ML19309E659

From kanterella
Jump to navigation Jump to search
Forwards Revised LER 79-074/03L-1
Date released: 11/19/2019 Download: ML19309E659


Revised LER 79-074/03L-1:on 790707,auxiliary Feedwater Pump Suction Pressure Switch Inoperability Made Auxiliary Feedwater Train Inoperable.Caused by Wrong Type Switch Being Installed.Switches Replaced
ML19309E667
Person / Time
Site: Davis Besse 
Issue date: 08/02/1979
From: Hitchens D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19309E667 (3)
Forwards Revised LER 79-074/03L-1
ML19309E657
Person / Time
Site: Davis Besse 
Issue date: 04/16/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19309E657 (1)