Forwards Interim Rept, Power Burst Facility Chamber Calibr Experiment Operating Spec & Revision DRR-TFBP-236
ML19309G843
Person / Time
Issue date: 03/05/1980
From: Zeile H
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Tiller R
ENERGY, DEPT. OF, IDAHO OPERATIONS OFFICE
Shared Package
ML19309G844 List:
References
NUDOCS 8005070675
Download: ML19309G843 (8)


Text

,

o (. -o 8005070[pp March 5,1980 Mr. R. E. Tiller, Director Reactor Operations and Programs Division Idaho Operations Office - DOE Idaho Falls, 10 83401 PBF CHAMBER CALIBRATION EXPERIMENT OPERATING SPECIFICATION - HJZ-74-80

Dear Mr. Tiller:

Transmitted for your information are three (3) copies of the Experiment Operating Specification for the PBF Chamber Calibration Test and a evision (DRR-TFBP-236).

Very truly yours, h

H. J. Zeile, Mana er c

Thermal Fuels Behavior Program jh Attachments:

As stated cc:

R. W. Barber, 00E - 2 W. V. Johnston, NRC - 2 R. W. Kiehn, EG&G Idaho, w/o attach 91 bec:

TFBP Prograw 5tandard M. M. Andreason S. R. Gossmann T. K. Samuels7c X. M. Spencer l

L. A. Stephan Central File H. J. Zeile - File

  • e s.Aa w

,m..

k

f

@OPED.NO.

Zy,,,'S"

DOCUMENT REVISION REQUEST

,,aE C,

@ REGUESTER

@ ORR DATE

@ CAR NO.

L. A. Stephan TFBP-236 U.]"EN g IQlCABLE) power Burst N EU ff/ Chamber Calibration 00CUMENT ISSUE 0 ATE 5

N 0

Experiment operating Specification February 1980 Q/ CHECX APPLICA8LE BLANK MANAG{R AP)ROVAL ATE PERMANENT CHANGE TEMPORARY CHANGE BULLETIN

@ PRINT OR TYPE PROPOSED CHANGE - NUMBER EACH CH ANGE SEOUENTIALLY IN IST COLUMN AND RECORD PAGE AND di P'OR PARAGRAP 9 FOR FOR EACH CHANGE.

WRi ER'S USE STEP OR INSTRUCTIONS. REWRITE PARAGRAPHfS) OR FOR EXTENS;VE CHANGES ATTACH REVISED COPY AND STATE " REVISE PER ITEM PAGE PARA.

ATTACHED COPY". FOR NEW DOCUMENT. ATTACH ROUGH 0 RAFT AND STA TE" PREPARE NEW (SP.00P. ETC.) PER ATTACHE 00R AFi".

1 4

6

' One turbine flowmeter located in the shroud lower extension to measure orifice flow rate.

2 6

table See attachment 1.

1.

3 12 table See attachment 2.

2.

4 17 table See attachment 3.

4.

5 20 table See. attachment 4.

5.

6 23 table See attachment 5.

6.

C USE CONUNUATION SHEET AS REQUIRED NEXT ANTICIPATED NEED FOR 00CUMENT WITH THIS REVISION INCCRPCRATED: DATE/ EVENT

@ JUSTIFICATION: ' REASON FOR CHANGE - NUMBER TO CCARESPONO TO ITEM NO. A80VE):

@ OTHER 00CUMENTADON AFFECTED:

Items 1, 2, 6 Recording of the flow rate through one of 00C. NO.

ORA NO.

DATE COMPLETED the spare flow meter orifices was added to allow measure-ment of flow to be recorded if the shroud finw meter fail s.

Item 3, a, 5 Another power burst was added (2.7ms -

460MJ).

@ ORIG lNATlNG ORA NO:

h REVIEW DATE!

f

@gEW JAME/ SIGNA,TURE,

CRG.

NAME/ SIGNATURE CRG.

DATE NAME/ SIGNATURE CRG.

DATE J////17/m 2970 J/34d l

l~

l OUAury civl

' k ddwL.czo

%Aro!

l lS>Ferrwl T

& &.4tal4-.s-N i

l ll PRAC l

@ COMVENTS.

