k.N 74 BALTIMORE GAS AND ELECTRIC COMPANY P. O. BOX 1475 BALTIMOR E, M ARYLAN D 21203 March 3, 1980 Antwun E. LuNovALL.Ja.
Vect Persiopet sv. u Mr. Boyce H. Grier, Director Region I, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19h06
Subject:
Calvert Cliffs Nuclear Power Plant Units Nos. 1 and 2, Dockets Nos. 50-317 & 50-318 IE Bulletin 79-01B
Dear Mr. Grier:
The enclosed report constitutes our h5-day response to the subject Bulletin, whi::h was received by us on January 17, 1980. The report reflects the clarifications received from NRC via telecopier on February 28, 1980 and is structured as follows:
Section A (Bulletin Item 1): This section is a " master list" of the safety-related electrical equipment which is exposed to harsh environments as a result of LOCA or HELB including areas where fluids are recirculated from inside containment to accomplish long-term cooling following a LOCA.
Section B (Bulletin Item 2): This section contains the system comoonent evaluation work sheets for the equipment listed in Section A of the report.
Items not having adequate qualification data available are indicated by "NTEl" on the work sheet. This action should be completed by May 31, 1980.
Section C (Bulletin Item 3): This section provides a tabulation of the service conditions to which the equipment may be exposed. We have provided the maximum parameter for each value in our tabulation; therefore the parameter shown in the report may be greater than that required for the equipment requirements.
If you have any questions concerning this information, please Call US.
BALTIMORE GAS AND ECTRIC COMPANY By.
M ? ),co d48 L -A. E. Ldndvall, Jr.
/
Vice President - Supply
/
l l
l 8 0 0 4 0 9 09't3 l
+
I
.s..,s Mr. B. H. Grict March 3, 1980 STATE OF MARYLAND:
- TO WIT:
CITY OF BALTIMORE:
Mr. A. E. Lundvall, Jr. being duly sworn, states that he is Vice President of the Baltimore Gas and Electric Company, a corporation of the State of Maryland; that he executed the foregoing report for the purposes therein set forth; that the statements made in said report are true and correct to the best of his knowledge, information and belief; and that he was authorized to execute the report on behalf of said corporation.
n WITNESS gy hand and Notarial Seal.
LLb'
?l_ U-
/
s
' + ' '- ) ( -
f
~
)
My Commission Expires:
Y u
J cc:
J. A. Biddison, Esquire G. F. Trowbridge, Esquire Mr. E. L. Conner, Jr. - NRC (w/ enc 1)
Director, Division of Reactor Operations Inspection Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 (w/ enc 1) m
!