ML19309G439
| ML19309G439 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 04/30/1980 |
| From: | Dutton D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19309G440 | List: |
| References | |
| X7BG03-M6, X7BG3-M6, NUDOCS 8005060292 | |
| Download: ML19309G439 (2) | |
Text
__
8005060 292
~
S GeorDa Power Company i
Post Omco Box 4545 L
Atlants, Georgia 30302 Vogtle Project Telephone 404 522-6060 Southem Company Servces, Inc.
Post Offce Box 2625 Birmingham, Alabama 35202 Tew 205 87m April 30,1980 United States Nuclear Regulatory Commission File: X78G03-M6 Office of Inspection and Enforcement Log: GM-615 Region II - Suite 3100 101 Marietta Street, N.W.
Atlanta, GA 30303 Attention: Mr. James P. O'Reilly
Reference:
50-425; Erosion Under Unit 2 Cable Tunnel Gentlemen:
On March 10, 1980, it was reported to your office that a potential reportable item under 10CFR50.55e existed at Plant Vogtle concerning erosion under the Unit 2 cable tunnel. The repairs are now complete and Georgia Power Company is submitting the attached report concerning this incident.
The evaluation concludes that the erosion is a reportable deficiency and also represents a substantial safety hazard.
This response contains no proprietary information and may be placed in the NRC Public Document Rooms upon receipt.
ry truly a
Doug %uttonw%
D Project General Manager DED: JAB:gpu xc:, U.S. Nuclear Regulatory Comission l
Attn: Victor Stello, Jr., Director l
Office of Inspection and Enforcement
(
Washington, D. C. 20555 M. D. Hunt, NRC Region II fD/?
ss
/!/
I United States Nuclear Regulatory Commission Attn: Mr. James P. O'Reilly Page 2 April 30,1980 xc:
J. H. Miller, Jr.
W. E. Ehrensperger F. G. Mitchell, Jr.
R. J. Kelly C. F. Whitmer R. E. Conway D.. E. Dutton J. T. Beckham, Jr.
R. W. Staffa K. M. Gillespie L. T. Gucwa i
C. W. Miles, Jr.
E. D. Groover D. L. McCrary R. A. Thomas
- 0. Batum J. A. Bailey M. Z. Jeric
'o. L. Lex W
D