@ w!T10NA A00 AEVISiCN r

@ DOCUMENT CONTROLLER

@ RELEASE DATE.

@ CAR CCMPLETED DATE:

(

e 4

@OPER.NO.

77,",l""

00CUMENT REVISION REQUEST

,,as c,

@ REQUESTER

@ ORR DATE

@ CRR NO.

t.. A. Stephan TFBP-236

@ 00CUMENT NO. (IF APPLICABLE) poWerBurstgg*fEf[fD/ChamberCalibration 00CWENT ISSUE DATE 0

EGG-TFBP-5094 Experiment operating Spec 1fication February 1980

(

CX APPUCABLE BLANK

- MANAG R app 0 VAL ATE PERMANENT CHANGE TEMPORARY CHANGE SULLETIN w

y

@ PRINT CR TYPE PROPOSED CHANGE - NUMBER EACH CHANGE SECUENTIALLY IN IST COLUMN AND RECORD PAGE AND P'CUARAGRAPH NUMBER

' @ FCR FOR EACH CHANGE.

WRITER'S USE STEP OR INSTRUCTIONS. REWAITE PARAGRAPWS) CR FOR EXTENSIVE CHANGES ATTACH REVISED CCPY AND STATE -REVISE PER ITEM PAGE PARA.

ATTACHED CCPY FOR NEW 00CUMENT. ATTACH RCUGH ORAFT AND STATE"PREPARENEW (SP.00P.ETC.) PER ATTACHED ORAFT".

1 4

6

' One turbine flowmeter located in the shroud lower extension to measure orifice flow rate.

2 6 table See attachment 1.

l.

3 12 table See attachment 2.

2.

4 17 table See attachment 3.

4.

5 20 table See. attachment 4.

5.

6 23 table See attachment 5.

6.

USE CONTINUATION SliEET AS REQUIRED NEXT ANTICPATED NEED FOR 00CUMENT WITH THIS REVISICN INCORPORATED CATE/ EVENT

@ JUST1FICATiON: TREASON FOR CHANGE - NUMBER TO CORRESPOND TO ITEM NO. ABOVE):

@ OTHER DOCUMENTATION AFFECTED:

Items 1, 2, 6 Recording of the fTow rate through one of c0C. NO.

ORA NO.

DATE COMPLETED the spare flow meter orifices was added to allow measure-ment of flow to be recorded if the shroud flow meter fail s.

Item 3, 4, 5 Another power burst was added (2.7ms -

460MJ).

@ ORIGINAUNG CAR NO:

REVIEW DATEf DATEf NAME/ SIGNATURE b

}AME/ SIGNA,TURE,,

ORG.

NAME/ SIGNATURE CRG.

CO CAG.

DATE

///A2 raw 2020 3/3h V

' u'u" *l hx ddw1..uz.o Weol l

I 5^'5" *l

&& 40AM4M I

l PRAC l

@ CC"MENTS:

ADDITIONAL D

EN REVISION h 00CUMENT CONTROLLER

@ RELEASE OATE

@ ORR COMPLETED DATE:

e

s TFBP-DRR-236 TABLE 1.

CHAMBER CALIBRATION INSTRUME;:T REQUIREMENTS Maximum Instrument Instrument Mea surement Instrument Location Rance Local Neutron SPND 0.47m, 2700 3x1017ny Flux Coolant Pressure Flow Shroud 0-69 MPa Pressure Transducer Outlet Cool ant Pressure Flow Shroud 0-17 MPa Pressure Transducer Outlet Coolant Inlet TC Flow Shroud Ambient - 630 K Temperature Inlet Ccolant Temo TC pair Flow Shroud 0-10 K Rise Inlet and Outlet Flcw AC Flowmeter Shroud 0-1100 cm3 s Output Pickoo Coil Inlet

~

/

Power Ion Chamber Plant 0-30 MW NMS3 Power Ion Chamber Plant 0-30 MW NMS4 Power Ion Chamber Plant 0 10GW* 1 PPS#1 Power Icn Chamber Plant 0-10GW*

PPSf2 Pcwer Ion Chamber Plant 015 GW+

PPS?3 Power Ion Chamber Plant 015 GW+

PPS#4 Power Ion Chamber Plant 0-100 GW*

TR-1 Pmver Ion Chamber Plant 0-100 GW*

TR-2 Power Ian Chamber Plant 0-100 GW*

EV-1 l

Flow Rate Turbine Flowneter 0-2.01/s Flowmeter-Orifice i

I

(

h

=-

TABLE 2.

