o (. -o 8005070[pp March 5,1980 Mr. R. E. Tiller, Director Reactor Operations and Programs Division Idaho Operations Office - DOE Idaho Falls, 10 83401 PBF CHAMBER CALIBRATION EXPERIMENT OPERATING SPECIFICATION - HJZ-74-80
Dear Mr. Tiller:
Transmitted for your information are three (3) copies of the Experiment Operating Specification for the PBF Chamber Calibration Test and a evision (DRR-TFBP-236).
Very truly yours, h
H. J. Zeile, Mana er c
Thermal Fuels Behavior Program jh Attachments:
As stated cc:
R. W. Barber, 00E - 2 W. V. Johnston, NRC - 2 R. W. Kiehn, EG&G Idaho, w/o attach 91 bec:
TFBP Prograw 5tandard M. M. Andreason S. R. Gossmann T. K. Samuels7c X. M. Spencer l
L. A. Stephan Central File H. J. Zeile - File
- e s.Aa w
,m..
k
f
@OPED.NO.
Zy,,,'S"
DOCUMENT REVISION REQUEST
,,aE C,
@ REGUESTER
@ ORR DATE
@ CAR NO.
L. A. Stephan TFBP-236 U.]"EN g IQlCABLE) power Burst N EU ff/ Chamber Calibration 00CUMENT ISSUE 0 ATE 5
N 0
Experiment operating Specification February 1980 Q/ CHECX APPLICA8LE BLANK MANAG{R AP)ROVAL ATE PERMANENT CHANGE TEMPORARY CHANGE BULLETIN
@ PRINT OR TYPE PROPOSED CHANGE - NUMBER EACH CH ANGE SEOUENTIALLY IN IST COLUMN AND RECORD PAGE AND di P'OR PARAGRAP 9 FOR FOR EACH CHANGE.
WRi ER'S USE STEP OR INSTRUCTIONS. REWRITE PARAGRAPHfS) OR FOR EXTENS;VE CHANGES ATTACH REVISED COPY AND STATE " REVISE PER ITEM PAGE PARA.
ATTACHED COPY". FOR NEW DOCUMENT. ATTACH ROUGH 0 RAFT AND STA TE" PREPARE NEW (SP.00P. ETC.) PER ATTACHE 00R AFi".
1 4
6
' One turbine flowmeter located in the shroud lower extension to measure orifice flow rate.
2 6
table See attachment 1.
1.
3 12 table See attachment 2.
2.
4 17 table See attachment 3.
4.
5 20 table See. attachment 4.
5.
6 23 table See attachment 5.
6.
C USE CONUNUATION SHEET AS REQUIRED NEXT ANTICIPATED NEED FOR 00CUMENT WITH THIS REVISION INCCRPCRATED: DATE/ EVENT
@ JUSTIFICATION: ' REASON FOR CHANGE - NUMBER TO CCARESPONO TO ITEM NO. A80VE):
@ OTHER 00CUMENTADON AFFECTED:
Items 1, 2, 6 Recording of the flow rate through one of 00C. NO.
ORA NO.
DATE COMPLETED the spare flow meter orifices was added to allow measure-ment of flow to be recorded if the shroud finw meter fail s.
Item 3, a, 5 Another power burst was added (2.7ms -
460MJ).
@ ORIG lNATlNG ORA NO:
h REVIEW DATE!
f
@gEW JAME/ SIGNA,TURE,
CRG.
NAME/ SIGNATURE CRG.
DATE NAME/ SIGNATURE CRG.
DATE J////17/m 2970 J/34d l
l~
l OUAury civl
' k ddwL.czo
%Aro!
l lS>Ferrwl T
& &.4tal4-.s-N i
l ll PRAC l
@ COMVENTS.
@ w!T10NA A00 AEVISiCN r
@ DOCUMENT CONTROLLER
@ RELEASE DATE.
@ CAR CCMPLETED DATE:
(
e 4
@OPER.NO.
