8004800-
,fv3 7590-01
(~n)
- UNITED STATES NUCLEAR REGULATORY C0!'J41SSION DOCKET NO. 50-334 DUQUESNE LIGHT COMPANY vHIO EDISON COMPANY PEN!!SYLVANIA POWER COMPANY NOTICE OF GRANTING OF RELIEF FROM ASME SECTION XI INSERVICE INSPECTION REQUIREMENTS AND OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has granted relief from certain requirements of the ASME Code Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components and has issued Amendment No. 27 to Facility Operating License No. DPR-66 issued to Duquesne Light Company, Ohio Edison Company, and Pennsylvania Power Company (the licensees), which revised Technical Specifications for r
operation of the Beaver Valley Power Station, Unit No.1 (the' facility) located in Beaver County, Pennsylvania. The relief and associated amend-ment are effective as of 4
l The licensees are relieved from performing visual and surface or volumetric inservice inspections (ISI) examination of-the cladding on the-reactor vessel head, and visual examination of the cladding ~ in the pressurizer in the steam generators because other examinations have been found to be suitable alternatives.
The amendment is administrative in nature and simply deletes all i
references to Table ~4.4-4. ' The ISI requirements formerly covered by' that table ore 1now provided'for-in the llRC approved facility ISI-program as
.aniended with the exception of the Notation to Table-4.4-4.which is now included in. Technical Specification 3/4 4.10.
E W
~7590-01 The request for' relief and the application for the amendment comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.
The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the letter granting relief and in the license amendment.
Prior public notice of this action was not required since neither the relief nor the amendment involves a significant hazards consideration.
The Comaission has determined that the granting of this relief and the
- suance of this amendment will not result in any significant environmental-upact and that pursuant to 10 CFR 51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this action.
For further details with respect to this action, see (1) the-licensee's -
request for relief and application for amendment dated February 15, 1930 as supple-
. ented February 21,1980,(2) the Coranission's letter dated April 7,1980, (3) Amendment No. 27 to License No. DPR-66 and (4) the Commission's' related Safety Evaluation.
All of these items are available for public inspection at the Corxnission's Public Document Room,1717 H Street, N.W., Washington, D.C.'and at
'he B. F. Jones Memorial Library, 663 Franklin Avenue, Aliquippa, Pennsylvania
'15001.- A copy' of. items (2), (3) and (4). may be obtained upon request ~ addressed
~
". the -U. S. Nuplear Regulatory Cormaission, Washington, D.C.
20555, fe.tention:
ecctor, Division of 0perating Reactors.
1 e
s i-
.I.
1
.n
s,.
~
7590-01 a
Dated at Bethesda, Maryland, this 7th day of April,1980.-
1 FOR THE NUCL$AP, REGULATORY C0KilSSION
,A. Schwencer,-Chief..