Forwards Interim Rept for Potentially Reportable Deficiency 80/05 Re Electrical Cable Insulation Damage Sustained During Cable Pulling Process
ML19309F205
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 04/11/1980
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309F206 List:
References
AECM-80-73, NUDOCS 8004280610
Download: ML19309F205 (1)


Text

. . . . _ . . . . . - . - - - -

M@

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0, J A C K S O N, MI S SIS SIP PI 3 9 2 0 5 a

April 11, 1980 --

PRODUCTION DEPARTMENT _j "

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission .t Region II y 101 Marietta St., N.W., Suite 3100 g Atlanta, Georgia 30303 ..

o Attention: Mr. J. P. O'Reilly, Director .::

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0272/15525/15526 PRD-80/05, Status Report, Electrical Cable Insulation, Damaged During Pulling Process AECM-80/73 On March 13, 1980, Mississippi Power & Light Company notified Mr. F. Cantrell of your office of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station construction site. The deficiency con-cerns electrical cable insulation damage sustained during the cable pulling process.

This deficiency is currently under investigation. Thus far, our findings indicate that the damaged cable, located in the Control Room HVAC system, would not have adversely affected the safety of plant operations.

However, our study is continuing to determine the extent and implications of this problem.

We expect to provide to you our final report and determination of re-portability on this matter by June 23, 1980. Our findings and corrective actions, to date, are summarized in the attached status report on PRD-80/05.

- Yours truly, l

L. F. Dale Nuclear Project Manager JGC/JDR:ts Attachment 2U

( cc: Mr. N. L. Stampley ,

Mr. R. B. McGehee l Mr. Victor Stello, Jr., Director  !! l Division of Inspection & Enforcement U. S. Nuclear Regulatory Commission l

,j j Washington, D. C. 20555 '

l t .

Member Middle South Utilities System

&TICIAL 60Pk 800.4280610