ML19309H617

From kanterella
Jump to navigation Jump to search
Forwards LER 80-050/03L-0
Date released: 11/19/2019 Download: ML19309H617


LER 80-050/03L-0:on 800407,during ISI Pump Operability Testing,While Shut Down for Surveillance/Vent Header Installation Outage,Determined That Standby Liquid Control Pump B Did Not Meet Acceptance Criteria
ML19309H621
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/05/1980
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309H621 (3)
Forwards LER 80-050/03L-0
ML19309H616
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/05/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309H616 (1)