ML19309D842
| ML19309D842 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/08/1977 |
| From: | Rueter D ARKANSAS POWER & LIGHT CO. |
| To: | Howard E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19309D843 | List: |
| References | |
| 1-097-6, 1-97-6, NUDOCS 8004110702 | |
| Download: ML19309D842 (1) | |
Text
1. e /g 7
1 G Q{ {
f n eLeona au La snxansa ARK ANS AS POWER & LIGHT COMPANY
- C. SOM Sei L,T TI.. A.O K, A A K AN S A. 72203.(501337*-4000 September 8, 1977 f~
.' ~
/[') f r#fUi,'!O k,.
j
.. ~., <
\\
i 1977
\\
[__;u.%C'7,g %
1-097-6 Ti
%Mje.v f.j Mr. E. Morris Howard, Director
{d's.gN,)N b,'
Office of Inspection 6 Enforcement N!
Region IV U. S. Nuclear Regulatory Cammission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
Subject:
Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 Reportable Occurrence Report No. 50-313/77-15 s
(File: 0520)
Gentlemen:
J l
In accordance with Technical Specification 6.12.3.1, we have attached the subject report concerning the inoperability of the Hydrogen Purge System due to its inability to achieve an adequate flow rate during surveillance testing.
Very truly yours,
/
Donald A. Ruetor Manager, Licensing DAR:REI:tw Attachment cc: Mr. W. D. MacDonald, Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555 9O cc: Dr. E. Volgenau, Director 8004110 (
Office of Inspection S Enforcement l
U. S. Nuclear Regulatory Commission l
Washington, D. C.
20555 J
g_._...__...7-..m......._
....., ~.. _.... _..