Nonroutine Nonradiological Environ Rept 50-313/75-28:on 750505,four Parameter Chemical Concentration Increased Across Plant Exceeding ETS Limits.Neutralizing Tank Was Draining Into Discharge Canal During Sampling
ML19309D759
Person / Time
Site: Arkansas Nuclear 
Issue date: 05/06/1975
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To:
References
NUDOCS 8004110648
Download: ML19309D759 (1)


Text

r*

~~

n

,m

(

}

H EL PIN G BUILD AnKANSAS v

ARK ANS AS POWER G LIGHT COMPANY STH & LQ'J131 AN A STAEETS LITTLE AOCK. A AK ANS AS 72203.(5013372-4311 May 6, 1975 TELECOPY Mr. E. Morris Howard, Director Office of Inspection and Enforcement Region IV, Suite 1000 611 Ryan Plaza Drive Arlington, Texas 76012 g

g

~

Subject:

Arkansas Power 6 Light Company g

Nfy]ril[ip,7 p p

Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 t N 221975 w Non-Routine, Non-Radiological L

a; g 7"M ad E;,'er "

Environmental Report 1

7 No. 50-313/75-28

'b Dear Mr. Howard

,f (A)

Samples taken in the intake and discharge canals on the afternoon of

\\/ -

May 5,1975, indicate chemical concentrations of four (4) parameters f

increased across the plant in excess of Environmental Technical Specification limits. These parameters and their measured values are as follows:

l' Increase from ETS limit on Parameter Units Intake to Discharge increase 5

a) Sodium Nitrite mg/l 0.25 0.005 b) Turbidity 20

~10 i

c) Ammonia mg/l 1.44 0.05 d) Hydrazine mg/l 0.214 0.05 I

The samples were taken while the neutralizing tank was being urained l

~

into the discharge canal. No other liquid releases were being made and

/

no screen washing and/or trash grinding was in progress.

1 The plant was in the startup mode at the time these measurements were made.

Very truly yours, (d

Y J. D. Phillips N

  • N pl Senior Vice P sident

\\%'

JDP:ay 8004110 N F5c2s T Ax A AYING. INVESTO A CWNEO MC8M B E A MID OLE SOUTH UTILITIE S SY STE M e