Part 21 Rept Re Control Rod Guide Tube Support Pin Cracking Due to Possible Stress Corrosion Cracking.Broken Support Pin Could Prevent Proper Control Rod Operation
ML19309F746
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/27/1980
From: Crews E
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
References
REF-PT21-80-204-001 NUDOCS 8004300561
Download: ML19309F746 (5)


Text

"

C00480b % 1

. . SOhTH CAROLifut ELECTRIC a GAS COMPANY oost er r.c c .on ,..

CoLUMe:A,SourH CAROLINA 29288 E.H.Cm cws, J a.'

v.u.......,...c ..tue .

t . u . ... c.. .. . e,.**

March 27, 1980 '

L cQ O /-Od /

w

'Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 3100 Atlanta, GA 30303

Subject:

Virgil C. Summer Nuclear Station, Unit 1 Reportable Substantial Safety Hazard Control Rod Guide Tube Support Pin Cracking Nuclear Engineering File: 3.1051 ,

Dear Mr. O'Reilly:

On March 14, 19S0, Mr. Jack Skolds of NRC Region II was notified orally of a reportable substantial safety hazard.

On March 13, 1980, Westinghouse notified South Carolina Electric and Gas Company of a potential stress corrosion cracking problem of the control rod guide tube support pins supplied by Westinghouse for the V.

C. Summer plant.

If a control rod guide tube support pin broke during operation, it could prevent proper control rod operation and cause,a substantial safety hazard defined by 10CFR21. Under the South Carolina Electric and Gas Company program, we are reporting this as a significant deficiency under 10CFR50.55(e) . Detailed information is presented in Attachment 1.

Westinghouse plans to perform an ultrasonic inspection of the support pins in two or more operating domestic plants. Since corrective action will be based upon the results of the support pin inspection program and a Westinghouse on-going materials test program, this is an interim report on this item. A final report will be issued when the s

. results of these test programs are av ile 1e. If any questi ns arise, please let us know. '/ .

~

/

e ruly yours, E. H. Crews, Jr.

i BSM:rm Enclosure l

i e - _ . - ~ . . _ - - . . . . - - - - - . - - - . . -

Mr. James P. O'Reilly Page 2 March 27, 1980 CC: Division of Inspection and Enforcement Washington, DC Messrs: V. C. Summer H. T. Babb M. B. Whitaker, Jr.

O. S. Bradham D. R. Moore H. Radin .

A. A. Scith J. Skolds R. L. Whitney (W)

NPCF/Dixon File F

1 4,

a 4

a h

t n A+ ,=-ew Cyr =+ww, e v Q= m =*=q** e qe=+ a n- = m e >--w, .w

  • e c- . = 6 m ea e -

ATTACHMENT 1 10CFR21 - SUBSTANTIAL SAFETY HAZARD

1. Name and Address of Reporting Individual B. S. Mullinax South Carolina Electric and Gas Company

^

P. O. Box 764 Columbia, SC 29218

2. Identification of Basic Camponent Control Rod Guide Tube Support Pin as supplied by Westinghouse Electric Corporation
3. Identification of Firm Supplying Co=ponent Westinghouse Electric Corporation PWR Systems Division P. O. Box 355 Pittsburgh, PA 15230
4. Nature of Defect, Substantial Safety Hazard Created, and Evaluation

- In the 'ost recent support pin inspection at a foreign plant, stress corrosion cracking was observed in Westinghouse supplied support pin. If a support pin broke in operation, it could prevent proper control rod operation.

Laboratory testing, conducted as part of the investigation into the support pin cracking problem, indicates that susceptibility to stress corrosion cracking decreases with increasing solution heat treatment temperature. These tests have established that the. Westinghouse current manufacturing process, which utilizes a solution heat treatment at 2000 F, results in support pins which are highly resistant to stress corrosion cracking. The support pins which Westinghouse supplied f or the V. C. Summer Nuclear Station, Unit 1, were pins having solution heat treatment at temperatures less than 1800 .F. _

The potential impact on Upper Head Injection (UHI) plants and non-UHI plants ha,s been evaluated by Westinghouse.

Since the V. C. Summer Nuclear Station is a non-UHI plant, control rod operation is not jeopardized by a broken pin due to the small gap clearance between the.non-UHI. guide tube and the core plate. This was previously reported in Westinghouse letter NS-TMA-2099.

l l

l 9

. . .. . . . . . . . . , . w . , -. , , .

? .

In the unlikely event that a pin leaf should be broken of f, the broken leaf could represent a loose part, which can have some small potential for interfering vlth control rod movement. However, due ,

to the configuration of the internals, this is highly unlikely to occur. It should be noted that no broken leaves have ever been found in on-site inspections.

S. Date Information of Defect Was Obtained March 13, 1980

6. Number and Location of Defect There are ninety-six (96) support pins, two (2) per guide tube, in the V. C. Summer Nuclear Station. The support pins are bolted into the bottom plate of the lower guide tube to align the bottom of the control rod guide tube into the core plate at the top of the fuel assembly.
7. Corrective Action No action will be taken pending the results cf c prop k'estinghouse support pin inspection program. In the near tu*tre, bestinghouse plans to conduct ultrasonic inspActio' if auide tube support pins at two or more operating domestic pla , Further actions will be determined based on the results of this inspection program as well as the on-going Westinghouse materials test program.
8. Advice to Purchasers or Licensees None