ML19309G280

From kanterella
Jump to navigation Jump to search
Forwards Transcripts of Followon Interviews Conducted by Util W/Operators on Duty at Initiation of TMI-2 Accident
ML19309G280
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/08/1979
From: Trowbridge G
SHAW, PITTMAN, POTTS & TROWBRIDGE
To: Cornell E
NRC - NRC THREE MILE ISLAND TASK FORCE
Shared Package
ML19309G281 List:
References
TASK-TF, TASK-TMR NUDOCS 8005050505
Download: ML19309G280 (1)


Text

-

g e

q p

b d

8005050 70 [

SHAW, PITTMAN, PoTTs & TROWBRIDGE 180 0 M STR E ET, N. W.

WAS H I N GTO N, D. C. 20 036 s A M S AT D. POTT S STEVEN L. MELTIER 12021334 410 0 DE AN D. AUL8CR STE uART L. PETTM AN.Do E oEORGE F. TROweR JOMN ENGEL ST E PM E N D. POTTS STEPHEN m. MuTTLER T E LECOPt E R aERALD CHANNorr wiNT MROP N. BROWN PM*Lup D. eOSTwsC R JAMESa.HAMLaN seOa3 ase.Oees & ree-s7s0 R. TiMoTMT MANLON ROeERT E.2 AMTER GE ORGE M. ROGE RS, JR.

RICM AND C. G ALEN JOMN S. RMINE L ANDER ROBERT S. RosesNS IELER ERUCE w. C MuRCMILL LauR A R. F ARR AND

    • -=**>'*MA*'A****>

te'.V,',*,'D.".'ta

",,,i l""E Mn

C CABLE SMAWLAW*

ReCH ARD J. S E NDALL JOH N M. O'N E G LL, J R.

JAT E. SgtgE RG J AT A. E PST8EN E ARW AR A M. ROS SOTTs F R AN E L8N D. CMu G EORGE v. AL LE N. JR.

GEORGE D. CRowLET, JR.

JOHNM.SMANON WM GR ADFORD RETNOLDS McCMAE L D. M ATS F RE D A. LeTTL g THOM AS M. McCORMICR EDWARO g. CROSLAND FRED DR ASNER sus AN 4 F ALn SON COUNSEL N ATM ANIEL M 3RE E D JR.

STEVEN M. LuCAS M Amst AuGE NGLBCE R AND L. ALLE N E RN E ST L. 9t Am E. JR.

AL AN J. w CIS m ARD C ARLETON S. JONE S WILLIAM P. S ARE J AM E S M.

e A nT E R JOMN L. C ARR. JR.

June 8, 1979 TMOMASA AL AN R. TuSPEM URGER SM E LDON J. WEOSEL PHILIP J. M ARVET JOMN A. McCULLOuG H R AT L. RfCMM AN JAME S THOMAS LENMART Mr. E.

Kevin Cornell Interim Director NRC/TMI Special Inquiry Group Mail Stop AR-400 U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Kevin:

Per our recent telephone conversation, it is my under-standing that you have already received from Ed Case the transcripts of interviews conducted by Metropolitan Edison with eight TMI 2 operators on duty at the time of initiation of the TMI 2 accident.

I am enclosing a total of ten follow-on employee interviews conducted by Metropolitan Edison during the period April 6, 1979 through May 4, 1979.

Sincerely, e

i George F. Trowbridge l

GFT/rf Enclosures l

v.

..