ML19309H340
| ML19309H340 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 04/17/1980 |
| From: | Rooney V Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19309H335 | List: |
| References | |
| NUDOCS 8005130074 | |
| Download: ML19309H340 (2) | |
Text
_
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET N05. 50-321 AND 50-366 GEORGIA POWER COMPANY, ET AL.
H0TICE OF ISSUAhCE OF AMEN 0 MENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amencnent Nos. 73 and 14 to Facility Operating License Nos. DPR-57 and NPF-5 issued to Georgia Power Conpany, Oglethorpe Power Corporation, Municipal 1
Electric Authority of Georgia, and City of Dalton, Georgia, which revised l
j Technical Specifications for operation of the Edwin 1. Hatch Nuclear Plant, l
Unit Mcs.1 and 2 (the facility) located in Appling County, Georgia. The amendments are effective as of the date of issuance.
4 The arendments. (1) substitute equivalent terminology for computation of Average Power Range Monitor (APRM) Rod Block and Scram setpoints with revised surveillance requirenents; (2) amend the license to correctly identify the co-owners of Hatch Nuclear Plant; and (3) permit modification of the APRM 4
trip systen by incorporating a Thernal Power Monitor for Hatch Nuclear Plant Unit 2 (:reviously accomalis".ed on Unit 1 by Amendment 69 to DPR-57).
Miscellaneous editorial changes were made in the Hatch Unit 2 TS to bring ther irto conformance with current General Elec tric Standard Technical Specifications.
The applications for the_ amendments comply with the standards and require-i ments of the Atomic. Energy Act.of 1954, as amended _ (the Act), and-the Com-ission's rules and regulations. The Commission has made appropriate i
j findings as required by the Act~ and the Comnission's rules and regulations Prior in 13 CFR Chapter I, which are set forth in the license amendments.
public notice of these arendments was not required since the anendments do not invalve a significant hazards consideration.
O.j
- The Comission has determined that the issuance of the amendments will not result in any significant environmental impac+. and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statonent or negative declaration I
and environmental impact appraisal need not be prepared in connection with issuance of the amendments.
For further details with respect to this action, see (1) the applications for amendments datqd 0.ctober 18,1978, June 5,1979, November 8,1979, and February 28,1980,(2) Amendnent Nos. 73 and 14 to License Nos. DPR-57 and 4
l flPF-5, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Comission's Public Document Room, 1717 H Street, NW., Washington, D. C. and at the Appling County Public Library Parker Street, Baxley, Georgia. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D. C.
20555, Attention:
Director, Division of Operating Reactors.
Dated at Bethesda, .aryland, this 17th day of April 1980.
FOR THE NUC R REGULATORY COM'ilSSION r<
'jfly~s Vernon L. Rooney, Acting Chief Operating _ Reactors Branch #3 Division of Operating Reactors 4
4 m-