3. . 8005130'/.5.2 S

Georgia Power Company Post Office Box 4545 Atlanta, Georgia 30302 L

Telephone 404 522-606o Vogtle Project Southem Company Services, Inc.

Post Office Box 2625 May 8, 1980 Birmingham, Alabama 35202 l Telephone 205 87o-60t1 l

United States fluclear Regulatory Commission File: X78G03M5 Office of Inspection and Enforcement Log: GM-619 Region II - Suite 3100 101 Marietta Street, it.W.

Atlanta, Georgia 30303 '

Attn: Mr. James P. O'Reilly

Reference:

RII: JP0; 50-424; 50-425; Potential 10CFR50.55(e)

(Embed Plate Load Capacity Tables)

Gentlemen:

On January 28, 1980 it was reported to your office that a potential item under 10CFR50~.55(e) existed at Plant Vogtle concerning embed plate load capacity tables.

In letter number GM-577 we indicated that a detailed review, analysis and identification of the necessary modification of the pipe supports was currently underday and that a final report would be issued May 16,1980.

To date the progress of this evaluatin is as follows:

(a) Of the 5,760 affected pipe supports, 2,824 needed no review because they were custom designed by engineering and did not employ d:e load capacity tables in the design. Engineering will notify the site that the currently imposed " hold" will be lifted for these supports.

(b) Approximately 1,105 supports have been revised as a result of this review. The related design drawings have been revised and are being reissued for construction.

(c) 'ae remaining 1,831 supports are currently undergoing review and ,

the design drawings will be reissued after they have been revised '

to meet the design requirements.

This review is still underway with a final report now scheduled to be sub-mitted by July 15, 1980.

30/9 ,

35 IfD

--. _ ... . _. 1 l

Mr. James P. O'Reilly Page 2 This response contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.

Very trul urs,

- e _.

~n Doug Dut n, Project General Manager DED/caa xc: U. S. Nuclear Regulatory Commission g/'

Attn: Victor Stello, Jr. Acting Director Office of Inspection and Inforcement Washington, D.C. 20555 M. D. Hunt, NRC Region II J. H. Miller, Jr.

F. G. Mitchell, Jr.

R. J. Kelly C. F. Whitmer R. E. Conway D. E. Dutton R. H. Pinson J. T. Beckham, Jr.

R. W. Staffa K. M. Gillespie L. T. Gucwa C. R. Mil es , Jr.

E. D. Groover D. L. McCrary R. A. Thomas

0. Batum J. A. Bailey M. Z. Jeric B. L. Lex O

~~

-Y v m- -- ,

_