 cnd 12, 1976 related to Consolidated Edisan's plans to nat conduct Type A 1.cah Rate Test u

during the first refueling, outage.

Appendix J, Section 111, D.l. (a) requires that "..

a set of three Type

/. tests shall be performed, at approximately equal intervals during each 10-year service period.

The third test of each set shall be conducted when the plant is shutdown for t.he 10-year plant inservice inspections."

This requircnent is footnoted to reference 10 CFR 50.55a ghich in turn (50.55a(g)) ref erences ASD: Section XI.

Scction XI states in Paragraph 15-241 that "... inspection intervals [10 years]

represent calendar years after the reactor facility has been placed into conrnercial service."

Indian Point 2 perforced the preopsratienal Type A test on March 9-12, 1971, and has cheduled i.ts first rcrueling shutdown for an 8 week period beginni:

March 28, 1976; however, the licensee does not plan to conduct a Type A test until the second refueling outage scheduled to begin September 1977.

This vould rican t hat a period of approximately 6 1/2 years will have elapsed between Type A tests.

Although Indian Point 2 Technical Specification 4.4.II. A.6 only requires a Type A test "... approximately nidway between the major shutdowns for inservice inspections" and one "... at the end of the 10 year interval,"

the licenree plans to conduct Type A tests in accordance with Section 111.D.l. (a) of Appendix J.

The problen is that the licensee defines-the start date for the 10 year IST program as June 30, 1974, (commercial operation date establishea by the licensee) whereas Region I believes the 10 year Type A inspection interval should be keyed to the date of the preoperational test.

In addition to the Type A test issue, the licensee is also keying his Type E and C test schcdule as required by Appendix J on the June 30,1974 date.

This appears contrary to the requirements of Sections III.D.2 and III.D.3 of Appendix J vhich require Type B and C be perforned at no greater than 2 year intervals.

Some of the ptuToq O

i)

,i. n c w-

  • 3
  • g

'q f fD

?> <%.s &:Q $

E

'hs.&

3 7- 7h o

1:

t J

- co pentr.ts at Inditin Pc ;t 2 hwc not b:ren lyre T, or C tc-ted n:nce the preoper:.tdoral tccu ucr.s Nrfor cd in 1970 < :d 1971.

(It s.I' uld be ncite tin t c ul: t hone ' n1s o ;>ressuri: d 1y the Peu t ration ind il eld Cla nr ~ 1 Pr es: a ri zatic n S; r.t are required by the Icebnical Specificat. ions to be local le a rate t r" t < r.)

The ijpe B cnd C t ests are E.chedulta to b.

completed cit.rin; th eg.c= ng, refueling shutdocn.

Rn,ien,i stri u,: r e t er m e. s,. 0 t,aa r t.ne licencee be regulrca yp L2 cens1n t; to p.fo:n the 3 :. 0 e t. c. c during tLo first ref ueling shutdcarn.

Fa g;cn I a:i na r ecc: -. ends that Licennu.';'s di sp i tion of this tatter be trans nitted to the licencee as roon as pocrible.

n

( /ns c

j Qw w

I:1 don M. Erunner, Chief Rest':or Operations and I:udlear Support Eranch 01 LI:, Region 1 cc:

G. Roy T. Dreher