ML19309F679

From kanterella
Jump to navigation Jump to search
Ile Examination Submittal Letter
ML19309F679
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/24/2019
From: Chuck Zoia
Exelon Generation Co
To:
NRC/RGN-III/DRS/OLB
Zoia C
Shared Package
ML17214A848 List:
References
Download: ML19309F679 (4)


Text

Exelon Generation.

LS-AA-117-1002 Revision 4 Page 1 of 1 LICENSING AND REGULATORY AFFAIRS CORRESPONDENCE CONCURRENCE FORM Station(s): Clinton Power Station Correspondence No.: U-604490 Subject/Document:

Submittal of Initial License Training Examination Document Prepared by: G. Sanders Location: ~

Extension: =x2=8:a.a0=3'----

Required Review and Disciplines Assigned by: --=G"--. =S=aa..:.nd=e=r=s__,/'""'P:.....:..:.;rinc.:....:....R=e""'g=u=la=to::..:.r.,_y-=E:..:..n:..:ig=in~e=ec:...r ____ _

Due Date: _T_B_D __ _

Type of Review Required:

(Reference LS-AA-117)

D Technical Verification Team Review X Individual or Series Review D No Technical Review Title Note: If the subject document falls within the scope of AD-AA-102, "Station Qualified Review," one of the reviewers must be a Station Qualified Reviewer.

Disciplines Required:

D Maintenance D Radiation Protection D Operations D Engineering - l&C D Rx Engineering D Design Engineering D Nuclear Fuels D Work Management D Chemistry X Training D Radwaste X Reg Assurance/ Licensing D Engr - Mech Systems D Programs Engineering D Engr - Elect Systems D Other:

Review Concurrence: Signature indicates that the individual has reviewed the subject document and concurs that the content is factual and accurate. Concurrence via e-mail shall be provided using the declaration provided in LS-AA-117.

Disci line Tony Jennings/

Training Training Thomas Dean /

Training Does this letter contain commitments? D Yes X No If yes, corporate or site commitment coordinator has been notified: ________ Date:

Required Reviews and Signatures (check as appropriate):

D Station Qualified Review Required: __________________ Date:

0 PORC Approval Required: PORC Meeting No. -------------

D Corporate Licensing Concurrence Required:

~

Date:

X Site Regulatory Assurance Concurrence Required~+~~'""~""'b

........ ________ Date: ~,{ ~/,tj D Station Manager Approval Required: _________________ Date: ___ _

X Site Vice President Approval Required: --~~~~~::::;...,;~GE~;..~L-. __ Date: (;/$"'~,

SRRS Record ID: 5A.113 (Destroy at Option (DAO))

Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604490 June 5, 2019 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 21 O Lisle, IL 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Exelon Generation©

Subject:

Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials, which Clinton Power Station (CPS) is submitting in support of the initial license exam scheduled for the weeks of 09/09/19 through 09/20/19, at CPS.

This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.

These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. Please note that reference materials are attached to each individual examination question or item.

As of the 150 day submittal, modifications have been made to the Integrated Examination Outlines with regards to Scenarios 2 and 3 to improve content and ensure critical task validity. These changes improve examination quality and are in compliance with NUREG-1021, Revision 11, "Operator Licensing Examination Standards for Power Reactors."

Some modifications or adjustments to the examination material may be required due to procedural changes.

In accordance with NUREG-1021, Revision 11, Section ES-201, please ensure that these materials are withheld from public disclosure until after the examinations are complete.

U.S. Nuclear Regulatory Commission U-604490 Page 2 of 2 There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter please contact Mr. Thomas Dean, Director Site Training at (217) 937-4000. For questions concerning examination materials please contact Mr. Tony Jennings, Senior Training Instructor, at (217) 937-3930.

Respectfully, Theodore R. Stoner Site Vice President Clinton Power Station

Enclosures:

(Hand delivered to Charles Zoia, NRG Region Ill Chief Examiner)

RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Integrated Plant Operation Scenario Guides Completed Checklists:

Operating Test Quality Checklist (Form ES-301-3)

Simulator Scenario Quality Checklist (Form ES-301-4)

Transient and Event Checklist (Form ES-301-5)

Competencies Checklist (Form ES-301-6)

Written Exam Quality Checklist (Form ES-401-6)

Examination Security Agreements (Form ES-201-3)

Record of Rejected K/As (Form ES-401-4) cc:

Chief, NRG Operator Licensing Branch (without Enclosures)

NRG Senior Resident Inspector - Clinton Power Station (without Enclosures)

NRG Project Manager, NRA - Clinton Power Station (without Enclosures)

NRG Document Control Desk (without Enclosures)

Bee: (without Enclosures)

Site Vice President - Clinton Station Regulatory Assurance Manager - Clinton Station Vice President - Licensing and Regulatory Affairs Director, Licensing - Cantera Manager, Licensing - Clinton Station Clinton Station Nuclear Licensing Administrator Exelon Document Control Desk Licensing (Hard Copy)

Exelon Document Control Desk Licensing (Electronic Copy)

Human Resources - Clinton Station Training Manager - Clinton Station