Responds to IE Bulletin 79-23.Conducted Sustained full-load Operational Test on Emergency Diesel Generator 3A.Test Demonstrated Ability of Diesel Generators to Function Properly Over 24-h Period at Specified Loads
ML19309D436
Person / Time
Site: Browns Ferry  
Issue date: 03/21/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-23, NUDOCS 8004100364
Download: ML19309D436 (1)


Text

'

f/0 TENNEOSEE VALLEY AUTHORITY

[NI JWo CH ATTANOOGA, TENNESSEE 37401 400 Chestnut Street Tower II March 21, 1980

.-i r

a Mr. James P. O'Reilly, Director

?)

Office of Inspection and Enforcement

e..

U.S. Nuclear Regulatory Commission Region II - Suite 3100 m

101 Marietta Street er Atlanta, Georgia 30303

Dear Mr. O'Reilly:

~

~

OFFICE OF INSPECTION AND ENFORCEMENT (IE) BULLETIN 79-23, DATED SEPTEMBER 12, 1979, J. P. O'REILLY TO H. G. PARRIS In response to IE Bulletin 79-23 we have conducted a sustained full-load operational test on emergency diesel generator 3A at the Browns Ferry Nuclear Plant. The test was completed on January 6, 1980.

This test, with a typical diesel generator, demonstrated the ability of the diesel generators to function properly over a 24-hour period at the specified loads.

The successful completion of this testing completes the action required by IE Bulletin 79-23 for Browns Ferry. If you have any questions, please call Jim Domer at FTS 854-2014.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Mana er Nuclear Regulatf M and Safety

~

i 4.M-An Equal Opportunity Employer l

8004100364 o

3