ML19309G060

From kanterella
Jump to navigation Jump to search
Updates Re Valve Qualification Program.Requests Extension Until 810131 for Submittal of Results Due to Increase in Scope of Qualification Effort by Purge Valve Manufacturer
ML19309G060
Person / Time
Site: Crane 
Issue date: 04/30/1980
From: Herbein J
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
ILL-206, NUDOCS 8005020288
Download: ML19309G060 (1)


Text

8006020288 Metropolitan Edison Company Post Office Box 480

=

Middletown, Pennsylvania 17057 717 9444041 writer's Direct Dial Number April 30, 1980 TLL 206 Director of Nuclear Reactor Regulation Attn:

R. W. Reid, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Containment Purge This letter is in response to Mr. D. G. Eisenhut's letter of September 27, 1979, and revises our letter of November 20, 1979 (GQL 1440).

Mr. Eisenhut's letter requested Met-Ed to commit to a valve qualification program on an expedited baais. Per our letter of January 4,1979 (GQL 0007),

Met-Ed committed to a purge valve qualification program and submittal of the results by December 15, 1979. Therefore, Met-Ed considers that committment to adequately answer Mr. Eisenhut's letter.

Due to the recent meetings between our purge valve manufacturer and the Commission, which concluded with our purge valve manufacturer increasing the scope of the valve qualification effort, we are requesting an extension for submittal of these results of the qualification program until January 31, 1981.

Sincerely,

/

J. G. Herbein j

Vice President TMI-I JGH:LWH: hah cc:

J. T. Collius

\\

i l

Metropohtan Ec: son Company is a Memter of the General Pubhc Ut6 ties System