ML19309G311

From kanterella
Jump to navigation Jump to search
Forwards Transcripts of Interviews Conducted on 790330 by Util w/TMI-2 Operators on Duty at Time of Accident
ML19309G311
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/07/1979
From: Trowbridge G
SHAW, PITTMAN, POTTS & TROWBRIDGE
To: Case E
Office of Nuclear Reactor Regulation
Shared Package
ML19309G312 List:
References
TASK-TF, TASK-TMR NUDOCS 8005050540
Download: ML19309G311 (1)


Text

.[^[i 80 OTO 5 0 g O

W~

<G bn

,T ghh S H AW, PITTM AN, PoTTs & TROWBRIDGE 18 0 0 M ST R C r.T, N. W.

'b k I'*"fh CN WAS HINGTO N, D. C. 2 0 0 3 6 l*

"';f'.,t'20.N

'lil'no"'C'"

h%

O E C A G C F.

  • mow enipo g somm thoth ali,c".T.. >CL. ;.r"w,*s,.

i'fJ."a";."Co'J "

' n '

  • o "' ' "

C J....... u N

..................T.o

" c'C :!;". ".' ".'.."...

Ct'."J.*e.*m'!"

* *;."
.";:~o'tC'.",U "

"ff '"1."; "ft."O,'

Tuc=

t.'.*t!,t i".'* "&

" * ' ' " ^ ~ ' ' " * * " '

"'C '^1,il",'ll.i'f;*

RIC> aa c J. e EN C ALL J C w N M. O'N t e LL. J a.

CA B L E S m AwkAw'

.s a.v..C S L B l e G..

T,,

J. a?..A E P S TIE N

....e

.. uNo.C-o G C C # 3 C w. a L k t N..a.

G ECRQ t D. C ACwLEY..N.

was, g#a CFCao mEvNC.Os MsCumEL O.mavs JOMN M. SM ARON

'a"'"*"'"*"^"a

~.n..t.-34

",i"a"e."tf.o".". '*"

T N, u

... J a.

.T.

.N

. loc..

Co N.cL MAA4 AWQ Eh S LBCE M AND L ALLC 88 E AN E ST 6 S LAn t. JR.

ALAN J. w CIS S ARD Ca#6ETC N S JC=gg weLuam p. same TnC= a s a. sanTre ALAN A. To S PEM

. A se C S as, s wamee

    • ,se N L C AR A. J 4 Jo SmR DC*eJ.*tstEL u r J. ** ANv t ?

. t"p t s ?as C as a s Lg h n a m?

aae a. es.CJLLouGet A AT b meCMM AN s

May 7, 1979-Mr. Edson G.

Case Deputy Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Ed:

I am enclosing transcripts of interviews conducted by Metropolitan Edison with the TMI-2 operators on duty at the time of initiation of the TMI-2 accident.

The interviews were con-ducted on March 30, 1979, two days after the accident.

The transcripts were prepared from tapes of the interviews and have been reviewed by the interviewees.

The interviewees were first given the opportunity to review the initial transcripts of the tapes and to fill in garbled portions of the tapes and to clean up some of the language employed.

They were then offered a final opportunity to review the product.

It is my understanding that this review process did not involve substantive changes in the taped remarks.

Copies of the original tapes have been supplied to the NRC investigative team.

Sincerel i

i Geor e F. Trowbridge Enclosures s

f L.