IE Insp Repts 50-566/80-03 & 50-567/80-03 on 800205-08. Noncompliance Noted:Failure to Establish Adequate Measures to Control Radiographic Exam Procedures for Welds
ML19309F594
Person / Time
Site: Yellow Creek  Tennessee Valley Authority icon.png
Issue date: 02/27/1980
From: Herdt A, Kleinsorge W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19309F585 List:
References
50-566-80-03, 50-566-80-3, 50-567-80-03, 50-567-80-3, NUDOCS 8004300108
Download: ML19309F594 (8)


See also: IR 05000566/1980003

Text

04800

/d?

80

.

  1. Ftrog

&

4

UNITED STATES

8

),

NUCLEAR REGULATORY COMMISSION

e

,a

REGION 11

o,

101 MARIETTA ST., N.W.. SUITE 3100

o

ATLANTA, GEORGIA 303o3

.....

1

Report Nos. 50-566/80-03 and 50-567/80-03

Licensee: Tennessee Valley Authority

500A Chestnut Street

Chattanooga, TN 37401

Facility Name: Yellow Creek Nuclear Plant

Docket Nos. 50-566 and 50-567

License Nos. CPPR-172 and CPPR-173

,

i

Inspection

Y1

~e75ite near Iuka, Mississippi

y

{

/

W -#[

Inspector:

,

N. ii. )fle'insorge

Date Signed

~

Accompanying Pers nne),.

J. L. Coley (Training)

Approved by:

,@

,47 h /ffo

A./R Herdt, Section Chief, RCES Branch

Date Signed

/

l

SUMMARY

i

Inspection on February 5-8, 1980

Areas Inspected

This routine, unannounced inspection involved 48 inspector-hours on site in the

areas of nondestructive examination, steel structures and supports witcin the

containment - observation of welding activities, weld heat treatment, we? der

qua.ification, and review of QA Manual.

Results

.

-

Of the three areas inspected, n. items of noncompliance or deviations were

identified in two areas; one item of noncompliance was found in one area

[ Infraction - Failure to establish adequate measures to control Radiography -

Paragraph 5b(2)(a)].

i

I

. .

- -

. -

- - .

-.

. __--_ -____-

.

.

DETAILS

1.

Persons Contacted

Licensee Employees

M. M. Price, Project Manager

  • J. N. Holladay, QA Staff
  • L. S. Cox, Construction Engineer

'

  • C. G. Wages, Asst. Construction Engineer - QC
  • S. P. Watson, ES - DCU
  • L.

C. Marshall, PE - Mech.

  • S. A. Blount, ES - TS
  • M. F. Steakley, Supervisor Welding QC Unit

,

Other licensee employees contacted included 2 technicians, 2 security force

members, and 3 office personnel.

Other Organizations

Chicago Bridge & Iron (CB&I)

C. L. Spears, Jr.

- Project Welding and QA Superintendent

L. S. Savage, QA Technician

  • Attended exit interview

2.

Exit Interview

The inspection scope and findings were summarized on February 8, 1980 with

those persons indicated in paragraph 1 above. The inspector identified the

areas inspected and discussed the item of noncompliance. No dissenting

comments were received from the licensee.

3.

Licensee Action on Previous Inspection Findings

'

(Closed) Infraction 566-567/79-17-01, " Failure to Perform Proper Chemical

Analysis on Submerged Arc Welding Materials". TVA letter of response dated

December 21, 1979 has been reviewed and determined to be acceptable by

Region II. The inspector held discussions with the licensee and examined

the corrective actions as stated in the letter of response. The inspector

concluded that TVA had determined the full extent of the subject noncompli-

ance, performed and developed the necessary corrective actions to preclude

recurrence of similar circumstances. The corrective actions identified in

the letter of response have been implemented.

....

I

.

-2-

.

4.

Unresolved Items

Unresolved items were not identified during this inspection.

5.

Independent Inspection Effort

The following areas of interest were examined by the inspector:

a.

The inspector conducted a general inspection of the TVA fabrication

shop, CB&I subassembly area, reactor building sites (units 1 and 2)

CBLI and TVA weld material issue stations and CB&I radiographic labor-

atory to observe construction progress and such activities as welding,

saterial handling and control, housekeeping and storage.

b.

The steel containment structures are being fabricated by CB&I. The

applicable code for this welding is the ASME B and PV Code, Section

III Subsection NE, 1974 edition with addenda through the Summer of

1976.