77,",l""
00CUMENT REVISION REQUEST
,,as c,
@ REQUESTER
@ ORR DATE
@ CRR NO.
t.. A. Stephan TFBP-236
@ 00CUMENT NO. (IF APPLICABLE) poWerBurstgg*fEf[fD/ChamberCalibration 00CWENT ISSUE DATE 0
EGG-TFBP-5094 Experiment operating Spec 1fication February 1980
(
CX APPUCABLE BLANK
- MANAG R app 0 VAL ATE PERMANENT CHANGE TEMPORARY CHANGE SULLETIN w
y
@ PRINT CR TYPE PROPOSED CHANGE - NUMBER EACH CHANGE SECUENTIALLY IN IST COLUMN AND RECORD PAGE AND P'CUARAGRAPH NUMBER
' @ FCR FOR EACH CHANGE.
WRITER'S USE STEP OR INSTRUCTIONS. REWAITE PARAGRAPWS) CR FOR EXTENSIVE CHANGES ATTACH REVISED CCPY AND STATE -REVISE PER ITEM PAGE PARA.
ATTACHED CCPY FOR NEW 00CUMENT. ATTACH RCUGH ORAFT AND STATE"PREPARENEW (SP.00P.ETC.) PER ATTACHED ORAFT".
1 4
6
' One turbine flowmeter located in the shroud lower extension to measure orifice flow rate.
2 6 table See attachment 1.
l.
3 12 table See attachment 2.
2.
4 17 table See attachment 3.
4.
5 20 table See. attachment 4.
5.
6 23 table See attachment 5.
6.
USE CONTINUATION SliEET AS REQUIRED NEXT ANTICPATED NEED FOR 00CUMENT WITH THIS REVISICN INCORPORATED CATE/ EVENT
@ JUST1FICATiON: TREASON FOR CHANGE - NUMBER TO CORRESPOND TO ITEM NO. ABOVE):
@ OTHER DOCUMENTATION AFFECTED:
Items 1, 2, 6 Recording of the fTow rate through one of c0C. NO.
ORA NO.
DATE COMPLETED the spare flow meter orifices was added to allow measure-ment of flow to be recorded if the shroud flow meter fail s.
Item 3, 4, 5 Another power burst was added (2.7ms -
460MJ).
@ ORIGINAUNG CAR NO:
REVIEW DATEf DATEf NAME/ SIGNATURE b
}AME/ SIGNA,TURE,,
ORG.
NAME/ SIGNATURE CRG.
CO CAG.
DATE
///A2 raw 2020 3/3h V
' u'u" *l hx ddw1..uz.o Weol l
I 5^'5" *l
&& 40AM4M I
l PRAC l
@ CC"MENTS:
ADDITIONAL D
EN REVISION h 00CUMENT CONTROLLER
@ RELEASE OATE
@ ORR COMPLETED DATE:
e
s TFBP-DRR-236 TABLE 1.
CHAMBER CALIBRATION INSTRUME;:T REQUIREMENTS Maximum Instrument Instrument Mea surement Instrument Location Rance Local Neutron SPND 0.47m, 2700 3x1017ny Flux Coolant Pressure Flow Shroud 0-69 MPa Pressure Transducer Outlet Cool ant Pressure Flow Shroud 0-17 MPa Pressure Transducer Outlet Coolant Inlet TC Flow Shroud Ambient - 630 K Temperature Inlet Ccolant Temo TC pair Flow Shroud 0-10 K Rise Inlet and Outlet Flcw AC Flowmeter Shroud 0-1100 cm3 s Output Pickoo Coil Inlet
~
/
Power Ion Chamber Plant 0-30 MW NMS3 Power Ion Chamber Plant 0-30 MW NMS4 Power Ion Chamber Plant 0 10GW* 1 PPS#1 Power Icn Chamber Plant 0-10GW*
PPSf2 Pcwer Ion Chamber Plant 015 GW+
PPS?3 Power Ion Chamber Plant 015 GW+
PPS#4 Power Ion Chamber Plant 0-100 GW*
TR-1 Pmver Ion Chamber Plant 0-100 GW*
TR-2 Power Ian Chamber Plant 0-100 GW*
EV-1 l
Flow Rate Turbine Flowneter 0-2.01/s Flowmeter-Orifice i
I
(
h
=-
TABLE 2.
