ML19312A198
Person / Time
Site: Palisades 
Issue date: 08/20/1979
From: Forbes R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18043A985 List:
References
PAL-79-07-NC28, PAL-79-7-NC28, NUDOCS 7908280668
Download: ML19312A198 (1)


Text

. -..X File No P10.2.1 Incident No PAL-79-07-NC28 NPDES NONCCMPLIANCE NOTIFICATION Possible Noncompliance With Daily Aversge/ Max bum Limitation August 20, 1979 Plant: Palisades Permit No MI 0001457 Outfall

Description:

Cooling Tower Blowdown Outfall No: 800173 Prior to Dilution Parameter: Sulfate Parameter No: 00945 1.

Date of Incident: July 31, 1979 2.

Identification of specific c luent limitation exceeded: Weekly Sampling for Sulfate 3.

Description of Incident: The weekly sampling and analysis for sulfate in the cooling tower blowdown was not performed during July 1979.

4.

Apparent Cause: Tee-4cian er-cr.

5.

If not imediately corrected, the anticipated time the condition is expected to continue: NA 6.

Corrective Action - The following corrective action was taken or will be taken to reduce, eliminate and prevent recurrence: An analysis for sulfate was performed on a composite sample representing the blowdown eftluent. This value was reported on the MOR. A schedule of required sampling will be reviewed with appropriate persons to insure all sampling 4

and analysis will be performe 7.

Additional Coments: NA S.

Signed: Ronald L Fobes bY 2021 263 790828066s