(1) The inspector reviewed CB&I procedure No. RT-2X Rev. 2, "100%

Radiographic Examination Procedure for Welds" for technical

content in the areas of type of material radiographed, material

thickness range, type of radiation source, film brand / type,

minimum source to film distance, blocking or masking technique,

type and thickness of screens, exposure conditions, material weld

surface condition, radiographic film processing requirements,

quality of radiographs, film density limits, use of densitometer,

method of identification, location markers, film location method-

ology, and use and selection of penetremeters.

(2) The inspector observed radiographic inspection in progress for

containment longitudinal butt-welds seam A2, assembly No. D5

increment 35 to 36 and 37 to 38 and reviewed the radiographs for

containment longitudinal butt-welded seam A2 assembly D2 and seam

Al assembly D2.

The above inspections were compared with the applicable procedure

<

in the areas of type of material, material surface condition,

material thickness', type of radiation source, film brand / type,

minimum source to film distance, type and thickness of screens,

exposure condition, radiographic film processing, quality of

radiographs, film density, use of densitometer, radiographic

identification, use of location markers, method of reducing and

testing for back scatter, selection and use of penetreeters, and

evaluation and disposition of radiographs.

(a) The inspector, on February 7,1980, noted penetrameters and

shims extending into and obscuring the area of interest (the

weld) on the final accepted radiographs for assembly D2,

Sean Al increments 0 to 1, 1 to 2, 37 to 38 and seam A2

.

e$$

  • $

[

i

-

-

-

-

.______

.

.

.

-3-

.

increments, I to 2, 8 to 9, 20 to 21 and 21 to 22.

The

licensee stated there were no additional radiographs of the

above intervals for evaluation of the obscured areas. ASME

B and PV code Section III paragraph X3334.4 requires that

penetremeters be placed adjacent to the weld seam, in addition

paragraph NE-5211 requires full radiography for the above

longitudinal butt-welded containment joints. Failure to

establish adequate measures to assure that special processes

,

including nondestructive testing be accomplished in accordance

'

-

with applicable codes is in non' compliance with 10 CFR 50,

Appendix B, criterion IX.

This is an infraction and is

assigned item Nos. 50-566/80-03-01 and 50-567/80-03-01 -

" Failure to Establish Adequate Measures to Control Radiography".

'

(3) The inspector observed magnetic particle inspection of temporary

attachment sites after removal on assembly B22 and compared those

inspections with the applicable procedure in the areas of examin-

ation by continuous method, particle color contrast, sufficient

overlap, pole spacing and results consistant with acceptance

criteria.

c.

The inspector observed activities at weld material issue stations to

determine adequacy of: weld material storage / segregation, oven

temperatures, issue records and return of unused weld material. The

inspector also observed work areas for uncontrolled weld material.

No items of noncompliance or deviations except as described in para-

graph 5b(2)(a) were identified.

6.

Steel Structures and Supports - Observation of Welding Activities within

the Containment (Unit 1)

The inspector observed in-process welding activities of containment struc-

tural field welds as described below to determine if applicable code and

procedure requirements were being met.

See paragraph 5 above for applicable

code.

a.

Welding

The following welds were examined in process to determine; work con-

ducted in accordance with traveler, welding procedures available;

!

!

l

.

. .

!

,,

. f ., ,,

.

.

,

-4-

.

welding technique and sequence; weld geometry, fit-up electrical

characteristics; equipment condition; voltmeters for automatic welding

calibrated:

Assembly

Seam

Process *

Eeld Type

D9

A2

ASAW

Containment Butt

D7

A2

ASAW

Containment Butt

A4

201A

SMAW

Containment Butt

B20

42A

SMAW

Containment Butt

'

D4

A2R1

SMAW

Containment Butt Repair

  • ASAW-Automatic Submerged Arc Welding, SMAW-Shielded Metal Arc Welding

b.

Weld Heat I at

.

The welds listed in paragraph 6a above were examined in process rela-

tive to weld joint preheating to determine; procedures available;

procedures specify acceptable preheating method; procedures provide

,

'

monitering and recording requirements and procedure compliance.

1

c.

Welder Qualification

The inspector reviewed the CB&I program for qualification of welders

and welding operators for compliance with QA procedures and ASME code

,

requirements.

1

(1) The following welders and welding operators qualification status

'

records and " Records of Performance Qualification Test" were

reviewed relative to the weld joints listed in paragraph 6a

above: WCW, RAM, LEA, JEG, and WLS.