(continued)
Lono T ime.
Anticipated Test inlet Shroud Loop Mode of Duration Reactor Power Temperature Flow Pressure Operation (as noted)
(is noted)
(K)
(l S)
(MPa)
Comments
/
.2.05 ms 2 hr 70 GW peak 538 0.035 6.45 Sixth chamber linearity power burst pcwer power burst.
2 hr 22 ro 538 0.085 6.45 Remove irradiated and install new complement of flux wiras.
30 m 7ero 538 0.035 6.45 Instrument status check, R;
zero power offset taken, 1
range changes.*
2.70 ms power 2 hr 38 GW peak 538 0.085 6.45 Seventh chamber linearity burst power burst 2 hr Zero 538 0.085 6.45 Remove irradiated and install new complement of flux wires 30 m Zero 538 0.085 6.45 Instrument status check, g y, zero power offset taken, ggg-range changes.*
7'g Ei 5teady poser 2 he
?? MW 538 0.085 F. 45 Steaav power relia t ic q l33 as m heatina affect tast.
83 n, 8 hr Loop cooldewn.
See Table 5 for TLS and amp'lifier-switch positions and ranges
r t
TABLE 4 tXPECTED SIGftALS Dif f erent ial Chamber Currents (Amperes at Max Power)
Teaperature Test
( o F)
NMS-3 NHS-4 PPS-1 PPS-2 PPS-3 PPS-4 TR-l TR-2
[V-1 EV-2 Strady Power 1.2 1.475x10-6 g,405,30-6 49,95,10-6 42.67x10-6 1.206:10-6 1.218:10-6 1.242x10-6 1.185x10-6 pg,gnto-6 37,5,10-6 15 MW Strady Power 10.0 2.065x10-6 3,%7,30-6 69,93 x10-6
$9,74,50-6 1.688x10-6 1.705 10-6 3,739,30-6 1.659x10-6 ao,74,30-6sa,s,go-6 21 MW StraJy Power 12.96 2.655x10-6 2.529:10-6 89,93,10-6 76.82x10-6 2.17x10-6 p,397,10-6 2.236 x10-6 2.133x10-6 52.38:10-667.sul0-6 27MW Burst M 2.66x10-3 2.27x10-3 0.064x10-3 0.065 10-3 0.066x10-3 0.063 x10-3 1.55x10-1 2.0x10-3 (0.8 Gw)
Burst #2 6.99x10-3 5.tx10-3 0.145 x10-3 0.146x10-3 0.149x10-3 0.142x15-1 3.49:10-3 4.5x10-3 (1.8 GW) grgtg 12.40x10-3 11.09:10-3 0.314x10-1 0.3166x10-3 0.323x10-3 o,303,30-3 7,57,30-3 g,75,go-1 Burst #4 24.97 x10-3 21.3410-3 0.603:10-3 0.609:10-3 0.621:10-3 0.593x10-3 14.65x10 3 18.7%x10-I (7.5 CW)
MN wn Burst #5 l.366x10-3 1.380x10-3 1.408:10-3 1,343,g0-1 32.98x10-1 42.50x10-3 7$
(17 GW)
C7
- o E3 Burst #6 6.796x10-3 5.53010-3 135.8:10-3 17s.0x10-1 7$
(70 GW) cn w Burst #7 3.146x10-3 3.002x10~3 73 1x10-3 95.0x10-(38 CW)
' ~
F I
1ABLE 5 BURST TESTS SEQUENCE AND PARAMETERS TEST Reactivity Reactor Peak
%rst TLS PPS Scram PPS Time Mplifier Insertion Period Power Energy Position level Scram Range (No.)
