ML19309E632

From kanterella
Jump to navigation Jump to search
Forwards LER 80-035/03L-0
Date released: 11/19/2019 Download: ML19309E632


LER 80-035/03L-0:on 800321,during Calibr Procedure HNP-2-5329,all But Six Accumulator Pressure Switches Found to Be Outside Tech Specs.Caused by Personnel Error & Component Failure.Pressure Switches Recalibr
ML19309E643
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/17/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309E643 (2)
Forwards LER 80-035/03L-0
ML19309E631
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/17/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309E631 (1)