ML19309G105

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Repts 50-282/80-01 & 50-306/80-01.Corrective Actions:Revised Section Work Instruction SWI-0-10,requiring Values,Numbers & Papermeters Not Applicable for Designation
ML19309G105
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/24/1980
From: Gilberts D
NORTHERN STATES POWER CO.
To: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19309G103 List:
References
NUDOCS 8005020366
Download: ML19309G105 (1)


Text

_

e U

8006020366 NSP NORTHERN STATES P3WER COMPANY M I N N E A PO LI S. M I N N E S OTA 55409 March 24, 1980 Mr. R. F. Heishman, Chief Reactor Operations and Nuclear Support Branch Region III, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Heishman:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 and 50-306 In response to your letter of March 3,1980, which transmitted Inspection Reports No. 50-282/80-01 and 50-306/80-01, the following is offered:

The event which resulted in the infractions was discussed with members of your office on February 26, 1980.

Corrective Actions taken are as described in the Inspection Reports and the Licensee Event Report for RO 80-1.

Cor-rective Actions were:

1.

Revision to the section work instruction SWI-0-10, Use of the Operations Manual, dated January 8.

The revision requires that for procedures that are applicable to either unit, the valve and numbers and para-meters that are not applicable to the unit on which the procedure is to be performed shall be designated by drawing a line through them.

2.

Revision to SWI-0-3, Safeguards Hold Cards and Component Blocking or Locking, dated January 7, 1980.

The revision requires that installa-tion and removal of Safeguards Hold Tags shall be logged and that any removed lock or block and its safeguards hold tag shall be delivered to the Shift Supervisor immediately.

3.

The event and its significance were discussed with the. individuals involved.

It is felt full compliance has been achieved at this time.

l Yours truly, D. E. Gilberts Vice President Power Production DEG:nk cc:

Mr. G. Charnoff IfR 1 bb0