(2) The below listed radiographs of production automatic submerged

arc welds used to quality the below listed welding operator were

reviewed;

Welder

Assembly No.

Seam No.

Increment No.

Symbol

.-

B8

A1

0 to 3

WLS

B1

A1

0 to 3

JEG

Within the areas inspected no items of noncompliance or deviations'

were identified.

7.

Review of QA Manual - Welding Activities

The "0EDC Quality Assurance Program Requirements Manual for Design Procure-

ment and Construction" (PRM) references requirements and committments. The

" Quality Assurance Program Manual" (QAP) and " Quality Assurance Program

Procedures" (QAPP) defines the QA program, defines requirements and requires

l

l

  • .w*

,

1

,

.

om

(

- . -

. _ .

,

F

.

.

-5-

.

that programs be established to control specified elements. The "Construc-

tion Engineering Manual" (CEP) expends and implements the QAP's and QAPP's

for construction site use.

The following documents control Quality Requirements:

a.

QAPP 3, Rev. 1, " Design Control"

QAPP 4, Rev. 1, " Procurement Document Control"

'

QAPP 7, Rev. 2, " Control of Purchased Material, Equipment and Services"

QAPP 8, Rev. O, " Identification and Control of Materials, Parts and

Components"

.

CEP 4.01, Rev. 9, " Procurement Document Control"

CEP 7.02, Rev. 5, " Receiving Inspection"

CEP 3.01, Rev. 2, " Identification and Marking of Materials, Parts and

Components"

CEP 17.01, Rev. 2, " Quality Assurance Records"

b.

The following documents control work and quality inspection procedures:

QAPP 5, Rev. 1. " Instructions, Procedures and Drawings"

CEP 5.01, Rev. 7, " Construction Engineering Procedures:

Quality

Control Instructions; and Receiving Inspection, Storage, and Preventive

Maintenance Instructions"

CEP 5.04, Rev. 3, " Work Packages"

-

CEP 6.02, Rev. 7, " Control and Distribution of Construction Engineering

Procedures, Quality Control Instructions, Receiving Inspection, Storage

and Preventive Maintenance Instructions; and Manuals"

c.

The following documents control control of material:

QAPP 7, Rev. 2, " Control of Purchased Material, Equipment and Services"

QAPP 8, Rev. O, " Identification and Control of Material, Parts and

Components"

QAPP 13, Rev. O, " Handling, Storage and Shipping"

QAPP 15 Rev. 1, " Nonconforming Material, Parts, and Components"

l

l

.

%

.

-

r-

.

.

-6-

,

CEP 7.02, Rev. 5, " Receiving Inspection"

CEP 8.01, Rev. 2, " Identification and Markings of Materials, Parts,

and Components"

CEP 8.02, Rev. 4, " Warehouse Control Materials, Parts, and Components"

CEP 8.03, Rev. 10, " Control of Welding Materials"

CEP 13.01, Rev. 2, " Handling of Nuclear Components"

CEP 13.02, Rev. 2, " Storage and Preservation of Materials, Components

and Systems"

'

CEP 13.03, Rev. 1, " Warehouse Storage area Inspection"

CEP 14.01, Rev. 1, " Inspection and Test Status"

CEP 15.01, Rev. 13, "Conttol of Quality Control Investigation Reports"

CEP 15.03, Rev. 2, " Control of Nonconformance Report"

d.

The following documents control special process:

QAPP 9, Rev. O, " Control of Special Process"

CEP 2.05, Rev. 5, " Qualification, Training, and Certification NDE

Personnel"

CEP 2.10, Rev. 4, " Qualification and Certification of Inspection, and

Testing Personnel"

CEP 2.11, Rev. 3, " Qualification of Welders and Welding Operators"

CEP 9.01, Rev. 5, " Release for Drilling, Chipping, Excavation, Cutting

Welding, Bonding and Sandblasting of Permanent Plant Features",

CEP 9.03, Rev.

O, " Qualification of Welding Procedures"

CEP 9.08, Rev.

O, " Process Control"

e.

The following documents control test equipment:

QAPP 11, Rev. O, " Test Control"

QAPP 12, Rev. O, " Control of Measuring and Test Equipment"

"

.

- -

-

- -

- - - . .

.

-

,

,.

.

I

s

-7-

e

6

CEP 12.01, Rev. 5, " Control of Measuring and Test Equipment"

CEP 12.02, Rev. O, " Control of Certified Tools Used for Quality Work"

Within the area inspected, no items of noncompliance or deviations

were identified.

.