(continued)

Lono T ime.

Anticipated Test inlet Shroud Loop Mode of Duration Reactor Power Temperature Flow Pressure Operation (as noted)

(is noted)

(K)

(l S)

(MPa)

Comments

/

.2.05 ms 2 hr 70 GW peak 538 0.035 6.45 Sixth chamber linearity power burst pcwer power burst.

2 hr 22 ro 538 0.085 6.45 Remove irradiated and install new complement of flux wiras.

30 m 7ero 538 0.035 6.45 Instrument status check, R;

zero power offset taken, 1

range changes.*

2.70 ms power 2 hr 38 GW peak 538 0.085 6.45 Seventh chamber linearity burst power burst 2 hr Zero 538 0.085 6.45 Remove irradiated and install new complement of flux wires 30 m Zero 538 0.085 6.45 Instrument status check, g y, zero power offset taken, ggg-range changes.*

7'g Ei 5teady poser 2 he

?? MW 538 0.085 F. 45 Steaav power relia t ic q l33 as m heatina affect tast.

83 n, 8 hr Loop cooldewn.

See Table 5 for TLS and amp'lifier-switch positions and ranges

r t

TABLE 4 tXPECTED SIGftALS Dif f erent ial Chamber Currents (Amperes at Max Power)

Teaperature Test

( o F)

NMS-3 NHS-4 PPS-1 PPS-2 PPS-3 PPS-4 TR-l TR-2

[V-1 EV-2 Strady Power 1.2 1.475x10-6 g,405,30-6 49,95,10-6 42.67x10-6 1.206:10-6 1.218:10-6 1.242x10-6 1.185x10-6 pg,gnto-6 37,5,10-6 15 MW Strady Power 10.0 2.065x10-6 3,%7,30-6 69,93 x10-6

$9,74,50-6 1.688x10-6 1.705 10-6 3,739,30-6 1.659x10-6 ao,74,30-6sa,s,go-6 21 MW StraJy Power 12.96 2.655x10-6 2.529:10-6 89,93,10-6 76.82x10-6 2.17x10-6 p,397,10-6 2.236 x10-6 2.133x10-6 52.38:10-667.sul0-6 27MW Burst M 2.66x10-3 2.27x10-3 0.064x10-3 0.065 10-3 0.066x10-3 0.063 x10-3 1.55x10-1 2.0x10-3 (0.8 Gw)

Burst #2 6.99x10-3 5.tx10-3 0.145 x10-3 0.146x10-3 0.149x10-3 0.142x15-1 3.49:10-3 4.5x10-3 (1.8 GW) grgtg 12.40x10-3 11.09:10-3 0.314x10-1 0.3166x10-3 0.323x10-3 o,303,30-3 7,57,30-3 g,75,go-1 Burst #4 24.97 x10-3 21.3410-3 0.603:10-3 0.609:10-3 0.621:10-3 0.593x10-3 14.65x10 3 18.7%x10-I (7.5 CW)

MN wn Burst #5 l.366x10-3 1.380x10-3 1.408:10-3 1,343,g0-1 32.98x10-1 42.50x10-3 7$

(17 GW)

C7

o E3 Burst #6 6.796x10-3 5.53010-3 135.8:10-3 17s.0x10-1 7$

(70 GW) cn w Burst #7 3.146x10-3 3.002x10~3 73 1x10-3 95.0x10-(38 CW)

' ~

F I

1ABLE 5 BURST TESTS SEQUENCE AND PARAMETERS TEST Reactivity Reactor Peak

%rst TLS PPS Scram PPS Time Mplifier Insertion Period Power Energy Position level Scram Range (No.)

