Monthly Operating Rept for Apr 1980
ML19309H920
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/15/1980
From: Mitchell D
METROPOLITAN EDISON CO.
To:
Shared Package
ML19309H915 List:
References
NUDOCS 8005200657
Download: ML19309H920 (5)


Text

.-__ _ _ _ _ _ _ _ _ . - _ _ - _ _ _

C.

OPERATING

SUMMARY

800s200651g The Unit was shut down the entire month by order of the NRC. Core cooling was provided by the "B" Decay Heat System.  !

Major Safety Related Maintenance - April The following major safety related maintenance was performed during April:

] BWST Heater Repairs While the BWST was empty, meggar and resistance checka of the BWST heaters were performed. The results of these checks in-dicated that one heater was grounded, and the other had very low meggar readings. The grounded heater was replaced with a spare, and the other heater was repaired.

BWST Lower Manway Repair In the process of filling the BWST, the lower manway was found to be leaking.

The tank was drained and a new manway gasket and sealant comoound was installed. The manway was replaced and torqued and tank was refilled. The manway was leak checked and found to be leak tight.

l

_ D D }'T } 3 c c Ju oN.S. m OPERATLNG DATA REPORT DOCKET NO. 50-289 DATE May 15._ 1980 COSIPLETED BY D- C. Etchell TELEPilONE (21 s) 921-6579 OPERATING STATUS t

I 1. Unit Name: Throo H10 Tal md Nucl ony StnH an. Unit I I 2. Reporting Period: Anett 1980

3. Licensed Thermal Power (51Wt): 2535
4. Nameplate Rating (Gross SIWE): 871 S. Design Electrical Rating (Net 31We): 0
6. Sf aximum Dependal :e Capacity (Gross $1We): 840
7. Alasimum Dependable Capacity (Net 31We): 776
8. If Changes Occur in Capacity Ratings (1: ems Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted.If Any(Net 31Wc):
10. Reasons For Restrictions.lf Any:

i This alonth Yr..to.Date Cumulative l

11. Hours in Reporting Period 719* 2903. 49632. l
12. Number Of Hours Reactor Was Critica! 0.0 0.0 31731.s
13. Reactor Reserve Shutdown Hours 0.0 0.0 839.5

. 14. Hours Generator On.Line 0.0 0.0 '

31180.9

15. Unit Reserve Shutdown Hours 0.0 0.0 O.0
16. Gross Thermal Energy Generated (SIWH) O. O. 76531071.
17. Gross Electrical Energy Generated (31WH) 0. _

O. 25484330. .

18. Net Electrical Energy Generated (31WH) O. O. 23840053.
19. Unit Service Factor 0.0 0.0 62.8
20. Unit Availability Factor 0.0 0.0 62.8
21. Unit Capacity Factor (Using SIDC Net) .

0.0 0.0 61.0

22. Unit Capacity Factor (Uning DER Net) 0.0 0.0 58.6
23. Unit Forced Outage Rate 100.0 100.0 26.2
24. Shutdowns Scheduled Over Next 6 Stonths (Type. Date,and Duration of Each):
25. If Shut Down At End Of Report Period Estimated Date of Startup: *
26. Units In Test Status (Prior o Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COSIAIERCIAL OPERATION 2*
  • * ? c.1.;.* a ~ *. .r- .. s  :;*f

( _-_____. _ _ . 2- , ,- - - - - - - -- - ? -- - - ?

- ~ - -- - - - -

---q i

l l

j AVERAGE DAILY UNIT POWER LEVEL  !

DOCKET NO. 50-289 UNIT TMI-1 i DATE May 15, 1980 CO31PLETED BY _ D. G. Miechell TELEPHONE (215) 921-6579 April 1980 AIONTil DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY Pot *'ER LEVEL (MWe-Net)

(MWe Neti 1 0 0 g7 2 o IS 0 3 0 19 o 4 0 l

> S O 0 21 6 o ,, 0' j ~~ -

t 1 7 0 0

8 0 24 o 9 0 f 0 10 0 26 o II o 27 o 12 0 2S 0 83 0

  • 29 o 14 0 30 0 i$ 0 3I o I6 0 INSTRUCTIONS On this format. list the average daily unit power levelin MWe-Net for each dayin the reporteng m the nearest whole megawatt.

G

T REFUELI?!G I?iFCRMATIOli REOUEST -

D D.* M[ J g J)

D I [A d h lN

1.  !!a=e of Facility:

Three Ilile Island Nuc'. car Station, Uni: 1

2. Scheduled date for next refueling shutdown:

Unknown .

3 Scheduled date for restart following refueling:

Unknown .

24 . Will refueling or resu=ption of operation thereafter require a technical specification change or other license anend=ent?

If assser is yes, in general, what vill these be?

If answer is no, has the reload fuel design and core configuration been revieve by ycur Plant Safety Review Co=mittee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50 59)?

If no such review has taken place, when is it scheduled?

Amend =ent No. 50, Cycle 5 reload, was approved on 3-16-79

/

5 scheduled date(s) for sut=itting proposed licensing action and supporting infor=.stion:

D/A 9

6. Important licensing considerations associated with refueling, e.g. nev
  • or different fuel design or supplier, unreviewed design or performance analysis cethods, significant changes in fuel design, new operating procedures:

H/A .

7 The number of fuel assemblies (a) in the core, and (b) in the spent fuel storage pool: .

(a) 177 (b) 208 .

The present licensed spent fuel pcol storage capacity and the si::e of 8.

any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: .

The present licensed capacity is 752. There are no planned increases at this time.

9 The projected date of the last refueling that can be discharged to the spent -

- fuel pool assuming the present licensed capacity: ~

1986 is the last refueling discharge which allevs full core off-load capacity (177 fuel assemblies). ,, y, .  ;~~. /

i ....s- -

., e

- n.:.:::

. 4.c. -.u,. . - .<

<...~. ..'.:

i .s -...- -

.n, u..;

. a.

. . -? . ::

vw M:v.:C, a v. .. . . c;.;.em

! =

s... . .. % s.... . . . . . .-. . ...A..-co.. r.. .. . ame.Na 4.:l? N +i.fi+.

. e .r.wie.x e

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-289

  • UNIT NAME TtII_1 DATE _ May 15, 1980 REPORT MONTil __ April 1980 COMPLETED BY D. G. ?!itchell 1 ELEl110NE (215) 921-6579 e.

u E ~.

Nii. Date

-, .! ? ,[ ~g I.icensee ,E4, 'O. Cause & Corrective r

H 3g  ;; j g a: Event 3Y c'8 Action to fE 5 e~

o di e Report = in U EO Prevent Recurrente g o O

1 4/1/80 F 719 D 1 .

Regulatory Restraint Order I 2 3 4 F: Forced Reason: Method:

'S: Scheduled A Equiprnent Failure (Explain) Exhibit G-Instructions 1-Manual for Preparation of Data B. Maintenance of Test 2. Manual Scram.

C-Refueling Entey Sheets for 1.icensee 3-Automatic Scram. Esent Report ti.LRi file (NUREG-D-Regulatory Restricth:: 4 Oiher (Esplain) .

E-Operator Training & License Examination 01611 I F Administrative 5

G-Operational Error (Exrlain)

' (9/77) Il-Other (Explain) .

Exhibit I - Sanw Simrce

- _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _