ML19309D265

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-0033/79-13 on 791217-20.Noncompliance Noted: SNM Protection.Details Withheld (Ref 10CFR2.790)
ML19309D265
Person / Time
Site: 07000033
Issue date: 02/07/1980
From: Bailey R, Devlin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19309D263 List:
References
70-0033-79-13, 70-33-79-13, NUDOCS 8004100191
Download: ML19309D265 (1)


Text

.

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION I Report No. 70-33/79-13 Docket No. 70-33 License No. SNM-23 Safeguards Group 1

Licensee: Texas Instruments, Incorporated 34 Forest Street Attleboro, Massachusetts 02703 Facility Name: Texas Instruments, Incorporated Inspection At: Attleboro, Massachusetts 02703 Inspection Conducted: December 17-20, 1979 Date of Last Physical Security Inspection Visit: July 30-31, 1979 Type of Inspection:

Unannounced Physical Security Inspectors:

bah 2*$

/

..7 -.

R. J. Bailey,, Physical Security Inspector date date date F

7 Approved by:

J. W. Devlin, Chief, Security Section, ~

/dat'e Safeguards Branch Inspection Summary:

Inspection on December 17-20, 1979 (Report No. 70-33/79-13)

Areas Inspected:

Routine, unannounced physical security inspection of the licensee's approved security plan and applicable sections of Materials and Plant Protection Amendment MPP-2, to include Access Control, detection aids, response controls, central alarm and communication system, testing and main-tenance, SNM protection and reports of incidents.

The inspection was initiated during the offshift and involved 25 inspector-hours onsite by one NRC regional based inspector.

Results: Of the seven areas inspected, no apparent items of noncompliance were identified in six areas; one apparent item of noncompliance was identified in one area; SNM Protection (Infraction, Paragraph 8),79-13-01.

Region I Form 167 (August 1979) 8004100

/