Responds to Violations Noted in NRC .Corrective Actions:Installation of Temporary Chain & Lock Sys
ML19309G963
Person / Time
Site: Framatome ANP Richland
Issue date: 03/31/1980
From: Nilson R
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
To: Norderhaugh L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML19309G959 List:
References
NUDOCS 8005080065
Download: ML19309G963 (1)


Text

80 050 8 il O GE E(ON NUCLEAR COMPANY,inc.

RESEARCH AND TECHNOLOGY CENTER 29% George WnNngton Way, Richland, WnNngton 99352 9I cd, \\

/,/s A PHONE: (509) 943 7100 g

U AECENEf APR 6

March 31, 1980 7

1960 T

2

' ra,

'b

/ ;,, g i s Mr. LeRoy R. Norderhaug Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 1990 North California Boulevard Walnut Creek Plaza, Suite 202 Walnut Creek, CA 94596

Dear Mr. Norderhaug:

Docket No. 70-1257 License No. SNM-1227

Reference:

Letter and Attachments L.

R. Norderhaug to R. Nilson, March 19, 1980

Subject:

NRC Inspection The item identified in Appendix A of the above reference was corrected immediately upon demonstration by the inspectors of the defective mechanism by installation of a temporary chain and lock system. A permanent chain and lock system has now been installed.

We believe that the above corrective action will prevent any future infractions of this nature.

The information in this letter is proprietary in accordance with 10 CFR 2.790(d).

Sincerely, s

R. Nilson, Manager Corporate Licensing and Compliance RN: RAS: sir AN AFFILIATE OF EXXON CORPORATION j