ML19310A628

From kanterella
Jump to navigation Jump to search
Requests Encl Emergency Change to Route Approved by NRC .Change Necessary Due to Portion of Route Being Closed for Maint
ML19310A628
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/21/1980
From: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
FOIA-80-544 16119, NUDOCS 8006200571
Download: ML19310A628 (1)


Text

.

O CON ECTICUT YANKEE ATOMIC POWER COMPANY B E R LI N.

CO N N ECTIC U T P. o. SOX 2 70 HARTFORD. CONNECTICUT OslOS Tats eisee s aO2 ees-eso April 21, 1980 Docket No. 50-213 Director Office of Nuclear Materials Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Reference:

(1)

G. McCorkle letter to W. G. Counsil dated March 31, 1980.

Gentlemen:

Haddam Neck Plant Advance Route Approval - 10CFR73, Section 73.37(a)(1)

Apelicant Licensee: Connecticut Yankee Atomic Power Company, FTOL DPR-61 The Reference (1) letter granted approval for the transport of spent reactor fuel along the route described in the Attachment to the letter.

At this time, we are requesting tn emergency route change, as outlined in the Attachment to this letter. The change is required due to a portion of the route being closed for maintenance.

The Attachment to this letter contains information of a type specified in 10CFR Part 2.790(d) and is deemed to be commercial or financial infor=ation within the meaning of 10CFR9 5(a)(4) and shall be subject to disclosure only in accordance with the provisions of 10CFR Part 912.

If you have any questions or comments on this application, please contact us.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY

$M W. G. Counsil Vice President Attachment

}{oll 9 8006200 5 7l P