ML19309D750

From kanterella
Jump to navigation Jump to search
Forwards LER 80-019/01T-0
Date released: 11/19/2019 Download: ML19309D750


LER 80-019/01T-0:on 800325 Reactor Flux/Flow Trip Setpoints Were Not Verified to Be Properly Reset within 4-h of Manual Shutdown of Rcp.Caused by Attention Given to Feedwater Swings.Trip Setpoints Verified Later
ML19309D752
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/03/1980
From: Kocis R, Stotz J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19309D752 (3)
Forwards LER 80-019/01T-0
ML19309D749
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/03/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19309D749 (1)