ML19309G433

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 80-013/03X-1
Date released: 11/19/2019 Download: ML19309G433


Updated LER 80-013/03X-1:on 800225,during Surveillance Test, Channel D Containment High Pressure Setpoint Less Conservative than Tech Specs.Caused by Failed Signal Isolator 1-E/E-5313D.Instrument Returned for Repair
ML19309G436
Person / Time
Site: Calvert Cliffs 
Issue date: 04/30/1980
From: Heibel R, Rizzo P
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19309G436 (2)
Forwards Updated LER 80-013/03X-1
ML19309G432
Person / Time
Site: Calvert Cliffs 
Issue date: 04/30/1980
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19309G432 (1)