($)
(ms)
(GW)
(MJ)
(GW)
(sec)
Full Scale (GW)'
(?R-1, IR-2. EV-1 EV-2. PPS-1 2P,5-2)
P I
1 0.028 none 1/0.05 0.015 Calib. -1 I
_0.028 none I/0.05 0.021 Calib. -2 Calib. -3 0.027 1
0.028 none 1/0.05 0.027 1
0.028 none 1/0.05
. Radiation Test Burst
-I 1.218 15.4 0.80 54 5
2.7 0.50 5/1.0 Burst
-2 1.'i22 10.6 1.8 86 5
2.7 0.500 6/2.0 Born
-3
'1.460 7.5 3.9 130 6
5.40 0.250 7/5.0 qurst
-4 1.615-5.6 7.5 188 8
9.00 0.150 8/10 Burst 5 1.910 3.8 17 300 11 15.00 0.090' 9/20
, Burst
-6 2.692 2.05 67
.670 11 15.00 0.090 11/100 Burst
-7
.2.26 2.70 38 460 11 15.00 0.090 11/100 Note: All burst tests will be started from subcritical.
-4 2=
r1 r+
03 r+
"D CU 0 O M fD en ee a
t e
L 1
m.
.,a t-
- I 1ABtf 6 INSTRUMfNIAII0td IDENiffirAIION. DAIA CIW4N[I RfC01:0!NG, AND DISPL AY REQIllREMirai left rim 8ER Call 8ttAil0N It u tasa Raqn iro,g a Strip Cheri Moasue <w nt Instrument locallon Itf+ntifier Recording Ranoes Fr3 uency Response O_lsplay (Parlo.1) i L o:41 14 -el.em h luu. SP N0 0.47m, 2700 f4EUI Flx 08 10-30-10*3 amp Normil an<f lilah Yes Coolant h assure PID IPI Dutlet SYS PRfS 70 TT 0-69 MPJ Normil and liigh Coolant r,"ssure PXO ipr Outlet SYS Pr as 11 11 0-17 MPa Normil an<t liigh Coul ant Insat Temp. TC Flra Shroud IN TtMP 01 Ambient-G E Normal Yes Inlet (rod) i' Co31ani Irav Rise IC Pale Firw Shrou.f DCL TEMP 01 0-10K Normal Yas Inlet on.1 Outlet
' Coolsni e i+ Rate Turbine Flw Shrourt FI OWRAT E 01 0-1.0 I/s r:ormal Yas Fltwaeter Inlet (ro.1) l' ki Coslant M Hulput.
Firunatar Flew Shroud FLOW RATE 01 0-?000 ift fligh 4
m Pickup Coll Inlet PUL5E
'I t.oolant a le......a t e fushine flow ShiouI ILoultAIE 01 0-1 0 1/s tiormal les flowmeter inlet (% pare) f Poner lon Chamber Plint
.REAC POW 0-30 ru llich yes g
14MS-3 30 ta'iS3P1 b
Poer Ion Chamber P14nt REAC POW 0-30 mi filoh Yes tJMS-4 10 tetS4PT l
g Poer Ion Chan.her Plant REAC POW 0-10 GW *I8 liigh Yes PPS-1 20 KPS2PT y#
(<
]'
co r+
Poer lon Chambar Plant REAC POW 0-10 GW *b 6tigh Yes
',0 $
4 PPS-?
20 KPS?PT o :r 5k Po er lon Chsnher Plant RfAC POW 0-16 CW
- liigh Yes a :s gg PPS-3
.ItwS3PT N"
os ui i
Poer line Chamber Plant ItfAC POW 0-16 (M
- liigh 7M PPS-4
.lMPS4PT q
Poer ton Chamlear Plant HE R POW 0-100 GW
- lilah g
IR-1.
.lMIRIPT ye, t'.
Poer Ice Chimber Plant RfAC POW 0-100 GW
- iligh IR-2
. lf4 Tit?Pi y,,
j