ML19309E232
| ML19309E232 | |
| Person / Time | |
|---|---|
| Site: | 02700047, 04000672 |
| Issue date: | 03/05/1980 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Tuffin W NUCLEAR METALS, INC. |
| Shared Package | |
| ML19309E233 | List: |
| References | |
| NUDOCS 8004210029 | |
| Download: ML19309E232 (1) | |
Text
_ ---
m 8
UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION g
a REGION I os 631 PARK AVENUE I
KING OF PRUSSIA, PENNSYLVANIA 19406
.....,o Docket No. 40-0672 p,
5 m.)
Nuclear Metals, Inc.
ATTN: Mr. W. B. Tuffin President 2229 Main Street Concord, Massachusetts 01742
[
Gentlemen:
i
Subject:
Inspection No. 15000039/79-06A This refers to an unannounced inspection conducted by R. A. Brown of our Region II office on Novemoer 26, 27, and 28,1979. A shipment of radioactive waste shipped from your facility was inspected upon arrival at the Chem-Nuclear Systems, Inc., Barnwell, South Carolina disposal site.
Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of a i
review of the shipping papers, placarding and labeling requirements, radiation measurements, selective cortamination surveys, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NFC's Public Document Room.
If this report contains any information that you (cr rur contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separata part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, I
t Geo e
. Sm th, Chief Fue Facility and Materials S fety Branch
~
Enclosure:
Inspection Report No. 15000039/79-05A 8 0 04210 0A3