ML19309G021

From kanterella
Jump to navigation Jump to search
Discusses 800320 Meeting W/Westinghouse & NRC Re Control Rod Guide Tube Pin Cracking.Original Control Rod Guide Tube Support Pins Have Been Replaced Since Meeting
ML19309G021
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/28/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Rubenstein L
Office of Nuclear Reactor Regulation
References
NUDOCS 8005020215
Download: ML19309G021 (1)


Text

_ _ _ _ _

l

~I

- cII

- I 6 0 us 02 0 215 400 Chestnut Street Tower II April 28, 1980 L.

Director of Nuclear Reactor Regulation Attention:

Mr. L. S. Rubenstein, Acting Chief Light Water Reactors Branch No. 4 Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Rubenstein:

In the Matter of the Application of

)

Docket No. 50-327 Tennessee Valley Authority

)

TVA and Westinghouse met with the NRC staff on March 20, 1980, to discuss the subject of control rod guide tube support pin cracking.

A summary of the Westinghouse presentation, including the recom-mended resolution, was transmitted to S. S. Pawlicki of the NRC staff by T. M. Anderson on April 23, 1930, in Westinghouse letter NS-TM-2235.

Since the March 20, 1980, meeting, TVA has replaced the original control rod guide tube support pins at Sequoyah Nuclear Plant unit 1 with the new pins described in the Westinghouse letter. The new pins were manu-factured using heat treatment processes that provide extra:aely low susceptibility to stress corrosion cracking. The installation of the new pins eliminates the potential for guide tube misalignment and con-comitant restriction of control rod movement.

Very truly yours, TENNESSEE VALLEY AUTHORITY

,b n. / ' } On 3l' aC5 S

L. M. Mills, Manager Nuclear Regulation and Safety

\\