ML19309G496
| ML19309G496 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 04/14/1980 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Scott S NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML19309G497 | List: |
| References | |
| RTR-NUREG-CR-0345, RTR-NUREG-CR-345, TASK-AS, TASK-BN-80-09, TASK-BN-80-9 BN--80-09, BN-80-9, NUDOCS 8005070048 | |
| Download: ML19309G496 (1) | |
Text
8 005070 0N yn nscug p.
jo '
UNITE.D STATES g
y g
NUCLEAR REGULATORY COMMISSION WASHINGT ON. D. C. 20555 7.* -
- , p APRIL 14 2
- ...+
Docket No. 50-344 MEliORANDUM FOR: Steve Scott Assistant to the Director Division of Technical Information and Document Control Office of Administration FROM:
Darrell G. Eisenhut, Acting Director Division of Operating Reactors Office of Nuclear Reactor Regulation
SUBJECT:
BOARD NOTIFICATION - TROJAN CONTROL BUILDING PROCEEDING Please provide the documents listed below to the Licensing Board and all parties and other persons on the service list for this proceeding:
1.
Memo, Varga to Scott dated 4-2-80 l
i 2.
Memo, Varga to All Boards dated 4-2-80 3.
Memo, Knight to Varga dated 3-3-80 with enclosure titled "NRR Staff Evaluation of MUREG/CR-0345" 4
NUREG/CR-0345, "An Evaluation of Seismic Qualification Tests fo-Nuclear Power Plaat Equipment" 5.
Memo, Mattson to Ru @ il fa'.ed 3-3-80 The methods of seismic testing of ellatrical equipment were discussed in the Phase I hearing (interim opption) by NRC staff witness V. Noonan i
(Tr. 2932-2943).
The impact of the report (item 4 above) is summarized in the-concluding paragraph of item 5 abovs.
l
- V)
W.]
Darrell-G. Ei enhut, Acting Director Division of Operating Reactors, NRR-
Enclosures:
As-Stated Above cc: w/ enclosures J., Gray i
C..Trammell K.' Herring.;
V. Noonan B. D. Liaw L. Nichols.
1 E. Christianbury
'S. Varga
~
L_