ML19309C344

From kanterella
Jump to navigation Jump to search
Forwards LER 80-013/03L-0
Date released: 11/19/2019 Download: ML19309C344


LER 80-013/03L-0:on 800303,channel Zf Pressure Input Signal for Steam Generator Isolation 22 Was Bypassed.Caused by Signal Isolater 2-E/E-1023C Being Out of Calibr Due to Nonlinear Response
ML19309C350
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 04/02/1980
From: Heibel R, Rizzo P
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19309C350 (2)
Forwards LER 80-013/03L-0
ML19309C343
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 04/02/1980
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19309C343 (1)