ML19310A703
| ML19310A703 | |
| Person / Time | |
|---|---|
| Issue date: | 06/04/1980 |
| From: | Foster J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Dircks W, Gramann R NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| Shared Package | |
| ML19310A704 | List: |
| References | |
| CON-FIN-B-6412-9, CON-NRC-02-79-029, CON-NRC-2-79-29 NUDOCS 8006230039 | |
| Download: ML19310A703 (1) | |
Text
--
j.e CONT R ACT f.UMBE R rJRC Fo:M 255 110 76)
NRC-02-79-029 Olvis ON OF CONTRACTS MODIFICAT80N NUMBER j
U.s. NUCLE AR REGULATORY CCMM:SSION Two (2)
WASHINGTON, D C. 20555 C r.EW O MOOlFICAflO*.
OTHE R ISpe:*fyl F!.OTIFICATION OF CONTRACT EXECUTION CONTRACT BASED ON:
T O '.
William J. Dircks, Director AUTHORIZATtON NU'.?BE R Office of Nuclear Material Safety and Safecuards D^rE lOrganaat.on)
CCNTR ACT CH ANGES PER THtS ACTIO*.
/
e ?.
FROM: JOanne M. Foster
-J. t u 71
'a.
~~
roarel
- 1. Reesbablishes the delivery teontracr soec,ai,,ri /
c
'j dates specified in the Technical Assistance Contracts Branch 2.
Period of Performance is modified DIVISION OF CONTRACTS. ADM CONTR ACTOR (Name & Location)
EXECUTION DATE 6/4/80 Science Applications, Inc.
TYPE OF CONTRACT LaJolla, CA 92038 Firm Fixed Price PROJECT TITLE PERIOD OF PERFORM ANCE 7/23/79 - 7/11/80 Synthesis of Physical Security and Material PR NCIPAL INVESTIGATOR Control and Accounting Assessment Results L. Harris, Jr.
NRC AUTHORIZED REPRESENTATIVE R. Gramann B&R NUMBER FIN NUMBER AMOUNT 50-19-02-02-0 B 6412-9 NEW NRC FUNOS s FUNDING TOTAL FY 7&0 FUNDING s 71,950.00 TOTAL NRC OBLIGATIONS S 71,950.00 GOVERNMENT PROPERTY ATTACHMENT (SI:
CONTR ACT DOCUMENT (
I NRC FORM 256 (10L76)
'30062 300 M -
J