REC E51 FOR f ROCUREMENT RFPA NO. RES-77-127 a
~
MAY 0 2199 80000 52 MEMORANDUM T0:
Director, Division of Contracts Division TROM:
Director,76fR N of Reactor Safety Research (This form Ys designed to accommodate varying kinds of procurement requests, including small purchases', sole source actions and compet,itive solicitations.
~
Inapplicable items or those for which you have not developed information should be left blank.
In such cases, project officer should contact Division of Contracts personnel for aopropriate cuidance.) -
Part I - Project Data 1.
It is requested that the Division of Contracts take the following action:
/_f Issue a Request for Proposal
/1/
Execute a Modification to Contract No. NRC-04-77-127 with Westinghouse t;ame of Person or Firm
/7/
Award a Sole Source Contract
/__/
Award a contract on basis of to our acceptance of an Name of Person or Firm Unsolicited Proposal 2.
The project is entitled, " FLECHT-SEASET l
3.
The estimated time required to perform the work is
_ years
~7[$-[s A-8/ YdfM months. through g
0BGh0 PREPARED BY: L. Sokolow
Director, Division' o'f Contrac't's 2
_ days af ter 4.
The expiration date for receipt of proposals is issuance of RFP.
5.
A preproposal confer ~ence is /
/ is not /
/ contemplated.
6.
/x/ No classified information is anticipated.
/ ~~~/
Classified information is anticipated.
See NRC Form 187, attache L. Thomoson The Technical Representative or Project Officer is:
7.
Name telephone number 427-4260 Total estimate $6,287,259 Oblig. to date 3,215,000 Part II, Funds Balance Due
$3,072,259 Total 1.
Estimated Cost: $6,287,259 Current FY Second FY
~
Funds Availability:
This certifies that funds in the amount of are available for obligation in the current budoet S for the subject work and/or that funds in the amount of 5 TBD have been included in next year's budget request for the work (if work is contemplated beyond this Fiscal Year).
, B&R Symbol 60191001 FIN No.
B6204 Part III - Duplication of Effort I certify that, based on inquiries made with other NRC offices, no 1.
unnecessary duplication of effort will result from the conduct of the subject work.
Attached are the certifications executed by each of the members of the l 2.
Contract Review Board in accordance with the instructions con
.93e
- m #
the memorandum of L. V. Gossick dated October 15, 1976.
-me dC 9
Director, Division of Contracts 3
yjY 0 2 379 ' -
Part IV - Attachments 1.
/_x/
Statement of Work (Attachment No. _ l
)
and technical justification
/_/
Ev'a'luation criteria and their numerical weights (Attachment No.
)
/_/
List of finns to be invited to subtr.it proposals in addition to general public notification (Attachment No.
)
/__/
Copy of letter designating Source Evaluation Panel members (Attachment No.
)
/_/
Sole Source Justification, if applicatie.
(Attachment No.
)
/_/
Unselicited Proposal Justification, if applicable.
Approval and exe:ution of a' contract with on Name of Proposer the basis of an unsolicited proposal is recomended.
(AttachmentNo.'
)
/_/
Contract Review Board Certifications (Attachment No.
)
/_/
Special Requirements *
(Attachment No.
)
II i
l Signature of Office Director (Designating Off.icial)
Thomas E. Murleyr-Director Division of Reactor Safety Research
- This pertains to instructions concerning schedules, reports, data, Government-furnished equipment, or other special requirements.
l
'D**
m r
M i
lJ
WORKSCOPE AND JUSTIFICATION
~
References :
(1) B. C. Rusche letter to S. Levine, " Extension of the PWR FLECHT Program," February 9,1977 (2) H. W. Massie (W) letter to K. H. Sun (EPRI) and E. H. Davidson (NRC), "FLECHT SEASET Program; Revised Overall Program Costs and Schedule,"
March 2, 1979 The original FLECHT SEASET workscope was defined in response to the requests of Reference (1) and a cooperative agreement was signed between NRC, Westinghouse and EPRI in the fourth quarter of FY 1977.
The currently proposed workscope and the cost changes relative to the original contract are detailed in Reference (2). The primary workscope changes involve use of a 21 rod bundle for investigation of flow blockage effects rather than of a single tube for those studies.
The alternate ECC portion of the system effects tests was also deleted.
The seven task workscope then becomes:
Task 3.2.1 Unblocked Bundle, Forced and Gravity Reflood (161 rods)
Task 3.2.2 21 Rod Blocked Bundle Heat Transfer Task 3.2.3 161 Rod Blocked Bundle Heat Transfer Task 3.2.4 Spacer Grid Effects Task 3.2.5 Upper Plenum Separate Effects Task 3.2.6 Steam Generator Separate Effects f
Task 3.2.7 System Effects 1
I
- = = -.
.. ~~
Workscope r
These experiments will provide important data on ECCS effectiveness.
The program will provide non-proprietary data and analyses for the reflood 'b'ehavior of 17 x 17 fuel rod simulators which will supplement the currently available 15 x 15 data.
Tests will be conducted both i
with and without flow bicekage and with various blockage geometries.
In some tests the core simulator will be combined with scaled loop components including a downcomer, upper plenum and steam generator.
Separate effects studies of grid spacer effects and upper plenum, and steam generator behavior will also be undertaken.
