ML19309D656
| ML19309D656 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 03/13/1980 |
| From: | Wandke N COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8004110087 | |
| Download: ML19309D656 (1) | |
Text
/
o3 Zion Generating Station
.j.j/ b' 44 C mmonw;;:lth Edison Shiloh Blvd. & Lake Michigan E
--V /
Zion,Illino:s 60099
\\
Telephone 312/746-2084 r
March 13, 1980 James G.
Keppler, Regional Director Directorate of Regulatory Operations - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler,
Zion Station will be performing Inservice Inspection activities on Unit 2 during the upcoming refueling outage.
i The inspections will include volumetric, surface and visual inspections of Class 1 and 2 components.
These inspections are presently scheduled to begin May 12, 1980 and will extend through approximately June 13, 1980.
We expect to have the detailed inspection program and procedures available by the last week of April for pre-inspection review by your staff.
Scheduling of this meeting.and any other questions can be answered by contacting Mr.
R.
E.
Shannon (746-2084 Ext. 248) at the station.
I k
N. E. Wandke Superintendent Zion Station RES/dh cc:
J. J.
Marianyi l
1 i
I MAR 2 4 1980 8 0041100(r]
g w.
,w
-a