($)

(ms)

(GW)

(MJ)

(GW)

(sec)

Full Scale (GW)'

(?R-1, IR-2. EV-1 EV-2. PPS-1 2P,5-2)

P I

1 0.028 none 1/0.05 0.015 Calib. -1 I

_0.028 none I/0.05 0.021 Calib. -2 Calib. -3 0.027 1

0.028 none 1/0.05 0.027 1

0.028 none 1/0.05

. Radiation Test Burst

-I 1.218 15.4 0.80 54 5

2.7 0.50 5/1.0 Burst

-2 1.'i22 10.6 1.8 86 5

2.7 0.500 6/2.0 Born

-3

'1.460 7.5 3.9 130 6

5.40 0.250 7/5.0 qurst

-4 1.615-5.6 7.5 188 8

9.00 0.150 8/10 Burst 5 1.910 3.8 17 300 11 15.00 0.090' 9/20

, Burst

-6 2.692 2.05 67

.670 11 15.00 0.090 11/100 Burst

-7

.2.26 2.70 38 460 11 15.00 0.090 11/100 Note: All burst tests will be started from subcritical.

-4 2=

r1 r+

03 r+

"D CU 0 O M fD en ee a

t e

L 1

m.

.,a t-

    • I 1ABtf 6 INSTRUMfNIAII0td IDENiffirAIION. DAIA CIW4N[I RfC01:0!NG, AND DISPL AY REQIllREMirai left rim 8ER Call 8ttAil0N It u tasa Raqn iro,g a Strip Cheri Moasue <w nt Instrument locallon Itf+ntifier Recording Ranoes Fr3 uency Response O_lsplay (Parlo.1) i L o:41 14 -el.em h luu. SP N0 0.47m, 2700 f4EUI Flx 08 10-30-10*3 amp Normil an<f lilah Yes Coolant h assure PID IPI Dutlet SYS PRfS 70 TT 0-69 MPJ Normil and liigh Coolant r,"ssure PXO ipr Outlet SYS Pr as 11 11 0-17 MPa Normil an<t liigh Coul ant Insat Temp. TC Flra Shroud IN TtMP 01 Ambient-G E Normal Yes Inlet (rod) i' Co31ani Irav Rise IC Pale Firw Shrou.f DCL TEMP 01 0-10K Normal Yas Inlet on.1 Outlet

' Coolsni e i+ Rate Turbine Flw Shrourt FI OWRAT E 01 0-1.0 I/s r:ormal Yas Fltwaeter Inlet (ro.1) l' ki Coslant M Hulput.

Firunatar Flew Shroud FLOW RATE 01 0-?000 ift fligh 4

m Pickup Coll Inlet PUL5E

'I t.oolant a le......a t e fushine flow ShiouI ILoultAIE 01 0-1 0 1/s tiormal les flowmeter inlet (% pare) f Poner lon Chamber Plint

.REAC POW 0-30 ru llich yes g

14MS-3 30 ta'iS3P1 b

Poer Ion Chamber P14nt REAC POW 0-30 mi filoh Yes tJMS-4 10 tetS4PT l

g Poer Ion Chan.her Plant REAC POW 0-10 GW *I8 liigh Yes PPS-1 20 KPS2PT y#

(<

]'

co r+

Poer lon Chambar Plant REAC POW 0-10 GW *b 6tigh Yes

',0 $

4 PPS-?

20 KPS?PT o :r 5k Po er lon Chsnher Plant RfAC POW 0-16 CW

  • liigh Yes a :s gg PPS-3

.ItwS3PT N"

os ui i

Poer line Chamber Plant ItfAC POW 0-16 (M

  • liigh 7M PPS-4

.lMPS4PT q

Poer ton Chamlear Plant HE R POW 0-100 GW

  • lilah g

IR-1.

.lMIRIPT ye, t'.

Poer Ice Chimber Plant RfAC POW 0-100 GW

  • iligh IR-2

. lf4 Tit?Pi y,,