ML19309F428

From kanterella
Jump to navigation Jump to search
Corrections to Monthly Operating Rept for Mar 1980
ML19309F428
Person / Time
Site: Arkansas Nuclear 
Issue date: 04/11/1980
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19309F427 List:
References
NUDOCS 8004290451
Download: ML19309F428 (3)


Text

oU AVER AGE D AILY UNIT POWER LEVEL DOCKET No.

50-368 IJNIT -2 DATE 4/11/80 C0\\fPLETED BY Pov Pondoraraft TELEPHONE 501/968-2519 MONm March, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe NetI tMWe-Net) 1 0

17 0

0 0

is 0

3 19 0

0 4

20 66 0

309 5

2r 0

112 6

22 0

19 0

3 24 577 0

9 25 836,

0 891 ' T lo

'6 C mmercial Operation 0

ii 2;

891 0

g, 80 2s l3 0

29 263 0

14 30 863 0

is 31 886 16 0

INSTRUCTIONS On this format. fist the 4.

4;e inly unit pimer inei in MWe Net for each da) :n the re;iotting inonth. Compute to the nearest whole megawrt (9/;7 5 i

NON-COMMERICAL OPERATION DATA EtiD OPERATING DATA REPORT DOCKET NO.

50-368 DATE d /11/Rn C051PLETED BY R. A Pandergraft TELEPHONE E01/QFR-?519 OPERATING STATUS Notes

1. Unit Name:

Arb ne'c *Plear one - Unit ?

Reporting Period: March 1-25. 1980

3. Licensed Thermal Power (51Wt): ?RI R
4. Nameplate Rating (Gross Siwe 1: 959 019
5. Design Electrical Rating (Net S!We):

NA

6. Stasimum Dependable Capacity (Gross 51We):

NA

7. 31asimum Dependable Capacity (Net 31Wel:

S. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reasons:

tior.e

9. Power Lesel To which Restrictei If Anv (Net 31We):

None NA'

10. Reasons For Restrictions. lf An> :

This N1onth Yr..to.Date Cumulatise

11. Hours In Reporting Period 600.0 2040.0 11544.0
12. Number Of Hour, Reactor was critical 127.2 818.2 4646.6 0.0 30.5 2323.6
13. Reactor Re>ene Shutdown Hours

.k.0 740.1 3777.0

14. Hours Generator On.Line
13. Unit Re>ene Shutdown Haur>

nn nn 91 7

16. Gross Thermal Energy Generated t.\\t%Hi 176304.0 1400770.0 490s:nR1 n
17. Grow Electrical Energy Generated (SIWHi 54318.0 49:145.0 1472430.0 Is. Net Electrical Energy Generated t.\\thH) 50234.0

_.450468.0 1346277.0

19. Unit Senice Factor I
20. Unit Asailability Factor
21. Unit Capacity Factor tC>ing stDC Neti

_d NA Until Fn'-"arcial 0,nora tinn D

22. Unit Capacity Factor iUsing DER Net)

I

23. Unit Fo'rced Outage Rate

]

24. Shutdown > Scheduled Oser Ne.st 6.\\tonths (Type. Date,and Duration of Eacht:

[

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITI A L CRITIC.\\ LITY 19/8:/78 INITI \\ L ELECTRICITY 12/26/78 l

CO\\l\\lERCI A L OPER ATION 3/25/80 l

(0/77)

DATE: March, 1980 REFUELING INFORMATION 1.

Name of facility.

Arkansas Nuclear One - Unit 2 2.

Scheduled date for next refueling shutdown. 3/19/81 l

3.

Scheduled date for restart following refueling. 5/19/81 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license a=endment?

If answer is yes, what, in general, will these be?

If answer is no, has the reload fuel design and core c6nfiguration been reviewed by your Plant Safety Review Co=mittee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

Yes. Description of effects of new core loadin'g.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information. 1/19/81 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or perfor=ance analysis methods, significant thanges in fuel design, new operating procedures.

None 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. a) 177 b) 58 (new. nnrrally stored in new fuel pit) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

present dR6 increase size by n

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assu=ing the present licensed capacity.

DATE:

logo l

l l