ML19310A672

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation of Facility Accident Reanalyses in Support of Full Power Operation.Reanalyses Results Are Acceptable to Justify Full Power Operation Provided That Noted Conditions Are Met
ML19310A672
Person / Time
Site: Fort Saint Vrain 
Issue date: 04/30/1980
From: Denise R
Office of Nuclear Reactor Regulation
To: Speis T
Office of Nuclear Reactor Regulation
Shared Package
ML19310A673 List:
References
NUDOCS 8006200626
Download: ML19310A672 (1)


Text

..

. ~... -...,.

, s.

. ~

}2i ~

bDocket FHe NRK Rdg. File Di W D D. ( n u p '(

IU

~

APR 3 01980

~,,

EMDRANDUM FDR: Theads P. Speis. Chief,1 Advanced Reactory Sanch, DPM: 'M.

, _ ; s.

FRDM Richard P. Denise, Acting Assistant Director for Reactor Safety DSS:

SUBJECT:

FT.ST.YRAINACCIDENTl REANALYSIS R

_.Jhe_Anaimis Branch has completed review of the Ft. St. Vrain accident

! reanalyses in support of full power operation for the plant.. We have c66cTuded that the reanalyses results are acceptable to justify full power operation provided that:

(1) ~ a'large unce.rtainty in RECA3 transient response pmdictions of mgion outlet temperature is resolved or accounted for via operating restrictions..and (2) technical specifhcations governing acceptable. power-to-flow ratios are avised consistent with the safety analyses, The Safety Evaluation Report is enclosed. This report does not address core fluctuations which remain Ghder review.

92'181 cal Signed By:

Richard P. Denise, Acting Assistant Director fbr Reactor Shfety Division of Systems Safety

Enclosure:

As stated cc:

R. Mattson D. Ross R. Tedesco Z. Rosztoczy l

G. Kuznycz L. Rubenstein L. Phillips B. Sheron

~ H. Tokar 8006J006Mo i

R. Ireland I4' 9

i SJ mo m

yy l

Coppp$L. Phillips, NRR, X27141

. g.(

l DSS.jg/b DSS:AB DSS:ABk 1

}

orrica >

sb/

RPDenjs sunuuc w LEPhili ZR y 09s/80 4/ f ri- /80

% /80

/

/

j s

oys, NRC Form 318 A (4-79) NRCM 0:040
  • we..........,..,.....c.

..