Justification
References:
(1) E. H. Davidson (NRC) letter to H. Fix (W) and K. H. Sun (EPRI), January 15, 1970 (2) G. M. Holahan (NRC) letter to R. Mattson, R. Tedesco and Z. Rosztoczy, " Flow Blockage Tests in the Japanese Slab Core Facility," March 28, 1979 A presentation of the FLECHT SEASET flow blockage testing strategy was given to NRC management on October 25, 1978.
At that time NRR staff and the NRC/EPRI/W Program Management Group (PMG) supported
~
replacement of the single tube blockage tests by 21 rod blockage tests.
As a result of the information presented by Westinghouse on October 25, 1978, additional endorsement for replacement of the l
?
f
b
Justification x by the 21 rod bundle task was obtained from RES single tube i in the form of concurrences for Reference (1).
h Both small' and large blocked bundles are needed to separate the Blockage can improve heat effects of geometry and of flow bypass.
transfer by causing flow acceleration, and it can reduce heat transfer It is not clear how these opposite effects by causing flow bypass.
offset one another over the range of possible geometry and thermal Peak cladding temperatures may increase or hydraulic conditions.
may decrease due to blockage effects.
The heat transfer coefficient in a blocked assembly is expected to be a product of the unblocked bundle heat transfer, a blockage effect term (to be obtained from the 21 rod tests), and a flow bypass effect The cost of term (to be obtained mainly in the 161 rod tests).
determining the blockage effect term can be minimized by employing a number of geometries in the small (21 rod) bundle rather than in the A number of geometries are necessary since several large bundle.
blockage shapes and distributions have been observed in burst tests.
Flow blockage tests in the Japanese 2000 Rod Slab Core Test Facility may supplement FLECHT SEASET by providing additional information o However, the limited Japanese t'esting two dimensional flow effects.
program will r.ot be sufficient to replace the FLECHT SEASET program in the opinion of both the PNG and of NRR staff (Reference 2, fo m* -+
e
4-Justification Additional justifications for performing the complete program at Westinghouse under a modification of the current contract are:
1.
The basic facility already exists and is not available elsewhere; 2.
Experienced personnel are on hand who are familiar with the planning and management, facility operation and the specialized data gathering and reduction equipment; 3.
Nearly sixty percent of the cost of the progrim is barne by EPRI and Westinghouse; and 4.
This alternative is the most rapid way to generate the required information.
Other courses will dalay the program for several years until testing capability could be developed elsewhere.
e
{
NRC/EPRI/W CONTRACT FUNDING
($N)
TASK TITLE ORIGINAL EST REVISED EST A
NRC SHARE (NEW)_
NRC SHARE (TOTAL) 3.2.1 Unblocked Bundle
$ 1.6
$ 2.2
$ 0.6
$ 0.3
$ 0.9 3.2.2 21-Rod Blocked Bundle 0.8 3.2 2.4 1.0 1.4 3.2.3 161-Rod Blocked Bundle 2.7 3.5 0.8 0.3 1.5 3.2.6 Steam Generator Separate 1.4 2.0 0.6 0.2 0.8 Effects Tests 3.2.7 System Effects Tests 4.4 3.1 (1.3)
(0.5) 1.3 0.4 Other Tasks 1.0 1.0 n--
_.n..
TOTAL
$11.9
$15.0
$ 3.1
$ 1.3
$ 6.3 Total Est. Cost:
$ 6.3 Obligated to Date:
3.2 Balance Due:
$ 3.1 Note:
Balance Due does not include any provisions for annual overhead rate adjustments
ee j
OU. 9. SOVERNME3tT PRINT 3333 OP9tCE ; it73 3p9 i
L..ss s
<.'ow,b,.sr: eavv:
s-s ~.. %
n."
- W' ' ?.. '
r,,g_,----og,---------~~
j t
a.SECY-79-370 ADM
-- / 7_9 6/6/79 2757 6/4 tra o
. oar ov-ea DANIEL J. DONOGHUE STAFF PAPER
., To oa *G CC OT*t a X
THE COMMISSIONERS actea ' m ^av 0
co cuaas ci O
O mo.ct. ween.av El co -e 1 C LAS5**
8051 Op p ect peLE Coot U
04/Y) 00(%lf)CfT \\~bb1}L Y(W ana no OE& Cart 80se taeus, se Lauenessess afsta ED Yd DATE h) aECEdvtD v DATE COMMISSIONER ACTION PROPOSED MODIFICATION OF TRI-LEVINE 6/8 PARTY CONTRACT NO. NRC-04-77-12 7, WESTINGHOUSE ELECTRIC CORPORATION /
j' Et!M".TRIC POWER RESEARCH INSTITU TE/
-NUCLEAR REGULATORY COMMISCION CY: BUDNITZ SCROGGINS
~RPPA NO. RES-77-127, DATED 5/2/ 79
_WITH A
SUMMARY
OF THE REVISED WORKSCOPE AND A JUSTIFICATION TONG m.c_n; - "'
SERKIZ HAYES SOKOLOW
[7ILE u s =veu.a accutaroa, co
.ssio r oa1,;,",c-n a d
I r
i i hl 6
s k-e Ik P
['
1
( I.
=.
-